If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-31274 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.851961,"lon":-79.558244,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: East Franklin Township | |
Operator Name: SNYDER BROS INC | |
Well Pad ID: 154091 | |
Farm/Lease Name: NOLDER | |
License Status: | |
Spud Date: | |
Permit Date: 2017-03-20 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.851961 | |
Longitude: -79.558244 |
Date | Event |
---|---|
2017-03-20 | New Permit Application |
2017-04-24 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-06-24 | 2018-08-04 | 6,583 | 19,355,100 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | KSI-22 | Keane | Scale Inhibitor | 2-propenoic acid, polymer with 2-methyl-2-[(1-oxo-2- propenyl)amino]-1-propensulfonic acid monosodium salt and sodium phosphinite |
110224-99-2 | 10 | 0.0022075 | 3974.56 |
Methanol | 67-56-1 | 50 | 0.0110375 | 19872.8 | ||||
KFR-16FW | Keane | Friction Reducer | Distillates (petroleum), hydrotreated light | 64742-47-8 | 20 | 0.00138762 | 2498.38 | |
oleic acid diethanolamide | 93-83-4 | 1.5 | 0.000104071 | 187.378 | ||||
Water | 7732-18-5 | 60 | 0.00416285 | 7495.13 | ||||
ammonium chloride | 12125-02-9 | 1.5 | 0.000104071 | 187.378 | ||||
alcohols, C12-16, ethoxylated | 68551-12-2 | 1 | 0.00006938 | 124.919 | ||||
KAI-12 | Keane | Acid Inhibitor | Fatty imidazoline | 61790-69-0 | 5 | 0.00005891 | 106.061 | |
Alcohols, C7-9-iso-, C8-rich | 68526-83-0 | 5 | 0.00005891 | 106.061 | ||||
xylene | 1330-20-7 | 5 | 0.00005891 | 106.061 | ||||
Methanol | 67-56-1 | 90 | 0.00106032 | 1909.09 | ||||
ethylbenzene | 100-41-4 | 1 | 0.00001178 | 21.212 | ||||
isoproyl alcohol | 67-63-0 | 5 | 0.00005891 | 106.061 | ||||
prop-2-yn-1-ol | 107-19-7 | 5 | 0.00005891 | 106.061 | ||||
Hydrochloric Acid (15%) | Keane | Acid Inhibitor | Water | 7732-18-5 | 85 | 0.468796 | 844059 | |
Hydrochloric Acid | 7647-01-0 | 15 | 0.0827288 | 148952 | ||||
Sand (Proppant) | Keane | Proppant | Crystalline silica: Quartz (SiO2) | 14808-60-7 | 100 | 9.67159 | 17,413,500.0 | |
KFR-36 | Keane | Friction Reducer | Distillates (petroleum), hydrotreated light | 64742-47-8 | 60 | 0.0150132 | 27031 | |
MBC-516 | Keane | Biocide | didecyldimethylammonium chloride | 7173-51-5 | 8 | 0.0010678 | 1922.56 | |
glutaral | 111-30-8 | 26.7 | 0.00357721 | 6440.7 | ||||
quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 5.3 | 0.000711423 | 1280.9 | ||||
Other Chemical(s) | Listed Above | See Trade Name(s) List | ethylbenzene | 100-41-4 | 1 | 0.00001178 | 21.212 | |
oleic acid diethanolamide | 93-83-4 | 1.5 | 0.000104071 | 187.378 | ||||
isoproyl alcohol | 67-63-0 | 5 | 0.00005891 | 106.061 | ||||
Fatty imidazoline | 61790-69-0 | 5 | 0.00005891 | 106.061 | ||||
quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 5.3 | 0.000711423 | 1280.9 | ||||
alcohols, C12-16, ethoxylated | 68551-12-2 | 1 | 0.00006938 | 124.919 | ||||
xylene | 1330-20-7 | 5 | 0.00005891 | 106.061 | ||||
2-propenoic acid, polymer with 2-methyl-2-[(1-oxo-2- propenyl)amino]-1-propensulfonic acid monosodium salt and sodium phosphinite |
110224-99-2 | 10 | 0.0022075 | 3974.56 | ||||
Distillates (petroleum), hydrotreated light | 64742-47-8 | 20 | 0.00138762 | 2498.38 | ||||
prop-2-yn-1-ol | 107-19-7 | 5 | 0.00005891 | 106.061 | ||||
ammonium chloride | 12125-02-9 | 1.5 | 0.000104071 | 187.378 | ||||
Alcohols, C7-9-iso-, C8-rich | 68526-83-0 | 5 | 0.00005891 | 106.061 | ||||
Water | 7732-18-5 | 85 | 0.468796 | 844059 | ||||
didecyldimethylammonium chloride | 7173-51-5 | 8 | 0.0010678 | 1922.56 | ||||
Water | Snyder Brothers, Inc | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 89.7083 | 161,518,000.0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | SNYDER BROS INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | SNYDER BROS INC | 555,478.00 | 66 | 0.00 | 0 | 0.00 | 0 |
2019 | SNYDER BROS INC | 1,292,428.00 | 352 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | SNYDER BROS INC | Drill Cuttings | 26.34 Tons | INJECTION DISPOSAL WELL | 34-155-24079 |
2017 | SNYDER BROS INC | 2,203.75 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 | |
2017 | SNYDER BROS INC | 253.92 Tons | LANDFILL | 100585 | |
2017 | SNYDER BROS INC | Drill Cuttings | 1,065.15 Tons | LANDFILL | 100585 |
2017 | SNYDER BROS INC | Drilling Fluid Waste | 2,261.22 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2018 | SNYDER BROS INC | Produced Fluid | 771.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2018 | SNYDER BROS INC | Synthetic Liner Materials | 1.92 Tons | LANDFILL | 100585 |
