37-007-20293

Well Details

Well ID: 37-007-20293
Loading map...
Country: United States
State: Pennsylvania
County: Beaver
Municipality: Marion Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 154656
Farm/Lease Name: ZAHN LLOYD UNIT 1H
License Status:
Spud Date:
Permit Date: 2009-08-31
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.774889
Longitude: -80.184750

For data sources see[1][2][3]

Well History

Date Event
2009-08-31 New Permit Application
2009-09-25 Performed Spud Operation
2010-01-06 Drilling Completion
2010-03-22 Perforation
2010-08-09 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 RANGE RESOURCES APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2010 RANGE RESOURCES APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2011 RANGE RESOURCES APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2012 RANGE RESOURCES APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 PENNENERGY RESOURCES LLC 0.00 0 0.00 0 0.00 0
2014 PENNENERGY RESOURCES LLC 108,897.00 56 0.00 0 0.00 0
2015 PENNENERGY RESOURCES LLC 246,636.00 360 0.00 0 0.00 0
2016 PENNENERGY RESOURCES LLC 126,181.00 301 0.00 0 0.00 0
2017 PENNENERGY RESOURCES LLC 76,262.00 245 0.00 0 0.00 0
2019 PENNENERGY RESOURCES LLC 62,665.00 85 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 PENNENERGY RESOURCES LLC Produced Fluid 386.90 Bbl INJECTION DISPOSAL WELL 34-155-21438
2016 PENNENERGY RESOURCES LLC Produced Fluid 297.19 Bbl INJECTION DISPOSAL WELL 34-155-23196
2016 PENNENERGY RESOURCES LLC Produced Fluid 606.00 Bbl INJECTION DISPOSAL WELL 34-155-22403
2016 PENNENERGY RESOURCES LLC Produced Fluid 1,879.79 Bbl REUSE OTHER THAN ROAD SPREADING
2017 PENNENERGY RESOURCES LLC 937.90 Bbl REUSE (AT WELL PAD)
2017 PENNENERGY RESOURCES LLC Produced Fluid 1,431.19 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Produced Fluid 282.67 Tons REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Servicing Fluid 1.88 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Produced Fluid 1,178.31 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 PENNENERGY RESOURCES LLC Produced Fluid 18.28 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 PENNENERGY RESOURCES LLC Produced Fluid 60.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Produced Fluid 14,371.30 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Produced Fluid 26.10 Bbl RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 PENNENERGY RESOURCES LLC Produced Fluid 12.78 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 PENNENERGY RESOURCES LLC Produced Fluid 110.00 Bbl INJECTION DISPOSAL WELL 34-155-23196

