If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-31296 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.831072,"lon":-79.672317,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: West Franklin Township | |
Operator Name: PENNENERGY RESOURCES LLC | |
Well Pad ID: 152144 | |
Farm/Lease Name: PAD W09 | |
License Status: Active | |
Spud Date: 2017-07-06 | |
Permit Date: 2017-06-14 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.831072 | |
Longitude: -79.672317 |
Date | Event |
---|---|
2017-06-14 | New Permit Application |
2017-07-06 | Performed Spud Operation |
2018-01-21 | Drilling Completion |
2018-04-06 | Perforation |
2018-04-06 | Performed Stage 1 of Stimulation |
2018-04-06 | Performed Stage 2 of Stimulation |
2018-04-06 | Performed Stage 3 of Stimulation |
2018-04-07 | Perforation |
2018-04-07 | Performed Stage 4 of Stimulation |
2018-04-09 | Perforation |
2018-04-09 | Performed Stage 5 of Stimulation |
2018-04-09 | Performed Stage 6 of Stimulation |
2018-04-09 | Performed Stage 7 of Stimulation |
2018-04-10 | Perforation |
2018-04-10 | Performed Stage 10 of Stimulation |
2018-04-10 | Performed Stage 11 of Stimulation |
2018-04-10 | Performed Stage 12 of Stimulation |
2018-04-10 | Performed Stage 8 of Stimulation |
2018-04-10 | Performed Stage 9 of Stimulation |
2018-04-11 | Perforation |
2018-04-11 | Performed Stage 13 of Stimulation |
2018-04-11 | Performed Stage 14 of Stimulation |
2018-04-11 | Performed Stage 15 of Stimulation |
2018-04-12 | Perforation |
2018-04-12 | Performed Stage 16 of Stimulation |
2018-04-12 | Performed Stage 17 of Stimulation |
2018-04-12 | Performed Stage 18 of Stimulation |
2018-04-12 | Performed Stage 19 of Stimulation |
2018-04-13 | Perforation |
2018-04-13 | Performed Stage 20 of Stimulation |
2018-04-13 | Performed Stage 21 of Stimulation |
2018-04-13 | Performed Stage 22 of Stimulation |
2018-04-14 | Perforation |
2018-04-14 | Performed Stage 23 of Stimulation |
2018-04-14 | Performed Stage 24 of Stimulation |
2018-04-16 | Perforation |
2018-04-16 | Performed Stage 25 of Stimulation |
2018-04-17 | Perforation |
2018-04-17 | Performed Stage 26 of Stimulation |
2018-04-17 | Performed Stage 27 of Stimulation |
2018-04-17 | Performed Stage 28 of Stimulation |
2018-04-17 | Performed Stage 29 of Stimulation |
2018-04-18 | Perforation |
2018-04-18 | Performed Stage 30 of Stimulation |
2018-04-18 | Performed Stage 31 of Stimulation |
2018-04-18 | Performed Stage 32 of Stimulation |
2018-04-18 | Performed Stage 33 of Stimulation |
2018-04-19 | Perforation |
2018-04-19 | Performed Stage 34 of Stimulation |
2018-04-19 | Performed Stage 35 of Stimulation |
2018-04-19 | Performed Stage 36 of Stimulation |
2018-04-19 | Performed Stage 37 of Stimulation |
2018-04-19 | Performed Stage 38 of Stimulation |
2019-06-12 | Deviated |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-04-06 | 2018-04-19 | 6,249 | 19,710,400 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | TRS 3001 | Tight Rock Solutions | Scale Control | Ethylene Glycol | 107-21-1 | 5 | 0.000931931 | 1738.19 |
Amine Triphosphate | Not Assigned | 30 | 0.00559158 | 10429.2 | ||||
Sodium Phosphate, Tribasic | 7601-54-9 | 5 | 0.000931931 | 1738.19 | ||||
TRS 11800 | Tight Rock Solutions | Friction Reducer | Hydrotreated Light Distillate | 64742-47-8 | 30 | 0.0176625 | 32943.2 | |
Inorganic Salt | Not Assigned | 10 | 0.00588749 | 10981.1 | ||||
Oxyalkylated alcohol | Not Assigned | 5 | 0.00294375 | 5490.53 | ||||
Alkyl Alcohol | Not Assigned | 10 | 0.00588749 | 10981.1 | ||||
Unihib G | Geosafe | Corrosion Inhibitor | Thiourea | 0000062-56-6 | 1 | 0.00000911 | 16.996 | |
Butyl digycol | 0000112-34-5 | 75 | 0.00068344 | 1274.72 | ||||
Alcohols C10-16, ethoxylated | 0068002-97-1 | 50 | 0.000455627 | 849.813 | ||||
Formaldehyde | 0000050-00-0 | 1 | 0.00000911 | 16.996 | ||||
Methanol | 0000067-56-1 | 5 | 0.00004556 | 84.981 | ||||
AP Breaker | Lubrizol | Breaker | Ammonium persulfate | 7727-54-0 | 100 | 0.000353858 | 660 | |
