If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-31302 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.913975,"lon":-79.373294,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Boggs Township | |
Operator Name: SNYDER BROS INC | |
Well Pad ID: 154069 | |
Farm/Lease Name: KUHNS | |
License Status: | |
Spud Date: | |
Permit Date: 2017-10-11 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.913975 | |
Longitude: -79.373294 |
Date | Event |
---|---|
2017-10-11 | New Permit Application |
2018-03-15 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-09-04 | 2018-09-18 | 6,689 | 10,447,600 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Hydrochloric Acid (15%) | PVS | Acidizing | Water | 7732-18-5 | 85 | 0.447523 | 441502 |
Hydrochloric Acid | 7647-01-0 | 15 | 0.0789746 | 77912.1 | ||||
Water | Snyder Brothers | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 88.3741 | 87,185,100.0 | |
Unihib G | GeoSafe | Acid Inhibitor | Thiourea | 62-56-6 | 1 | 0.00000452 | 4.457 | |
Ethoxylated alcohol | 68002-97-1 | 35 | 0.000158139 | 156.011 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00000452 | 4.457 | ||||
Short Chained Glycol Ether | 112-34-5 | 60 | 0.000271095 | 267.448 | ||||
Acetophenone | 98-86-2 | 1 | 0.00000452 | 4.457 | ||||
Methanol | 67-56-1 | 5 | 0.00002259 | 22.287 | ||||
Other Chemical(s) | Listed Above | See Trade Name(s) List | Alcohols, C12-15 Branched/Linear, Ethoxylated Propoxylated | 120313-48-6 | 5 | 0.00232757 | 2296.25 | |
Poly(oxy-1,2-ethanediyl), a-(4-nonylphenyl)-w-hydroxy-branche d |
127087-87-0 | 3 | 0.00139654 | 1377.75 | ||||
Methanol | 67-56-1 | 5 | 0.00002259 | 22.287 | ||||
Thiourea | 62-56-6 | 1 | 0.00000452 | 4.457 | ||||
Ethanol | 64-17-5 | 0.3 | 0.00006813 | 67.214 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00000452 | 4.457 | ||||
Water | 7732-18-5 | 83 | 0.0188494 | 18595.8 | ||||
Water | 7732-18-5 | 85 | 0.447523 | 441502 | ||||
Ethoxylated alcohol | 68002-97-1 | 35 | 0.000158139 | 156.011 | ||||
Acetophenone | 98-86-2 | 1 | 0.00000452 | 4.457 | ||||
Quaternary ammonium compounds, benzylC12-16-alkyldimethyl, chlorides |
68424-85-1 | 2.5 | 0.000567753 | 560.114 | ||||
Sand | US Silica/RW Elliot/Unimin | Proppant | Silica Substrate | 14808-60-7 | 100 | 10.998 | 10,850,000.0 | |
FR-1 | SNF Inc | Friction Reducer | Alcohols, C12-15 Branched/Linear, Ethoxylated Propoxylated | 120313-48-6 | 5 | 0.00232757 | 2296.25 | |
Poly(oxy-1,2-ethanediyl), a-(4-nonylphenyl)-w-hydroxy-branche d |
127087-87-0 | 3 | 0.00139654 | 1377.75 | ||||
Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.0139654 | 13777.5 | ||||
Aqucar 714 | The Dow Chemical Company | Microbiocide | Ethanol | 64-17-5 | 0.3 | 0.00006813 | 67.214 | |
Quaternary ammonium compounds, benzylC12-16-alkyldimethyl, chlorides |
68424-85-1 | 2.5 | 0.000567753 | 560.114 | ||||
Glutaraldehyde | 111-30-8 | 14 | 0.00317942 | 3136.64 | ||||
Water | 7732-18-5 | 83 | 0.0188494 | 18595.8 | ||||
Scale Hib PE-18 | Universal Pressure Pumping, Inc | Scale Inhibitor | Proprietary Scale Inhibitor | PROPRIETARY | 30 | 0.00294149 | 2901.92 | |
Unislick E | Flotek Chemistry, LLC | Friction Reducer | Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.00658264 | 6494.08 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2018 | SNYDER BROS INC | 188,149.00 | 42 | 0.00 | 0 | 0.00 | 0 |
2019 | SNYDER BROS INC | 875,110.00 | 336 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | SNYDER BROS INC | Synthetic Liner Materials | 5.30 Tons | LANDFILL | 100585 |
2018 | SNYDER BROS INC | Drill Cuttings | 867.23 Tons | LANDFILL | 100585 |
2018 | SNYDER BROS INC | Produced Fluid | 8,532.70 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2018 | SNYDER BROS INC | Produced Fluid | 332.40 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2018 | SNYDER BROS INC | Produced Fluid | 51.01 Tons | LANDFILL | 100594 |
2018 | SNYDER BROS INC | Produced Fluid | 4.76 Tons | LANDFILL | 100585 |
2019 | SNYDER BROS INC | Produced Fluid | 11,744.30 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2019 | SNYDER BROS INC | Produced Fluid | 471.80 Bbl | INJECTION DISPOSAL WELL | 34-099-23171 |
2019 | SNYDER BROS INC | Filter Socks | 2.20 Tons | LANDFILL | 100585 |
2019 | SNYDER BROS INC | Synthetic Liner Materials | 3.74 Tons | LANDFILL | 100585 |
2019 | SNYDER BROS INC | Produced Fluid | 2,833.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2707347 | Primary Facility | 2018-03-20 | Drilling/Alteration | No Violations Noted | This well has a 6' cellar. The well was spudded to 40' with a 36" bit. The operator ran 40' of 30" conductor pipe and cemented it in using 5.5 yards of class A cement. There was no water encountered in the cellar. The cellar is covered over with a piece of steel plate for safety until the top hole drilling rig arrives to drill. All required paperwork is on site and the equipment on site looks ok. |
2707392 | Primary Facility | 2018-03-20 | Routine/Partial Inspection | No Violations Noted | Inspection conducted in response to spud notifications for wells 3H, 4H, and 5H.
