If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-005-31330 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.708811,"lon":-79.626694,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Armstrong | |
Municipality: South Buffalo Township | |
Operator Name: SNYDER BROS INC | |
Well Pad ID: 154284 | |
Farm/Lease Name: NEUMANN 7H | |
License Status: | |
Spud Date: | |
Permit Date: 2018-06-26 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.708811 | |
Longitude: -79.626694 |
Date | Event |
---|---|
2018-06-26 | New Permit Application |
2018-07-07 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | SNYDER BROS INC | 666,176.00 | 55 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | SNYDER BROS INC | Drilling Fluid Waste | 16.88 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2018 | SNYDER BROS INC | Produced Fluid | 100.00 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2018 | SNYDER BROS INC | Drill Cuttings | 1,552.35 Tons | LANDFILL | 100585 |
2019 | SNYDER BROS INC | Other Oil & Gas Wastes | 150.50 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2019 | SNYDER BROS INC | Produced Fluid | 594.20 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | SNYDER BROS INC | Produced Fluid | 13,362.30 Bbl | INJECTION DISPOSAL WELL | 34-099-23158 |
2019 | SNYDER BROS INC | Produced Fluid | 2,226.10 Bbl | INJECTION DISPOSAL WELL | 34-099-23171 |
2019 | SNYDER BROS INC | Other Oil & Gas Wastes | 3.80 Bbl | INJECTION DISPOSAL WELL | 34-099-23171 |
2019 | SNYDER BROS INC | Produced Fluid | 10,365.20 Bbl | REUSE (AT WELL PAD) | |
2019 | SNYDER BROS INC | Other Oil & Gas Wastes | 13.10 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2019 | SNYDER BROS INC | Synthetic Liner Materials | 5.85 Tons | LANDFILL | 100280 |
2019 | SNYDER BROS INC | Synthetic Liner Materials | 2.78 Tons | RESIDUAL WASTE PROCESSING FACILITY | ODNR 2015-511 |
2019 | SNYDER BROS INC | Produced Fluid | 1,461.00 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | SNYDER BROS INC | Filter Socks | 0.47 Tons | LANDFILL | 100585 |
2019 | SNYDER BROS INC | Other Oil & Gas Wastes | 21.90 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | SNYDER BROS INC | Produced Fluid | 109.33 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2019 | SNYDER BROS INC | Waste Water Treatment Sludge | 46.70 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2019 | SNYDER BROS INC | Other Oil & Gas Wastes | 320.90 Bbl | REUSE (AT WELL PAD) |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2749889 | Primary Facility | 2018-07-09 | Routine/Complete Inspection | No Violations Noted | Inspection conducted in response to electronic spud notification scheduled for 7/7/18 for well 7H.
At time of inspection, auger rig on-site. Wells 7H and 8H to be spudded today. Wells 1H, 2H, 3H, 4H, 5H, and 6H have been spudded. |
2750656 | Primary Facility | 2018-07-11 | Drilling/Alteration | No Violations Noted | This well was spudded on 7/9/2018. The cellar is 6'X6'. The conductor hole was drilled to 40' and has 40' of 30" pipe installed and cemented to surface. The well has been covered with a steel plate for safety until the top hole Rig arrives. |
2782334 | Primary Facility | 2018-10-02 | Drilling/Alteration | No Violations Noted | The Rig was drilling at 2888' at the time of this inspection. All drilling log information and all equipment on site looked ok. |
2793619 | Primary Facility | 2018-10-24 | Drilling/Alteration | No Violations Noted | On this return date, the Patterson Finishing Rig is moving on the well pad and setting up to resume drilling the final lateral leg of this well and the rest of the 8 wells on this pad. The drillers log and permit copies are on site and all equipment looks ok. |
2802723 | Primary Facility | 2018-11-13 | Routine/Complete Inspection | No Violations Noted | Present during inspection is operator rep Rod Bennett.
According to Department records, this well was spud on 7-7-18. At time of inspection drilling actively taking place on well 2H. According to Mr. Bennett, wells 3H and 4H have been drilled and cemented and drilling will begin on well 1H next week. Mr. Bennett also states that operator intends to drill this well (7H), 5H, 6H, and 8H on this pad. |
For data sources see[7]