If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-31304 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.913972,"lon":-79.37315,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: Boggs Township | |
Operator Name: SNYDER BROS INC | |
Well Pad ID: 154069 | |
Farm/Lease Name: KUHNS | |
License Status: | |
Spud Date: | |
Permit Date: 2017-10-11 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.913972 | |
Longitude: -79.373150 |
Date | Event |
---|---|
2017-10-11 | New Permit Application |
2018-03-15 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-09-04 | 2018-09-21 | 6,728 | 12,904,500 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand | US Silica/RW Elliot/Unimin | Proppant | Silica Substrate | 14808-60-7 | 100 | 10.599 | 12,865,100.0 |
Other Chemical(s) | Listed Above | See Trade Name(s) List | Alcohols, C12-15 Branched/Linear, Ethoxylated Propoxylated | 120313-48-6 | 5 | 0.00264314 | 3208.24 | |
Quaternary ammonium compounds, benzylC12-16-alkyldimethyl, chlorides |
68424-85-1 | 2.5 | 0.000224679 | 272.716 | ||||
Water | 7732-18-5 | 85 | 0.506656 | 614979 | ||||
Poly(oxy-1,2-ethanediyl), a-(4-nonylphenyl)-w-hydroxy-branche d |
127087-87-0 | 3 | 0.00158588 | 1924.94 | ||||
Thiourea | 62-56-6 | 1 | 0.00000512 | 6.215 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00000512 | 6.215 | ||||
Water | 7732-18-5 | 83 | 0.00745936 | 9054.16 | ||||
Acetophenone | 98-86-2 | 1 | 0.00000512 | 6.215 | ||||
Methanol | 67-56-1 | 5 | 0.00002560 | 31.076 | ||||
Ethanol | 64-17-5 | 0.3 | 0.00002696 | 32.726 | ||||
Ethoxylated alcohol | 68002-97-1 | 35 | 0.000179216 | 217.532 | ||||
Aqucar 714 | The Dow Chemical Company | Microbiocide | Water | 7732-18-5 | 83 | 0.00745936 | 9054.16 | |
Quaternary ammonium compounds, benzylC12-16-alkyldimethyl, chlorides |
68424-85-1 | 2.5 | 0.000224679 | 272.716 | ||||
Ethanol | 64-17-5 | 0.3 | 0.00002696 | 32.726 | ||||
Glutaraldehyde | 111-30-8 | 14 | 0.0012582 | 1527.21 | ||||
Unislick E | Flotek Chemistry, LLC | Friction Reducer | Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.00395181 | 4796.71 | |
Unihib G | GeoSafe | Acid Inhibitor | Acetophenone | 98-86-2 | 1 | 0.00000512 | 6.215 | |
Formaldehyde | 50-00-0 | 1 | 0.00000512 | 6.215 | ||||
Ethoxylated alcohol | 68002-97-1 | 35 | 0.000179216 | 217.532 | ||||
Methanol | 67-56-1 | 5 | 0.00002560 | 31.076 | ||||
Thiourea | 62-56-6 | 1 | 0.00000512 | 6.215 | ||||
Short Chained Glycol Ether | 112-34-5 | 60 | 0.000307228 | 372.913 | ||||
FR-1 | SNF Inc | Friction Reducer | Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.0158588 | 19249.4 | |
Poly(oxy-1,2-ethanediyl), a-(4-nonylphenyl)-w-hydroxy-branche d |
127087-87-0 | 3 | 0.00158588 | 1924.94 | ||||
Alcohols, C12-15 Branched/Linear, Ethoxylated Propoxylated | 120313-48-6 | 5 | 0.00264314 | 3208.24 | ||||
Water | Snyder Brothers | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 88.7198 | 107,688,000.0 | |
Scale Hib PE-18 | Universal Pressure Pumping, Inc | Scale Inhibitor | Proprietary Scale Inhibitor | PROPRIETARY | 30 | 0.00286027 | 3471.79 | |
Hydrochloric Acid (15%) | PVS | Acidizing | Water | 7732-18-5 | 85 | 0.506656 | 614979 | |
Hydrochloric Acid | 7647-01-0 | 15 | 0.0894099 | 108526 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2018 | SNYDER BROS INC | 43,384.00 | 7 | 0.00 | 0 | 0.00 | 0 |
2019 | SNYDER BROS INC | 1,396,207.00 | 330 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | SNYDER BROS INC | Synthetic Liner Materials | 5.32 Tons | LANDFILL | 100585 |
2018 | SNYDER BROS INC | Drill Cuttings | 1,351.90 Tons | LANDFILL | 100585 |
