If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-31281 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.869167,"lon":-79.566011,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: East Franklin Township | |
Operator Name: SNYDER BROS INC | |
Well Pad ID: 153958 | |
Farm/Lease Name: DYNAMITE | |
License Status: | |
Spud Date: | |
Permit Date: 2017-01-31 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.869167 | |
Longitude: -79.566011 |
Date | Event |
---|---|
2017-01-31 | New Permit Application |
2017-02-13 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-08-07 | 2017-10-13 | 6,430 | 17,938,700 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand (Proppant) | Producers Service Corp / Keane | Proppant | Silica Substrate | 14808-60-7 | 100 | 9.30403 | 15,510,500.0 |
SI-1171 | Producers Service Corp | Scale Inhibitor | Copolymer of Maleic and Acrylic Acid | 52255-49-9 | 10 | 0.000145608 | 242.739 | |
DETA phosphonate | 15827-60-8 | 3 | 0.00004368 | 72.822 | ||||
Phosphino Carboxylic Acid Polymer | 71050-62-9 | 3 | 0.00004368 | 72.822 | ||||
Hexamethylene Triamine Penta | 34690-00-1 | 3 | 0.00004368 | 72.822 | ||||
7.5% HCL | Keane | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0315153 | 52538.2 | |
Water | 7732-18-5 | 92.5 | 0.388689 | 647971 | ||||
Water | Snyder Brothers | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 89.7974 | 149,698,000.0 | |
KSI-19NW | Keane | Scale Inhibitor | Methanol | 67-56-1 | 30 | 0.00447503 | 7460.18 | |
15% HCL | Producers Service Corp / Keane | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.055782 | 92992.5 | |
KAI-12 | Keane | Acid Inhibitor | isoproyl alcohol | 67-63-0 | 5 | 0.00005584 | 93.093 | |
ethylbenzene | 100-41-4 | 1 | 0.00001117 | 18.619 | ||||
Fatty imidazoline | 61790-69-0 | 5 | 0.00005584 | 93.093 | ||||
xylene | 1330-20-7 | 5 | 0.00005584 | 93.093 | ||||
Methanol | 67-56-1 | 90 | 0.00100516 | 1675.67 | ||||
Alcohols, C7-9-iso-, C8-rich | 68526-83-0 | 5 | 0.00005584 | 93.093 | ||||
prop-2-yn-1-ol | 107-19-7 | 5 | 0.00005584 | 93.093 | ||||
BIO CLEAR 1430 | Producers Service Corp | Biocide | Dimethylamine | 68439-70-3 | 0.5 | 0.00000740 | 12.334 | |
Glutaraldehyde | 111-30-8 | 20 | 0.000295953 | 493.373 | ||||
Alkyl dimethyl benzyl ammonium chloride | 68424-85-1 | 5 | 0.00007399 | 123.343 | ||||
NEFE-180 | Producers Service Corp | Corrosion Inhibitor/Iron Control | Alcohols, C14-15, ethoxylated | 68951-67-7 | 5 | 0.00000793 | 13.218 | |
Fatty Acids, tall oil | 61790-12-3 | 5 | 0.00000793 | 13.218 | ||||
2-Ethylhexanol | 104-76-7 | 10 | 0.00001586 | 26.437 | ||||
2-Propyn-1-ol | 107-19-7 | 5 | 0.00000793 | 13.218 | ||||
Methanol | 67-56-1 | 35 | 0.00005550 | 92.529 | ||||
Acetic Acid | 64-19-7 | 65 | 0.000103079 | 171.84 | ||||
Coconut oil acid diethanolamine | 68603-42-9 | 5 | 0.00000793 | 13.218 | ||||
Other Chemical(s) | Listed Above | See Trade Name(s) List | Dimethylamine | 68439-70-3 | 0.5 | 0.00000740 | 12.334 | |
ammonium chloride | 12125-02-9 | 1.5 | 0.00100035 | 1667.65 | ||||
oleic acid diethanolamide | 93-83-4 | 1.5 | 0.00100035 | 1667.65 | ||||
2-Ethylhexanol | 104-76-7 | 10 | 0.00001586 | 26.437 | ||||
alcohols, C12-16, ethoxylated | 68551-12-2 | 1 | 0.0006669 | 1111.77 | ||||
Water | 7732-18-5 | 92.5 | 0.388689 | 647971 | ||||
Phosphino Carboxylic Acid Polymer | 71050-62-9 | 3 | 0.00004368 | 72.822 | ||||
Alkyl dimethyl benzyl ammonium chloride | 68424-85-1 | 5 | 0.00007399 | 123.343 | ||||
Distillates (petroleum), hydrotreated light | 64742-47-8 | 20 | 0.013338 | 22235.4 | ||||
ethylbenzene | 100-41-4 | 1 | 0.00001117 | 18.619 | ||||
