If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-007-20396 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.739631,"lon":-80.1691,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Beaver | |
Municipality: New Sewickley Township | |
Operator Name: PENNENERGY RESOURCES LLC | |
Well Pad ID: 145356 | |
Farm/Lease Name: B1 PER B1-3HUD | |
License Status: | |
Spud Date: | |
Permit Date: 2013-07-08 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.739631 | |
Longitude: -80.1691 |
Date | Event |
---|---|
2013-07-08 | New Permit Application |
2013-09-11 | Performed Spud Operation |
2013-10-07 | Drilling Completion |
2014-01-10 | Perforation |
2014-03-01 | Drilling Completion |
2014-04-21 | Newly Drilled |
2016-01-05 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-02-19 | 2014-03-01 | 5,140 | 13,270,000 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | EC6116A | Nalco | Biocide | Polyethylene Glycol | 25322-68-3 | 60 | 0.00667149 | 8481.36 |
Dibromoacetonitrile | 3252-43-5 | 5 | 0.000555958 | 706.78 | ||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30 | 0.00333575 | 4240.68 | ||||
Hydrochloric Acid (7.5%) | Axiall | Acidizing | Hydrogen Chloride | 7647-01-0 | 40 | 1.1709 | 1,488,540.0 | |
Scale Hib A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.00329451 | 4188.26 | |
Sand (Proppant) | Sargent | Proppant | Silica | 14808-60-7 | 99.9 | 9.83669 | 12,505,200.0 | |
I-7L | Weatherford | Iron Control | Triethanolamine Hydroxyacetate | 68299-02-5 | 20 | 0.00212445 | 2700.78 | |
Glycolic Acid | 79-14-1 | 2.5 | 0.000265556 | 337.597 | ||||
Ethylene Glycol | 107-21-1 | 20 | 0.00212445 | 2700.78 | ||||
WGA-3 | PfP Technology | Water Viscosifier | Guar Gum | 9000-30-0 | 100 | 0.00125857 | 1600 | |
Water | PennEnergy Resources | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 87.1076 | 110,738,000.0 | |
Unislik ST50 | CESI | Friction Reducer | Petroleum Distillates, Hydrotreated Light | 64742-47-8 | 30 | 0.0253226 | 32192.2 | |
LEB 10X | Weatherford | Gel Breaker | Ethylene Glycol | 107-21-1 | 40 | 0.00001217 | 15.475 | |
Unihib G | GeoSafe | Acid Corrosion Inhibitor | Acetophenone | 98-86-2 | 1 | 0.00000189 | 2.406 | |
Thiourea | 62-56-6 | 1 | 0.00000189 | 2.406 | ||||
Glycol Ether | 112-34-5 | 60 | 0.000113548 | 144.352 | ||||
Ethoxylated Alcohol | 68002-97-1 | 35 | 0.00006624 | 84.205 | ||||
Methanol | 67-56-1 | 5 | 0.00000946 | 12.029 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00000189 | 2.406 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | PENNENERGY RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | PENNENERGY RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | PENNENERGY RESOURCES LLC | 699,724.00 | 176 | 0.00 | 0 | 8,614.00 | 176 |
2016 | PENNENERGY RESOURCES LLC | 1,029,445.00 | 366 | 0.00 | 0 | 8,796.00 | 366 |
2017 | PENNENERGY RESOURCES LLC | 799,230.00 | 348 | 0.00 | 0 | 4,571.00 | 348 |
2018 | PENNENERGY RESOURCES LLC | 691,726.00 | 356 | 0.00 | 0 | 3,322.00 | 356 |
2019 | PENNENERGY RESOURCES LLC | 598,076.00 | 349 | 0.00 | 0 | 2,637.00 | 349 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | PENNENERGY RESOURCES LLC | Drilling Fluid Waste | 3,835.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | EPA ID: 748-163 |
2013 | PENNENERGY RESOURCES LLC | Drill Cuttings | 752.00 Tons | LANDFILL | CID # 28726 |
2014 | PENNENERGY RESOURCES LLC | Fracturing Fluid Waste | 47.30 Tons | LANDFILL | CID # 28726 |
2014 | PENNENERGY RESOURCES LLC | Drill Cuttings | 25.75 Tons | LANDFILL | CID # 28726 |
2015 | PENNENERGY RESOURCES LLC | Servicing Fluid | 21.00 Bbl | LANDFILL | CID # 28726 |