2018 | SNYDER BROS INC | Produced Fluid | 10,279.50 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2018 | SNYDER BROS INC | Produced Fluid | 400.50 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2018 | SNYDER BROS INC | Produced Fluid | 61.47 Tons | LANDFILL | 100594 |
2018 | SNYDER BROS INC | Produced Fluid | 5.73 Tons | LANDFILL | 100585 |
2019 | SNYDER BROS INC | Produced Fluid | 14,148.50 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2019 | SNYDER BROS INC | Produced Fluid | 568.50 Bbl | INJECTION DISPOSAL WELL | 34-099-23171 |
2019 | SNYDER BROS INC | Filter Socks | 2.10 Tons | LANDFILL | 100585 |
2019 | SNYDER BROS INC | Synthetic Liner Materials | 3.73 Tons | LANDFILL | 100585 |
2019 | SNYDER BROS INC | Produced Fluid | 3,412.90 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2707353 | Primary Facility | 2018-03-20 | Drilling/Alteration | No Violations Noted | This well has a 6' cellar. The well was spudded to 40' with a 36" bit. The operator ran 40' of 30" conductor pipe and cemented it in using 5.5 yards of class A cement. There was no water encountered in the cellar. The cellar is covered over with a piece of steel plate for safety until the top hole drilling rig arrives to drill. All required paperwork is on site and the equipment on site looks ok. |
2707394 | Primary Facility | 2018-03-20 | Routine/Partial Inspection | No Violations Noted | Inspection conducted in response to spud notifications for wells 3H, 4H, and 5H.
At time of inspection, well 5H drilled to 40 feet and covered with steel plate. Wells 3H and 4H drilled to 40 feet and covered with steel plates. Wells 1H and 2H drilled and frac'd. Department unable to adequately inspect the entire location due to ongoing high pressure testing occurring on part of the well pad. |
2724442 | Primary Facility | 2018-04-18 | Routine/Partial Inspection | No Violations Noted | At time of inspection, well 5H spudded, not yet completed, covered with steel plate. Wells 3H and 4H spudded, not yet completed, covered with steel plates. Wells 1H and 2H drilled and frac'd. |
2736985 | Primary Facility | 2018-06-04 | Drilling/Alteration | No Violations Noted | This well has a 6' cellar. The well was spudded to 40' with a 36" bit. The operator ran 40' of 30" conductor pipe and cemented it in using 5.5 yards of class A cement. There was no water encountered in the cellar. The rig was just starting to drill the 20" hole section at the time of this inspection. All required paperwork is on site and the equipment on site looks ok. |
2738710 | Primary Facility | 2018-06-07 | Drilling/Alteration | No Violations Noted | This well has a 6' cellar. The well was spudded to 40' with a 36" bit. The operator ran 40' of 30" conductor pipe and cemented it in using 5.5 yards of class A cement. There was no water encountered in the cellar. The rig Drilled to 895', set 875' of 13 3/8" pipe and cemented with 687 sks of cement and saw a 30 bbl return on cement. At the time of this inspection the rig was nippling up to drill the intermediate 12 3/8' section of the hole. All required paperwork is on site and the equipment on site looks ok. |
2739609 | Primary Facility | 2018-06-11 | Drilling/Alteration | No Violations Noted | This well has a 6' cellar. The well was spudded to 40' with a 36" bit. The operator ran 40' of 30" conductor pipe and cemented it in using 5.5 yards of class A cement. There was no water encountered in the cellar. The rig Drilled to 895', set 875' of 13 3/8" pipe and cemented with 687 sks of cement and saw a 30 bbl return on cement. The rig drilled and set 1972' of 9 5/8" casing and cemented with 591 sks cement and saw a 28 bbl return.