Fatty Acids, tall oil | 61790-12-3 | 5 | 0.00000793 | 13.218 | ||||
isoproyl alcohol | 67-63-0 | 5 | 0.00005584 | 93.093 | ||||
Alcohols, ethoxylated | 68439-50-9 | 3.1 | 0.000403839 | 673.227 | ||||
Methanol | 67-56-1 | 35 | 0.00005550 | 92.529 | ||||
DETA phosphonate | 15827-60-8 | 3 | 0.00004368 | 72.822 | ||||
Alcohols, ethoxylated | 68002-97-1 | 3.1 | 0.000403839 | 673.227 | ||||
Alcohols, C14-15, ethoxylated | 68951-67-7 | 5 | 0.00000793 | 13.218 | ||||
prop-2-yn-1-ol | 107-19-7 | 5 | 0.00005584 | 93.093 | ||||
quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 5.3 | 0.000403297 | 672.323 | ||||
Fatty imidazoline | 61790-69-0 | 5 | 0.00005584 | 93.093 | ||||
Alcohols, C7-9-iso-, C8-rich | 68526-83-0 | 5 | 0.00005584 | 93.093 | ||||
xylene | 1330-20-7 | 5 | 0.00005584 | 93.093 | ||||
Coconut oil acid diethanolamine | 68603-42-9 | 5 | 0.00000793 | 13.218 | ||||
Hexamethylene Triamine Penta | 34690-00-1 | 3 | 0.00004368 | 72.822 | ||||
didecyldimethylammonium chloride | 7173-51-5 | 8 | 0.000605325 | 1009.12 | ||||
Alcohols, ethoxylated | 68551-12-2 | 3.1 | 0.000403839 | 673.227 | ||||
2-Propyn-1-ol | 107-19-7 | 5 | 0.00000793 | 13.218 | ||||
KFR-16FW | Keane | Friction Reducer | ammonium chloride | 12125-02-9 | 1.5 | 0.00100035 | 1667.65 | |
Distillates (petroleum), hydrotreated light | 64742-47-8 | 20 | 0.013338 | 22235.4 | ||||
Water | 7732-18-5 | 60 | 0.040014 | 66706.1 | ||||
alcohols, C12-16, ethoxylated | 68551-12-2 | 1 | 0.0006669 | 1111.77 | ||||
oleic acid diethanolamide | 93-83-4 | 1.5 | 0.00100035 | 1667.65 | ||||
MBC-516 | Keane | Biocide | didecyldimethylammonium chloride | 7173-51-5 | 8 | 0.000605325 | 1009.12 | |
quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 5.3 | 0.000403297 | 672.323 | ||||
glutaral | 111-30-8 | 26.7 | 0.00202788 | 3380.61 | ||||
STIMLUBE F | Producers Service Corp | Friction Reducer | Petroleum Distallates | 64742-47-8 | 30 | 0.00390812 | 6515.1 | |
Alcohols, ethoxylated | 68439-50-9 | 3.1 | 0.000403839 | 673.227 | ||||
Alcohols, ethoxylated | 68002-97-1 | 3.1 | 0.000403839 | 673.227 | ||||
Alcohols, ethoxylated | 68551-12-2 | 3.1 | 0.000403839 | 673.227 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | SNYDER BROS INC | 112,425.00 | 10 | 0.00 | 0 | 0.00 | 0 |
2018 | SNYDER BROS INC | 1,512,171.00 | 231 | 0.00 | 0 | 0.00 | 0 |
2019 | SNYDER BROS INC | 1,471,489.00 | 351 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | SNYDER BROS INC | 2,157.50 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 | |
2017 | SNYDER BROS INC | 1,214.40 Tons | LANDFILL | 100585 | |
2017 | SNYDER BROS INC | Drilling Fluid Waste | 2,230.03 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2017 | SNYDER BROS INC | Produced Fluid | 8,246.90 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2017 | SNYDER BROS INC | Produced Fluid | 313.90 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2017 | SNYDER BROS INC | Produced Fluid | 3,753.06 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2017 | SNYDER BROS INC | Synthetic Liner Materials | 2.48 Tons | LANDFILL | 100585 |
2017 | SNYDER BROS INC | Produced Fluid | 46.32 Tons | LANDFILL | 100585 |
2017 | SNYDER BROS INC | Produced Fluid | 1,262.23 Bbl | REUSE (AT WELL PAD) | |
2017 | SNYDER BROS INC | Drill Cuttings | 1,214.40 Tons | LANDFILL | 100585 |
2018 | SNYDER BROS INC | Synthetic Liner Materials | 3.95 Tons | LANDFILL | 100585 |
2018 | SNYDER BROS INC | Produced Fluid | 30,842.50 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2018 | SNYDER BROS INC | Produced Fluid | 1,180.40 Bbl | REUSE (AT WELL PAD) | |