TRS 805X | Tight Rock Solutions | Friction Reducer | Aliphatic Hydrocarbon | Not Assigned | 30 | 0.0151626 | 28280.6 | |
Alcohol Alkoxylates | Not Assigned | 5 | 0.0025271 | 4713.43 | ||||
Water | PennEnergy Resources | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 88.1877 | 164,484,000.0 | |
Hydrochloric Acid (7.5%) | PVS | Acidizing | Water | 7732-18-5 | 92.5 | 1.88654 | 3,518,680.0 | |
Hydrochloric Acid | 7647-01-0 | 7.5 | 0.152962 | 285298 | ||||
Other Chemical(s) | Listed Above | See Trade Name(s) List | Formaldehyde | 0000050-00-0 | 1 | 0.00000911 | 16.996 | |
Alcohols C10-16, ethoxylated | 0068002-97-1 | 50 | 0.000455627 | 849.813 | ||||
Sodium Phosphate, Tribasic | 7601-54-9 | 5 | 0.000931931 | 1738.19 | ||||
Inorganic Salt | Not Assigned | 10 | 0.00588749 | 10981.1 | ||||
Oxyalkylated alcohol | Not Assigned | 5 | 0.00294375 | 5490.53 | ||||
Thiourea | 0000062-56-6 | 1 | 0.00000911 | 16.996 | ||||
Ethylene Glycol | 107-21-1 | 5 | 0.000931931 | 1738.19 | ||||
Water | 7732-18-5 | 92.5 | 1.88654 | 3,518,680.0 | ||||
Alcohol Alkoxylates | Not Assigned | 5 | 0.0025271 | 4713.43 | ||||
Alkyl Alcohol | Not Assigned | 10 | 0.00588749 | 10981.1 | ||||
Methanol | 0000067-56-1 | 5 | 0.00004556 | 84.981 | ||||
BIOC12031A | Nalco | Biocide | Glutaraldehyde | 111-30-8 | 30 | 0.005497 | 10252.7 | |
Sand (Proppant) | Sargent/Momentive/Prefferred | Proppant | Silica Substrate | 14808-60-7 | 100 | 9.62511 | 17,952,300.0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2018-04-06 | 1 | Sand | 17,039,698 | 8,203 | 6,127 |
2018-04-06 | 2 | Sand | 17,039,698 | 7,883 | 5,938 |
2018-04-06 | 3 | Sand | 17,039,698 | 8,613 | 6,427 |
2018-04-07 | 4 | Sand | 17,039,698 | 8,453 | 7,382 |
2018-04-09 | 5 | Sand | 17,039,698 | 8,231 | 6,903 |
2018-04-09 | 6 | Sand | 17,039,698 | 8,346 | 7,375 |
2018-04-09 | 7 | Sand | 17,039,698 | 8,241 | 6,942 |
2018-04-10 | 8 | Sand | 17,039,698 | 8,335 | 6,998 |
2018-04-10 | 9 | Sand | 17,039,698 | 7,837 | 6,648 |
2018-04-10 | 10 | Sand | 17,039,698 | 7,919 | 6,909 |
2018-04-10 | 11 | Sand | 17,039,698 | 7,665 | 6,824 |
2018-04-10 | 12 | Sand | 17,039,698 | 7,905 | 7,950 |
2018-04-11 | 13 | Sand | 17,039,698 | 7,851 | 7,386 |
2018-04-11 | 14 | Sand | 17,039,698 | 8,188 | 7,768 |
2018-04-11 | 15 | Sand | 17,039,698 | 7,949 | 7,251 |
2018-04-12 | 16 | Sand | 17,039,698 | 8,751 | 7,642 |
2018-04-12 | 17 | Sand | 17,039,698 | 7,934 | 6,863 |
2018-04-12 | 18 | Sand | 17,039,698 | 7,801 | 6,379 |
2018-04-12 | 19 | Sand | 17,039,698 | 7,845 | 7,753 |
2018-04-13 | 20 | Sand | 17,039,698 | 7,502 | 7,107 |
2018-04-13 | 21 | Sand | 17,039,698 | 7,605 | 6,219 |
2018-04-13 | 22 | Sand | 17,039,698 | 8,725 | 6,524 |
2018-04-14 | 23 | Sand | 17,039,698 | 7,678 | 7,396 |
2018-04-14 | 24 | Sand | 17,039,698 | 7,740 | 7,112 |
2018-04-16 | 25 | Sand | 17,039,698 | 8,690 | 7,521 |
2018-04-17 | 26 | Sand | 17,039,698 | 7,457 | 5,567 |
2018-04-17 | 27 | Sand | 17,039,698 | 7,375 | 8,128 |
2018-04-17 | 28 | Sand | 17,039,698 | 7,231 | 6,288 |
2018-04-17 | 29 | Sand | 17,039,698 | 8,455 | 8,199 |
2018-04-18 | 30 | Sand | 17,039,698 | 7,435 | 5,921 |
2018-04-18 | 31 | Sand | 17,039,698 | 74,522 | 7,419 |
2018-04-18 | 32 | Sand | 17,039,698 | 7,471 | 6,491 |
2018-04-18 | 33 | Sand | 17,039,698 | 7,933 | 7,913 |
2018-04-19 | 34 | Sand | 17,039,698 | 6,511 | 6,351 |
2018-04-19 | 35 | Sand | 17,039,698 | 5,558 | 5,685 |
2018-04-19 | 36 | Sand | 17,039,698 | 5,594 | 6,507 |
2018-04-19 | 37 | Sand | 17,039,698 | 6,184 | 6,154 |
2018-04-19 | 38 | Sand | 17,039,698 | 6,107 | 5,532 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | PENNENERGY RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | PENNENERGY RESOURCES LLC | 799,239.00 | 178 | 0.00 | 0 | 0.00 | 0 |
2019 | PENNENERGY RESOURCES LLC | 1,015,544.00 | 364 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | PENNENERGY RESOURCES LLC | Produced Fluid | 806.72 Bbl | REUSE (AT WELL PAD) | |