2016 | PENNENERGY RESOURCES LLC | Produced Fluid | 72.40 Bbl | CENT WASTE TRT FAC NPDES | EPA ID: 748-163 |
2016 | PENNENERGY RESOURCES LLC | Produced Fluid | 483.10 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2016 | PENNENERGY RESOURCES LLC | Produced Fluid | 72.40 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | EPA ID: 748-163 |
2016 | PENNENERGY RESOURCES LLC | Produced Fluid | 1,225.79 Bbl | INJECTION DISPOSAL WELL | 34-155-22403 |
2016 | PENNENERGY RESOURCES LLC | Produced Fluid | 428.81 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2016 | PENNENERGY RESOURCES LLC | Produced Fluid | 4,471.89 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | PENNENERGY RESOURCES LLC | Produced Fluid | 3,302.13 Bbl | REUSE (AT WELL PAD) | |
2017 | PENNENERGY RESOURCES LLC | 2,939.10 Bbl | REUSE (AT WELL PAD) | ||
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 1,475.28 Bbl | REUSE (AT WELL PAD) | |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 38.16 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 35.78 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 33.69 Bbl | INJECTION DISPOSAL WELL | 34-155-22403 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 69.01 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 1,915.48 Bbl | REUSE (AT WELL PAD) | |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 69.65 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2201875 | Primary Facility | 2013-09-05 | Administrative/File Review | No Violations Noted | This preoperational inspection satisfies operator's obligation as outlined under Title 58 , Ch 32 § 3258 a. 1. |
2205409 | Primary Facility | 2013-09-18 | Routine/Complete Inspection | No Violations Noted | This well targets the Geneseo Shale formation. The conductor was set and the cellar was covered with steel plate. The inspection for this well was conducted concurrently with the inspection for site number 768793 (inspection report # 2205390.) Impoundment was without liner and under construction. No erosion or sedimentation issues were apparent. |
2206056 | Primary Facility | 2013-09-11 | Drilling/Alteration | No Violations Noted | AN AUGER RIG IS ON THE PAD TO DRILL THE CONDUCTOR. THE SITE IS OK. |
2206058 | Primary Facility | 2013-09-18 | Drilling/Alteration | No Violations Noted | CELLER AND CONDUCTOR ARE IN AND COVERED. |
2212252 | Primary Facility | 2013-10-08 | Drilling/Alteration | No Violations Noted | TOP HOLE IS COMPLETE. THE RIG IS MOVING FROM THE PAD. |
2213881 | Primary Facility | 2013-10-16 | Drilling/Alteration | No Violations Noted | THE WELL IS COVERED WITH A STEEL PLATE. PAD PROTECTION HAS BEEN LEFT DOWN. |
2223187 | Primary Facility | 2013-11-14 | Drilling/Alteration | No Violations Noted | TOP HOLE DRILLING IS COMPLETE. |
2227170 | Primary Facility | 2013-11-25 | Drilling/Alteration | No Violations Noted | TOP HOLE COMPLETE. 8 5/8" CASING SET AT 2006'. RIG ON THE PAD WILL FINISH THIS WELL. |
2227173 | Primary Facility | 2013-12-05 | Drilling/Alteration | No Violations Noted | TOP HOLE COMPLETE AT 2,020'. PATTERSON RIG WILL FINISH THE HOLE. THE SITE IS IN GOOD CONDITION. |
2231780 | Primary Facility | 2013-12-11 | Drilling/Alteration | No Violations Noted | TOP HOLE DRILLED TO 2020'. PATTERSON 259 WILL MOVE TO THIS WELL AND FINISH DRILLING. |
2232278 | Primary Facility | 2013-10-10 | Routine/Complete Inspection | No Violations Noted | This well targets the Geneseo Shale formation. This well was partially drilled and properly labeled. The inspection for this well was conducted concurrently with the inspection for site number 768793 (inspection report # 2232277.) Impoundment was dug and unlined. No erosion or sedimentation issues were apparent. |