2018 | SNYDER BROS INC | Produced Fluid | 93.80 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2018 | SNYDER BROS INC | Produced Fluid | 63.80 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2018 | SNYDER BROS INC | Produced Fluid | 290.10 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2018 | SNYDER BROS INC | Produced Fluid | 11.30 Tons | LANDFILL | 100585 |
2018 | SNYDER BROS INC | Filter Socks | 1.37 Tons | LANDFILL | 100585 |
2019 | SNYDER BROS INC | Produced Fluid | 10,890.20 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2019 | SNYDER BROS INC | Produced Fluid | 536.40 Bbl | INJECTION DISPOSAL WELL | 34-099-23171 |
2019 | SNYDER BROS INC | Produced Fluid | 18.80 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2019 | SNYDER BROS INC | Produced Fluid | 2,566.10 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2562482 | Primary Facility | 2017-02-16 | Drilling/Alteration | No Violations Noted | Drilling permit on site-log book up to date-6'x6' cellar in place-Rocky Mt. conductor Rig drilled-ran 84' of new 24" pipe. Hit H2O @ 58'. Site looked ok. |
2563719 | Primary Facility | 2017-02-21 | Routine/Complete Inspection | No Violations Noted | Site had been constructed in accordance with the E&S plan contained within the ESCGP. All E&S controls appeared to be functioning properly. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Drilling had commenced but was not ongoing at the time of the inspection. |
2582529 | Primary Facility | 2017-04-13 | Drilling/Alteration | No Violations Noted | Rig resumed drilling 4/10/2017. Ran 866' of 13 3/8" casing-cemented with 704 sks cement-got 25 bbl return. Drilling @ 886' at time of inspection. Drilling log information up to date-all equipment on site looked ok. |
2604743 | Primary Facility | 2017-06-16 | Routine/Complete Inspection | No Violations Noted | Drilling for the Dynamite 2H is anticipated to begin on or about 06/19/17. Drilling was ongoing on the well pad for the Dynamite 3H. Secondary containment onsite and it appeared to be in sound condition. Drill cutting waste containers were onsite on the secondary containment. Drill cuttings are being hauled off-site for disposal. All E&S controls had been properly implemented and maintained. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2612504 | Primary Facility | 2017-07-06 | Drilling/Alteration | No Violations Noted | The Rig was tripping pipe out of the hole getting ready to run and cement 5' production casing at the time of this inspection. Daily drilling info and all equipment on site looked ok. |
2619505 | Primary Facility | 2017-07-27 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, work was ongoing to prep the site for well stimulation activities. Well pad secondary containment had been inspected and patched as necessary after removal of the drilling equipment. All site and access road erosion controls appeared to be functioning properly and there was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2626440 | Primary Facility | 2017-08-14 | Drilling/Alteration | No Violations Noted | Upper manual valve not operating properly. All existing valves will remain on well until HCR can be opened. An extra manual MV will be installed on top to provide an extra barrier. |
2626480 | Primary Facility | 2017-08-15 | Drilling/Alteration | No Violations Noted | Operator waiting on CUD to arrive from Oklahoma to drill out stuck Canary valve. All existing valves will remain on well until HCR can be opened. An extra manual MV will be installed on top to provide an extra barrier. |