2017 | PENNENERGY RESOURCES LLC | Drill Cuttings | 377.42 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 18.33 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2018 | PENNENERGY RESOURCES LLC | Drill Cuttings | 945.65 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
2018 | PENNENERGY RESOURCES LLC | Synthetic Liner Materials | 4.28 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
2018 | PENNENERGY RESOURCES LLC | Filter Socks | 0.49 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2018 | PENNENERGY RESOURCES LLC | Waste Water Treatment Sludge | 6.73 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 11,366.09 Bbl | REUSE (AT WELL PAD) | |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 11.20 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2018 | PENNENERGY RESOURCES LLC | Drilling Fluid Waste | 548.33 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 721.00 Bbl | INJECTION DISPOSAL WELL | 34-155-22403 |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 1,246.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21893 |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 38.33 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2018 | PENNENERGY RESOURCES LLC | Drilling Fluid Waste | 1,275.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 33.21 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 152.46 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 30.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2018 | PENNENERGY RESOURCES LLC | Other Oil & Gas Wastes | 36.67 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2018 | PENNENERGY RESOURCES LLC | Drilling Fluid Waste | 114.08 Bbl | REUSE (AT WELL PAD) | |
2018 | PENNENERGY RESOURCES LLC | Servicing Fluid | 20.31 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 602.65 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 451.42 Bbl | INJECTION DISPOSAL WELL | 34-155-21893 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 70.81 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 761.22 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 12,804.59 Bbl | REUSE (AT WELL PAD) | |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 666.34 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 1,149.55 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 249.24 Bbl | INJECTION DISPOSAL WELL | 34-155-22403 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2612495 | Primary Facility | 2017-07-06 | Drilling/Alteration | No Violations Noted | Well sign present-spudded 7/6/2017 with 40' of 16" casing in a 8' round-8' deep cellar. |
2619282 | Primary Facility | 2017-07-26 | Routine/Complete Inspection | No Violations Noted | Drilling had commenced but was not ongoing at the time of the inspection. Well development impoundment construction was in its final stages with final grading and mulching for temporary stabilization being completed. There was no observed accelerated erosion or sedimentation in relation to the site or access road. All erosion controls had been implemented and maintained as outlined in the E&S plan contained within the ESCGP. |
2637294 | Primary Facility | 2017-09-18 | Drilling/Alteration | No Violations Noted | The Rig was waiting on cement at the time of this inspection. The drilling log and all equipment on site looked ok. |
2637386 | Primary Facility | 2017-09-15 | Routine/Complete Inspection | No Violations Noted | Drilling was ongoing at the time of the inspection. Secondary containment, and tertiary containment for number areas on the well pad was implemented as outlined. Well development impoundment construction had been completed and the impoundment was not lined and not in use. All access road and site erosion controls had been implemented as outlined in the E&S plan contained within the ESCGP. All erosion controls appeared to be maintained and functioning properly. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2661686 | Primary Facility | 2017-11-16 | Routine/Complete Inspection | No Violations Noted | At time of inspection, 3H actively being drilled. 1H, 2H, 4H, 5H, 6H all spudded, not yet completed.