2018 | SNYDER BROS INC | Produced Fluid | 23,586.20 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2018 | SNYDER BROS INC | Produced Fluid | 92.73 Tons | LANDFILL | 100585 |
2019 | SNYDER BROS INC | Produced Fluid | 1,026.10 Bbl | INJECTION DISPOSAL WELL | 34-099-23171 |
2019 | SNYDER BROS INC | Synthetic Liner Materials | 2.16 Tons | LANDFILL | 100585 |
2019 | SNYDER BROS INC | Produced Fluid | 17,346.90 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2019 | SNYDER BROS INC | Produced Fluid | 4,136.20 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2584994 | Primary Facility | 2017-04-20 | Preoperation Inspection | No Violations Noted | Site construction had been completed. All access road and site erosion controls had been implemented as outlined in the E&S plan contained within the ESCGP. All controls appeared to be functioning properly. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2591824 | Primary Facility | 2017-05-09 | Drilling/Alteration | No Violations Noted | Spudded 4/25/2017. Ran 42' of 30" casing-cemented to surface-covered with steel plate until Rig arrives. Paper work in place and site looks ok. |
2608096 | Primary Facility | 2017-06-26 | Drilling/Alteration | No Violations Noted | Top hole Rig had drilled this well to the kick off point - moved to the next hole and covered the celler with a steel plate. Site looks ok. |
2617266 | Primary Facility | 2017-07-20 | Routine/Complete Inspection | No Violations Noted | Drilling was ongoing for the Nolder 1H at the time of the inspection. Well-site secondary containment located onsite and it appeared to be in sound condition and functioning as intended. Drill cuttings are being collected to be hauled offsite for disposal. All site and access road erosion controls had been installed properly and were functioning properly. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2624940 | Primary Facility | 2017-08-07 | Drilling/Alteration | No Violations Noted | Well drilled to kick off point-casing covered over with steel plate waiting for finishing rig. All equipment on site looked ok. |
2635212 | Primary Facility | 2017-09-11 | Routine/Complete Inspection | No Violations Noted | Drilling was ongoing for Nolder 4H at the time of the inspection. Secondary containment was located onsite. There were no issues observed in relation to the secondary containment. All site and access road controls had been implemented and maintained as outlined in the E&S plan contained within the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2661653 | Primary Facility | 2017-11-16 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well 2H drilled, not yet frac'd. 3H, 4H, 1H drilled, not yet frac'd. Rig not on-site. No tanks on-site. Pad containment remains on-site. |
2683712 | Primary Facility | 2018-01-18 | Routine/Partial Inspection | No Violations Noted | At time of inspection, well 2H drilled, not yet frac'd. Wells 1H, 3H, and 4H also drilled, not yet frac'd. No rig on-site. |
2705263 | Primary Facility | 2018-03-14 | Routine/Complete Inspection | No Violations Noted | This well has been drilled and is waiting on frac. The well head casing, cellar, protective grating, containment and piping on site looks ok. |
2713770 | Primary Facility | 2018-03-20 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well 2H drilled, not yet frac'd. Wells 1H, 3H, 4H also drilled, not yet frac'd. No rig on-site. |
2724808 | Primary Facility | 2018-04-18 | Routine/Partial Inspection | No Violations Noted | At time of inspection, well 2H drilled, not yet frac'd. Wells 1H, 3H, 4H also drilled, not yet frac'd. No rig on-site. |
2748316 | Primary Facility | 2018-07-03 | Routine/Complete Inspection | No Violations Noted | At time of inspection, frac'g equipment and crew on-site preparing to resume stimulation operations. Keane safety representative Carl on-site. |
2760920 | Primary Facility | 2018-08-07 | Routine/Complete Inspection | No Violations Noted | This well has been fracked and is awaiting the snubbing unit to drill out the plugs. The well head and equipment looks ok. |
2798075 | Primary Facility | 2018-11-05 | Routine/Complete Inspection | No Violations Noted | Flow back operations have been completed on this well and it has the new well head and equipment installed and is awaiting turn on to the new pipeline. The well head casing, piping, production set equipment, containment dike and tank battery look ok. |
2821141 | Primary Facility | 2019-01-02 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production with the annulus open. The well head casing, piping, production set equipment, containment dike and tank battery look ok. |
For data sources see[8]