2628204 | Primary Facility | 2017-08-21 | Drilling/Alteration | No Violations Noted | This well still has the Canary frac stack well head on it. CUD drilled out top stuck valve but something is plugging well bore at 9' below surface. Well frac is on hold for the time being and is shut in with 3 levels of valve protection. |
2630654 | Primary Facility | 2017-08-28 | Drilling/Alteration | No Violations Noted | The frac crew was waiting on the snubbing unit to remove an unknown object 9' below the surface inside this well bore at the time of this inspection. |
2641947 | Primary Facility | 2017-09-29 | Routine/Complete Inspection | No Violations Noted | Well stimulation equipment is slated to be brought onsite and well stimulation activities resume for the Dynamite 1H beginning Monday October 2, 2017. All site and access erosion controls had been implemented and maintained as outlined in the E&S Plan contained within the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2645785 | Primary Facility | 2017-10-11 | Drilling/Alteration | No Violations Noted | At the time of this inspection Keane is set up and just finished fracking stage 42 of the planned 55 stages to be fracked on this well. All site information and all equipment on site looked ok. |
2648464 | Primary Facility | 2017-10-17 | Routine/Complete Inspection | No Violations Noted | All erosion controls for the site and access road had been implemented and maintained as outlined in the E&S plan. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Secondary containment was located onsite, set in place and maintained as outlined in the Containment plan. Well stimulation activities had been completed. Work was underway to prepare the site and set-up the equipment necessary for drilling out the frac plugs. |
2665260 | Primary Facility | 2017-11-29 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well is drilled and has been stimulated. The remaining three wells on the pad are also drilled and have been stimulated. On-site contractors appear to be preparing and maintaining equipment for the production of the wells. |
2680912 | Primary Facility | 2018-01-10 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well 1H is drilled and appears equipped for production. Wells 2H, 3H, and 4H are also drilled and appear equipped for production. |
2709844 | Primary Facility | 2018-03-26 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, tank battery and containment dike look ok. |
2724365 | Primary Facility | 2018-04-18 | Routine/Partial Inspection | No Violations Noted | At time of inspection, well 1H is drilled and appears equipped for production. Wells 2H, 3H, and 4H are also drilled and appear equipped for production. |
2743236 | Primary Facility | 2018-06-13 | Routine/Partial Inspection | No Violations Noted | At time of inspection, well 1H is drilled and appears equipped for production. Wells 2H, 3H, and 4H are also drilled and appear equipped for production. |
2766733 | Primary Facility | 2018-08-23 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, tank battery and containment dike look ok. |
2818432 | Primary Facility | 2018-12-17 | Site Restoration | No Violations Noted | Inspection conducted in response to Post Drilling Restoration Report received by Department.
Well appears to be in production. Well head surrounded by cement barriers. Three brine tanks located on site. This restoration report has been reviewed and is approved. |
2821022 | Primary Facility | 2019-01-02 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production with the annulus open. The well head casing, piping, production set equipment, containment dike and tank battery look ok. |
For data sources see[8]