Operator representatives John Rice and Bobby Harrage on-site. |
2670287 | Primary Facility | 2017-12-06 | Routine/Complete Inspection | No Violations Noted | At time of inspection, drilling rig on 2H. 1H, 3H, 4H, 5H, 6H have all been spudded.
Operator representative Bobby Harrage on-site. |
2678880 | Primary Facility | 2017-12-27 | Routine/Complete Inspection | No Violations Noted | At time of inspection, drilling rig on 4H. Wells 1H, 2H, and 3H have been completed. Wells 5H and 6H have been spudded, not yet completed.
Operator representatives Heath Cunningham and Todd White on-site. |
2685684 | Primary Facility | 2018-01-24 | Drilling/Alteration | No Violations Noted | The operator just finished cementing the 5 1/2" production casing from 15,508' to surface with 35 bbls of cement returned. Patterson was in the process of rigging down and moving off site at the time of this inspection. The site documentation and all equipment looked ok at the time of this inspection. |
2691336 | Primary Facility | 2018-01-25 | Routine/Partial Inspection | No Violations Noted | At time of inspection, well 6H drilled to total depth. Wells 1H, 2H, 3H, 4H, and 5H also drilled to total depth. These wells have not yet been frac'd.
The rig is in the process of exiting the site. Because of the large volume of vehicle traffic, the Department did not inspect the whole site due to safety concerns. Operator representative James on-site. |
2695912 | Primary Facility | 2018-02-15 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well 6H drilled to total depth. Wells 1H, 2H, 3H, 4H, and 5H also drilled to total depth. These wells have not yet been frac'd.
No rig on-site during this inspection. |
2709361 | Primary Facility | 2018-03-15 | Routine/Complete Inspection | No Violations Noted | At time of inspection, well 6H drilled, not yet frac'd. Frac'g not yet completed for wells 1H, 2H, 4H, and 5H. Frac'g operations ongoing for well 4H during this inspection. Well 3H frac'd. |
2718336 | Primary Facility | 2018-04-16 | Drilling/Alteration | No Violations Noted | Operator was fracking stage 25 of the planned 41 stages at the time of this inspection. All paperwork and equipment on site looked ok. |
2727580 | Primary Facility | 2018-05-08 | Routine/Complete Inspection | No Violations Noted | At time of inspection, frac'g of wells 1H, 2H, 3H, 4H, 5H, and 6H have been completed. Equipment being removed from site. Operator intends to begin drilling out plugs on Monday 5/14/18.
Operator representative Frank Kocher on-site. |
2747774 | Primary Facility | 2018-07-02 | Drilling/Alteration | No Violations Noted | On this date this well has been drilled, fracked and is awaiting flow back. The operator is moving equipment in to this well pad today to begin flowing back all 6 wells on this pad. The well is shut in, is tagged, the well head casing and all equipment on site looked ok. |
2792888 | Primary Facility | 2018-10-23 | Routine/Complete Inspection | No Violations Noted | Well appears equipped for production. Well head surrounded by cement barriers. Small generator on site located on secondary containment. Three brine tanks on site. |
2821551 | Primary Facility | 2019-01-03 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The well head casing, piping, production set equipment, containment dike and tank battery look ok. |
For data sources see[9]