At time of inspection, well 3H drilled to 40 feet and covered with steel plate. Wells 4H and 5H drilled to 40 feet and covered with steel plates. Wells 1H and 2H drilled and frac'd. Department unable to adequately inspect the entire location due to ongoing high pressure testing occurring on part of the well pad. |
2724449 | Primary Facility | 2018-04-18 | Routine/Partial Inspection | No Violations Noted | At time of inspection, well 3H spudded, not yet completed, covered with steel plate. Wells 4H and 5H spudded, not yet completed, covered with steel plates. Wells 1H and 2H drilled and frac'd. |
2732749 | Primary Facility | 2018-05-22 | Drilling/Alteration | No Violations Noted | This well has a 6' cellar. The well was spudded to 40' with a 36" bit. The operator ran 40' of 30" conductor pipe and cemented it in using 5.5 yards of class A cement. There was no water encountered in the cellar. The rig ran 152' of 20", cemented with 337 sks of cement and saw a 7 bbl return on cement. Drilled to 890', ran 888' of 13 3/8" pipe, cemented it with 691 sks of cement and saw a 31 bbl return on cement. The Rig had drilled to 2006', ran 1986' of 9 5/8" casing and was getting ready to cement at the time of this inspection. The drilling log information and all equipment on site looked ok. |
2743290 | Primary Facility | 2018-06-13 | Routine/Partial Inspection | No Violations Noted | At time of inspection, drilling rig currently on-site. Wells 3H, 4H, and 5H previously spudded, not yet frac'd. Wells 1H and 2H drilled and frac'd. |
2748144 | Primary Facility | 2018-07-03 | Drilling/Alteration | No Violations Noted | On this date the Patterson rig has been set up, the BOP has just been tested and the crew was getting ready to start drilling. All equipment on site looked ok. |
2818053 | Primary Facility | 2018-12-17 | Routine/Complete Inspection | No Violations Noted | At time of inspection well appears to be in production. Well head surrounded by cement barriers. Three brine tanks on site.
No activity taking place on site at this time. |
2823170 | Primary Facility | 2019-01-08 | Routine/Complete Inspection | No Violations Noted | This well is tagged, in production and temporarily shut in for a sales line upgrade which is taking place at the time of this inspection in order to provide additional pipeline capacity for the 5 wells on this unconventional well pad. The well head casing, piping, production set equipment, containment dike and tank battery look ok. |
2828387 | Primary Facility | 2019-01-17 | Routine/Complete Inspection | No Violations Noted | On 1/17/19 at 0903 hrs., I conducted a routine inspection of Snyder Brothers, Inc.'s Kuhns well pad and associated wells in Boggs Twp., Armstrong Co. Five wells have been drilled and are equipped for production, including well 3H (API 005-31302). Well tags are present at the well heads. There are no violations noted for this inspection. |
2853263 | Primary Facility | 2019-03-05 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, well was producing. Well integrity was in good condition, with no signs of any leaks or spills onsite. The well did not have any corrosion. The cellar was below ground level, with water inside. No bubbles were seen. The digital gauges on the well showed the tubing pressure to be 1707 psi and the casing pressure was 2015 psi. The well was properly labeled and the Emergency Response sign was posted at the site entrance. There were 3 dual line heaters and 5 separators onsite. The 1H & 2H wells had smaller separators than the rest of the wells. There were also 3 tall tanks and a smaller horizontal tank contained within a lined, steel dike. |
For data sources see[8]