At the time of this inspection the rig was drilling at 3837'. All required paperwork is on site and the equipment on site looks ok. |
2742397 | Primary Facility | 2018-06-18 | Drilling/Alteration | No Violations Noted | This well has a 6' cellar. The well was spudded to 40' with a 36" bit. The operator ran 40' of 30" conductor pipe and cemented it in using 5.5 yards of class A cement. There was no water encountered in the cellar. The rig Drilled to 895', set 875' of 13 3/8" pipe and cemented with 687 sks of cement and saw a 30 bbl return on cement. The rig drilled and set 1972' of 9 5/8" casing and cemented with 591 sks cement and saw a 28 bbl return.
At the time of this inspection the rig was stacked at the edge of the location and the top hole portion of the well was drilled and waiting on the big rig. All equipment on site looked ok. |
2743286 | Primary Facility | 2018-06-13 | Routine/Partial Inspection | No Violations Noted | At time of inspection, drilling rig currently on-site. Wells 3H, 4H, and 5H previously spudded, not yet frac'd. Wells 1H and 2H drilled and frac'd. |
2755217 | Primary Facility | 2018-07-24 | Drilling/Alteration | No Violations Noted | At the time of this inspection the Rig had finished drilling this well to a TD of 13,250' and was being moved off location. The crew had put down a coat of water for dust control and the road and all equipment looked ok. |
2770806 | Primary Facility | 2018-09-05 | Drilling/Alteration | No Violations Noted | The fracking contractor Universal Well Services was fracking stage 2 at the time of my inspection. All paperwork and equipment on site looked ok. |
2782469 | Primary Facility | 2018-10-02 | Drilling/Alteration | No Violations Noted | The rig was drilling out frac plugs on this well at the time of this inspection. All paperwork, well log information and equipment on site looked ok. |
2818059 | Primary Facility | 2018-12-17 | Routine/Complete Inspection | No Violations Noted | At time of inspection well appears to be in production. Well head surrounded by cement barriers. Three brine tanks on site.
No activity taking place on site at this time. |
2823181 | Primary Facility | 2019-01-08 | Routine/Complete Inspection | No Violations Noted | This well is tagged, in production and temporarily shut in for a sales line upgrade which is taking place at the time of this inspection in order to provide additional pipeline capacity for the 5 wells on this unconventional well pad. The well head casing, piping, production set equipment, containment dike and tank battery look ok. |
2828396 | Primary Facility | 2019-01-17 | Routine/Complete Inspection | No Violations Noted | On 1/17/19 at 0903 hrs., I conducted a routine inspection of Snyder Brothers, Inc.'s Kuhns well pad and associated wells in Boggs Twp., Armstrong Co. Five wells have been drilled and are equipped for production, including well 5H (API 005-31304). Well tags are present at the well heads. There are no violations noted for this inspection. |
2853273 | Primary Facility | 2019-03-05 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, well was producing. Well integrity was in good condition, with no signs of any leaks or spills onsite. The well did not have any corrosion. The cellar was below ground level, with water inside. No bubbles were seen. The digital gauges on the well showed the tubing pressure to be 2345 psi and the casing pressure was 2663 psi. The well was properly labeled and the Emergency Response sign was posted at the site entrance. There were 3 dual line heaters and 5 separators onsite. The 1H & 2H wells had smaller separators than the rest of the wells. There were also 3 tall tanks and a smaller horizontal tank contained within a lined, steel dike. |
For data sources see[8]