If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-31282 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.869203,"lon":-79.565958,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: East Franklin Township | |
Operator Name: SNYDER BROS INC | |
Well Pad ID: 153958 | |
Farm/Lease Name: DYNAMITE | |
License Status: | |
Spud Date: | |
Permit Date: 2017-02-02 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.869203 | |
Longitude: -79.565958 |
Date | Event |
---|---|
2017-02-02 | New Permit Application |
2017-02-13 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-08-09 | 2017-09-12 | 6,423 | 17,314,200 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | SI-1171 | Producers Service Corp | Scale Inhibitor | Hexamethylene Triamine Penta | 34690-00-1 | 3 | 0.000362542 | 586.873 |
Phosphino Carboxylic Acid Polymer | 71050-62-9 | 3 | 0.000362542 | 586.873 | ||||
DETA phosphonate | 15827-60-8 | 3 | 0.000362542 | 586.873 | ||||
Copolymer of Maleic and Acrylic Acid | 52255-49-9 | 10 | 0.00120847 | 1956.24 | ||||
NEFE-180 | Producers Service Corp | Corrosion Inhibitor/Iron Control | 2-Propyn-1-ol | 107-19-7 | 5 | 0.00006226 | 100.791 | |
Coconut oil acid diethanolamine | 68603-42-9 | 5 | 0.00006226 | 100.791 | ||||
Alcohols, C14-15, ethoxylated | 68951-67-7 | 5 | 0.00006226 | 100.791 | ||||
Acetic Acid | 64-19-7 | 65 | 0.00080943 | 1310.28 | ||||
2-Ethylhexanol | 104-76-7 | 10 | 0.000124528 | 201.582 | ||||
Fatty Acids, tall oil | 61790-12-3 | 5 | 0.00006226 | 100.791 | ||||
Methanol | 67-56-1 | 35 | 0.000435847 | 705.536 | ||||
BIO CLEAR 1430 | Producers Service Corp | Biocide | Dimethylamine | 68439-70-3 | 0.5 | 0.00006112 | 98.932 | |
Alkyl dimethyl benzyl ammonium chloride | 68424-85-1 | 5 | 0.000611158 | 989.325 | ||||
Glutaraldehyde | 111-30-8 | 20 | 0.00244463 | 3957.3 | ||||
Water | Company 1 | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 89.2573 | 144,487,000.0 | |
STIMLUBE F | Producers Service Corp | Friction Reducer | Alcohols, ethoxylated | 68002-97-1 | 3.1 | 0.00237511 | 3844.76 | |
Petroleum Distallates | 64742-47-8 | 30 | 0.0229849 | 37207.3 | ||||
Alcohols, ethoxylated | 68439-50-9 | 3.1 | 0.00237511 | 3844.76 | ||||
Alcohols, ethoxylated | 68551-12-2 | 3.1 | 0.00237511 | 3844.76 | ||||
Other Chemical(s) | Listed Above | See Trade Name(s) List | Alcohols, ethoxylated | 68002-97-1 | 3.1 | 0.00237511 | 3844.76 | |
2-Propyn-1-ol | 107-19-7 | 5 | 0.00006226 | 100.791 | ||||
Phosphino Carboxylic Acid Polymer | 71050-62-9 | 3 | 0.000362542 | 586.873 | ||||
Fatty Acids, tall oil | 61790-12-3 | 5 | 0.00006226 | 100.791 | ||||
Methanol | 67-56-1 | 35 | 0.000435847 | 705.536 | ||||
Dimethylamine | 68439-70-3 | 0.5 | 0.00006112 | 98.932 | ||||
DETA phosphonate | 15827-60-8 | 3 | 0.000362542 | 586.873 | ||||
Alcohols, C14-15, ethoxylated | 68951-67-7 | 5 | 0.00006226 | 100.791 | ||||
Alcohols, ethoxylated | 68551-12-2 | 3.1 | 0.00237511 | 3844.76 | ||||
Alkyl dimethyl benzyl ammonium chloride | 68424-85-1 | 5 | 0.000611158 | 989.325 | ||||
Hexamethylene Triamine Penta | 34690-00-1 | 3 | 0.000362542 | 586.873 | ||||
Coconut oil acid diethanolamine | 68603-42-9 | 5 | 0.00006226 | 100.791 | ||||
Alcohols, ethoxylated | 68439-50-9 | 3.1 | 0.00237511 | 3844.76 | ||||
2-Ethylhexanol | 104-76-7 | 10 | 0.000124528 | 201.582 | ||||
Sand (Proppant) | Producers Service Corp | Proppant | Silica Substrate | 14808-60-7 | 100 | 9.96124 | 16,125,000.0 | |
15% HCL | Producers Service Corp | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.1019 | 164952 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | SNYDER BROS INC | 128,559.00 | 14 | 0.00 | 0 | 0.00 | 0 |
2018 | SNYDER BROS INC | 1,684,705.00 | 345 | 0.00 | 0 | 0.00 | 0 |
2019 | SNYDER BROS INC | 1,224,578.00 | 351 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | SNYDER BROS INC | 747.50 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 | |