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1838421 Primary Facility 2009-10-20 Drilling/Alteration No Violations Noted SITE PIT, E&S, & ACCESS, OK.
1838427 Primary Facility 2009-10-08 Drilling/Alteration No Violations Noted PIT IS LINED, RIG IS ON SITE BUT NOT SET UP.
1838448 Primary Facility 2009-10-27 Drilling/Alteration No Violations Noted TOP HOLE DONE. EQUIPTMENT IS BEING REMOVED.
1842254 Primary Facility 2009-10-30 Drilling/Alteration No Violations Noted TOP HOLE COMPLETE. NO ACTIVITY AT SITE.
1842663 Primary Facility 2009-10-27 Drilling/Alteration No Violations Noted HORIZONTAL UTICA/BLACK RIVER TRENTON
1844068 Primary Facility 2009-11-17 Drilling/Alteration No Violations Noted UTICA FORMATION. DRILLING AT 5493'.
1850447 Primary Facility 2009-12-14 Routine/Complete Inspection No Violations Noted Site is being drilled currently.
1851661 Primary Facility 2009-12-21 Drilling/Alteration No Violations Noted WILL TD AND CEMENT TO KOP ON 12/22/09.
1865480 Primary Facility 2009-01-14 Drilling/Alteration No Violations Noted DRILLING COMPLETE. SITE BEING CLEANED.
1865519 Primary Facility 2010-01-25 Drilling/Alteration No Violations Noted ADMIRAL RIG PULLING PIPE AFTER PERF JOB.
1865548 Primary Facility 2010-02-04 Drilling/Alteration No Violations Noted WELL HEAD EQUIPTMENT INSTALLED. NO ACTIVITY.
1865589 Primary Facility 2010-02-23 Drilling/Alteration No Violations Noted WELL HEAD EQUIPTMENT INSTALLED. NO ACTIVITY. SITE AND E&S, OK.
1868771 Primary Facility 2010-03-08 Routine/Complete Inspection No Violations Noted Site is drilled.
1869591 Primary Facility 2010-03-04 Drilling/Alteration No Violations Noted WELL HEAD EQUIPTMENT INSTALLED. NOT FRACED. NO ACTIVITY.
1882776 Primary Facility 2010-04-21 Drilling/Alteration No Violations Noted WELL IS BEING FLARED. SITE, PIT, E&S, AND ACCESS OK.
1882803 Primary Facility 2010-03-29 Drilling/Alteration No Violations Noted WELL WAS FRACED 3/25/10. FLARE STACK OFF. PIT, SITE, E&S, AND ACCESS, OK.
1883259 Primary Facility 2010-04-29 Routine/Complete Inspection No Violations Noted On April 29, 2010 I visited this site as a routine inspection. Flowback and flaring operations were taking place. The well site appeared to be in compliance. A site ID sign and E&S plan were posted on site. The access road was in good condition. E&S controls were in place according to the plan on site. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. The operator should continue to inspect the E&S controls routinely and after each runoff event until the site has reached uniform 70% vegetative cover.
1894766 Primary Facility 2010-05-14 Complaint Inspection No Violations Noted no well fire. well was flaring last week. flare stack now dismantled
1904433 Primary Facility 2010-07-07 Routine/Complete Inspection No Violations Noted
1904435 Primary Facility 2010-07-23 Routine/Complete Inspection No Violations Noted On July 23, 2010 I visited this site as a routine inspection. I met with Range representative Jeremy Matinko on site. Drilling has been completed but the well has not yet been brought into production. A site ID sign and E&S plan were posted on site. The access road was in good condition. E&S controls were in place according to the plan on site. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. The pit contained a small amount of water and drill cuttings at the time of my inspection. The pit had been previously drained. The liner contained several small tears in one section of the wall above the water line. It appears this was caused by an animal trying to climb out of the pit as evidenced by tracks in the material in the pit. These tears were not present at the time of my 4/29/10 inspection. Drill cuttings are to be removed from pit and hauled off site. The pit will be closed and filled shortly. The material under the pit will be examined at that time.
1911508 Primary Facility 2010-08-13 Routine/Complete Inspection No Violations Noted On August 13, 2010 I visited this site as a routine inspection. I met with Range representative Jeremy Matinko on site. Drilling has been completed but the well has not yet been brought into production. A site ID sign and E&S plan were posted on site. The access road was in good condition. E&S controls were in place according to the plan on site. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. Drill cuttings and the pit liner were being removed in accordance with the procedures noted in the 7/23/10 inspection.
1913196 Primary Facility 2010-08-11 Drilling/Alteration No Violations Noted SITE, ACCESS, & E&S, OK. PIT CUTTINGS ARE BEING LOADED INTO RESIDULE WASTE CONTAINERS, AND TRUCKED FROM SITE.
1913738 Primary Facility 2010-08-31 Routine/Complete Inspection No Violations Noted On August 31, 2010 I visited this site as a routine inspection. I met with Range representative Jeremy Matinko on site. Drilling has been completed but the well has not yet been brought into production. A site ID sign and E&S plan were posted on site. The access road was in good condition. E&S controls were in place according to the plan on site. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. All drill cuttings, fluids, and other material had been removed from the pit. The liner was also removed. There was no evidence observed of material leaking into the pit.