2017 | SNYDER BROS INC | 1,058.84 Tons | LANDFILL | 100585 | |
2017 | SNYDER BROS INC | Drilling Fluid Waste | 820.99 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2017 | SNYDER BROS INC | Produced Fluid | 8,356.20 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2017 | SNYDER BROS INC | Produced Fluid | 318.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2017 | SNYDER BROS INC | Produced Fluid | 3,802.85 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2017 | SNYDER BROS INC | Synthetic Liner Materials | 2.48 Tons | LANDFILL | 100585 |
2017 | SNYDER BROS INC | Produced Fluid | 46.97 Tons | LANDFILL | 100585 |
2017 | SNYDER BROS INC | Produced Fluid | 1,278.93 Bbl | REUSE (AT WELL PAD) | |
2017 | SNYDER BROS INC | Drill Cuttings | 1,058.84 Tons | LANDFILL | 100585 |
2018 | SNYDER BROS INC | Synthetic Liner Materials | 3.95 Tons | LANDFILL | 100585 |
2018 | SNYDER BROS INC | Produced Fluid | 31,251.10 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2018 | SNYDER BROS INC | Produced Fluid | 1,196.10 Bbl | REUSE (AT WELL PAD) | |
2018 | SNYDER BROS INC | Produced Fluid | 95.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2018 | SNYDER BROS INC | Produced Fluid | 64.60 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2018 | SNYDER BROS INC | Produced Fluid | 293.90 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2018 | SNYDER BROS INC | Produced Fluid | 11.45 Tons | LANDFILL | 100585 |
2018 | SNYDER BROS INC | Filter Socks | 1.37 Tons | LANDFILL | 100585 |
2019 | SNYDER BROS INC | Produced Fluid | 11,267.10 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2019 | SNYDER BROS INC | Produced Fluid | 543.50 Bbl | INJECTION DISPOSAL WELL | 34-099-23171 |
2019 | SNYDER BROS INC | Produced Fluid | 19.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2019 | SNYDER BROS INC | Produced Fluid | 2,343.80 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2562487 | Primary Facility | 2017-02-16 | Drilling/Alteration | No Violations Noted | Drilling permit on site-log book up to date-6'x6' cellar-Rocky Mt Rig drilled and set 84' of new 24" pipe. Hit H2O @ 72'. Site looked good. |
2583432 | Primary Facility | 2017-04-17 | Drilling/Alteration | No Violations Noted | Rig ran and cemented 875' of 13 3/8" with 699 sks-30 bbl return. Rig waiting on cement @ time of inspection. Daily drilling log-all equipment on site looked ok. |
2604741 | Primary Facility | 2017-06-16 | Routine/Complete Inspection | No Violations Noted | Drilling for the Dynamite 2H is anticipated to begin on or about 06/19/17. Drilling was ongoing on the well pad for the Dynamite 3H. Secondary containment onsite and it appeared to be in sound condition. Drill cutting waste containers were onsite on the secondary containment. Drill cuttings are being hauled off-site for disposal. All E&S controls had been properly implemented and maintained. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2605968 | Primary Facility | 2017-06-20 | Drilling/Alteration | No Violations Noted | Operator walking Precision 532 Rig over to this hole and installing the BOP at the time of this inspection. All equipment on site looked ok. |
2608077 | Primary Facility | 2017-06-26 | Drilling/Alteration | No Violations Noted | Precision Rig # 532 just walked over to this well and was getting ready to commence drilling to TD. Daily drilling info and all equipment on site looked ok. |
2619506 | Primary Facility | 2017-07-27 | Routine/Complete Inspection | No Violations Noted | Drilling had been completed, work was ongoing to prep the site for well stimulation activities. Well pad secondary containment had been inspected and patched as necessary after removal of the drilling equipment. All site and access road erosion controls appeared to be functioning properly and there was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2626436 | Primary Facility | 2017-08-14 | Drilling/Alteration | No Violations Noted | Frac crew set 2 retrievable plugs and performed a negative/positive test after installing each plug. A hanger with BPV was also installed in well to provide a third barrier of protection while RD existing problematic valves and waiting on replacements at the time of this inspection. |
2626491 | Primary Facility | 2017-08-15 | Drilling/Alteration | No Violations Noted | Crew tearing down frac stack valves and waiting on new valves from another company at the time of this inspection. Well head looked ok. |
2628188 | Primary Facility | 2017-08-21 | Drilling/Alteration | No Violations Noted | Frac crew just set new Weatherford frac stack valves-pressure tested and rigging back up to continue frac. All equipment on site looked ok. |
2630633 | Primary Facility | 2017-08-28 | Drilling/Alteration | No Violations Noted | The wireline unit was perfing stage 25 out of the planned 55 stages at the time of this inspection. The equipment looked ok. |
2641949 | Primary Facility | 2017-09-29 | Routine/Complete Inspection | No Violations Noted | Well stimulation equipment is slated to be brought onsite and well stimulation activities resume for the Dynamite 1H beginning Monday October 2, 2017. All site and access erosion controls had been implemented and maintained as outlined in the E&S Plan contained within the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2648468 | Primary Facility | 2017-10-17 | Routine/Complete Inspection | No Violations Noted | All erosion controls for the site and access road had been implemented and maintained as outlined in the E&S plan. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Secondary containment was located onsite, set in place and maintained as outlined in the Containment plan. Well stimulation activities had been completed. Work was underway to prepare the site and set-up the equipment necessary for drilling out the frac plugs. |
2665261 | Primary Facility | 2017-11-29 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well is drilled and has been stimulated. The remaining three wells on the pad are also drilled and have been stimulated. On-site contractors appear to be preparing and maintaining equipment for the production of the wells. |
2680913 | Primary Facility | 2018-01-10 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well 2H is drilled and appears equipped for production. Wells 1H, 3H, and 4H are also drilled and appear equipped for production. |
2709847 | Primary Facility | 2018-03-26 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, tank battery and containment dike look ok. |
2724362 | Primary Facility | 2018-04-18 | Routine/Partial Inspection | No Violations Noted | At time of inspection, well 2H is drilled and appears equipped for production. Wells 1H, 3H, and 4H are also drilled and appear equipped for production. |
2743234 | Primary Facility | 2018-06-13 | Routine/Partial Inspection | No Violations Noted | At time of inspection, well 2H is drilled and appears equipped for production. Wells 1H, 3H, and 4H are also drilled and appear equipped for production. |
2766737 | Primary Facility | 2018-08-23 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, tank battery and containment dike look ok. |
2818440 | Primary Facility | 2018-12-17 | Site Restoration | No Violations Noted | Inspection conducted in response to Post Drilling Restoration Report received by Department.
Well appears to be in production. Well head surrounded by cement barriers. Three brine tanks located on site. This restoration report has been reviewed and is approved. |
2821026 | Primary Facility | 2019-01-02 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production with the annulus open. The well head casing, piping, production set equipment, containment dike and tank battery look ok. |
For data sources see[8]