1928574 Primary Facility 2010-10-06 Routine/Complete Inspection No Violations Noted On October 6th, 2010 I visited this site as a routine inspection. Drilling has been completed but the well has not yet been brought into production. A site ID sign and E&S plan were posted on site. The access road was in good condition and gated. E&S controls were in place according to the plan on site. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. The pit had been closed and filled. The site had been graded and hydroseeded. Site condition looks good overall.
1930579 Primary Facility 2010-11-02 Routine/Complete Inspection No Violations Noted WELL IS COMPLETE AND FRACED. WELL IS SHUT IN. SITE IS RESTORED. E&S CONTROLS STILL PRESENT. ACCESS IS STONED AND GATED.
1939756 Primary Facility 2010-12-27 Routine/Complete Inspection No Violations Noted Sampling for Water Supply Complaint at a neighboring property.
1959522 Primary Facility 2011-03-07 Routine/Complete Inspection No Violations Noted On March 7th, 2011 I visited this site in response to a water supply complaint and collected water samples at a nearby residence. Drilling has been completed but the well has not yet been brought into production. A site ID sign and E&S plan were posted on site. The access road may require additional cross drains or more routine maintenance. E&S controls were in place according to the plan on site. Some areas of silt fence need maintenance. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. The pit had been closed and filled. The site had been graded and hydroseeded. Site condition looks good overall. The operator should contiue to inspect the E&S controls until 70% uniform vegetative cover is reached.
1983741 Primary Facility 2011-04-22 Routine/Complete Inspection No Violations Noted On April 22nd , 2011 I visited this site as a routine inspection. Drilling has been completed but the well has not yet been brought into production. A site ID sign and E&S plan were posted on site. The access road was in good condition. The silt fence was repaired. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. The pit had been closed and filled. The site had been graded and hydroseeded. Site condition looks good overall. The operator should contiue to inspect the E&S controls until 70% uniform vegetative cover is reached.
1984277 Primary Facility 2011-05-26 Routine/Complete Inspection No Violations Noted On May 26th , 2011 I visited this site as a routine inspection. Drilling has been completed but the well has not yet been brought into production. A site ID sign and E&S plan were posted on site. The access road was in good condition. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of inspection. Site restoration appears complete. Vegetation is coming in nicely and has reached the 70% minimum coverage. The remaining E&S controls can be removed by the operator.
2064087 Primary Facility 2012-04-25 Routine/Complete Inspection No Violations Noted
2260934 Primary Facility 2014-03-24 Routine/Complete Inspection No Violations Noted This site was regulatory inactive status at time of inspection. Well was properly labeled. Site was inspected in response to a request from the previous operator to the terminate the associated ESCGP. Site had been restored to its approximate original topography and had more than 70 percent uniform perennial vegetative cover. All BMPs and excess equipment had been removed. No E&S issues were apparent.
2426822 Primary Facility 2015-11-16 Routine/Complete Inspection No Violations Noted THIS IS A PRODUCING UTICA GAS WELL. THE WELL AND PRODUCTION EQUIPTMENT HAVE BEEN WELL MAINTAINED.
2661844 Primary Facility 2017-11-17 Routine/Complete Inspection No Violations Noted All site and access road erosion controls had been implemented and properly maintained. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Well appeared to be equipped for production. Brine tank located onsite within secondary containment. Both the tank and containment appeared to be in sound condition.
2712400 Primary Facility 2018-03-30 Drilling/Alteration No Violations Noted Pad under construction. No violations noted. NOVIO
2849278 Primary Facility 2019-03-06 Routine/Complete Inspection No Violations Noted At the time of inspection well drilled. No rig on site. Equipment and materials located on containment. Three brine tanks within secondary containment appear structurally sound and does not appear to be plumbed into production at the time of this inspection. GPUs located on secondary containment. AST located on site and appears to be structurally sound. All valves and pipes closed and properly secured. All access stairs gated and locked. AST signage identifying contents not affixed to structure at the time of Department inspection. Department request Operator address AST signage and notify WQS Santiapillai upon completion. No E&S issues.