2232813 | Primary Facility | 2013-11-05 | Routine/Complete Inspection | No Violations Noted | This well targets the Geneseo Shale formation. The inspection for this well was conducted concurrently with the inspection for site number 768793 (inspection report # 2232809.) Temporary stabilization appeared adequate. No erosion or sedimentation issues were observed. |
2232823 | Primary Facility | 2013-11-12 | Routine/Complete Inspection | No Violations Noted | This well targets the Geneseo Shale formation. The inspection for this well was conducted concurrently with the inspection for site number 768793 (inspection report # 2232820.) Water impoundment was being lined. No erosion or sedimentation issues were apparent. |
2236882 | Primary Facility | 2014-01-13 | Routine/Complete Inspection | No Violations Noted | This well targets the Geneseo Shale formation. The inspection for this well was conducted concurrently with the inspection for site number 768793 (inspection report # 2236823.) Two minor slips were noted on pad's embankments. Crews were erecting equipment in preparation for stimulation operations. An above ground storage tank (AST) was being erected. Inspector confirmed with operator's representative that it would be used for flow back fluids. Operator's representative agreed to provide a copy of the OG-71 for the AST. |
2247357 | Primary Facility | 2014-01-02 | Drilling/Alteration | No Violations Noted | THE SITE IS BEING PREPARED FOR PRESSURE TEST AND FRAC. |
2247360 | Primary Facility | 2014-01-14 | Drilling/Alteration | No Violations Noted | WELL IS BEING TESTED AS PART OF THE STIMULUS PROCESS. |
2251836 | Primary Facility | 2014-02-11 | Drilling/Alteration | No Violations Noted | WELL IS DRILLED. RIG IS GONE. SNOW REMOVAL IS THE ONLY ACTIVITY. |
2255752 | Primary Facility | 2014-03-17 | Drilling/Alteration | No Violations Noted | FRAC PLUGS ARE DRILLED OUT. FLOWBACK HAS NOT STARTED. |
2255756 | Primary Facility | 2014-03-13 | Drilling/Alteration | No Violations Noted | FRAC PLUGS ARE DRILLED OUT. WELL IS READY FOR FLOWBACK. |
2257676 | Primary Facility | 2014-03-20 | Drilling/Alteration | No Violations Noted | FRAC PLUGS HAVE BEEN DRILLED OUT, BUT FLOWBACK OPS HAVE NOT STARTED. |
2259858 | Primary Facility | 2014-04-01 | Drilling/Alteration | No Violations Noted | FLOWBACK HAS STARTED, AND THE WELL IS FLARED. |
2275106 | Primary Facility | 2014-04-07 | Drilling/Alteration | No Violations Noted | FLOWBACK IS COMPLETE. THE WELL IS NO LONGER FLARED. THE SITE IS OK. |
2361477 | Primary Facility | 2015-04-10 | Routine/Partial Inspection | No Violations Noted | |
2372410 | Primary Facility | 2015-04-20 | Drilling/Alteration | No Violations Noted | ALL FRAC PLUGS ARE DRILLED OUT. THEY WILL RUN TUBING. THE SITE IS OK. |
2374329 | Primary Facility | 2015-05-26 | Routine/Complete Inspection | No Violations Noted | |
2391271 | Primary Facility | 2015-07-17 | Drilling/Alteration | No Violations Noted | THIS WELL IS FRACED AND BEING HOOKED UP FOR PRODUCTION. |
2392557 | Primary Facility | 2015-07-17 | Routine/Complete Inspection | No Violations Noted | |
2439248 | Primary Facility | 2016-01-04 | Routine/Complete Inspection | No Violations Noted | |
2439250 | Primary Facility | 2016-01-04 | Routine/Complete Inspection | No Violations Noted | |
2478963 | Primary Facility | 2016-04-22 | Routine/Complete Inspection | No Violations Noted | |
2561368 | Primary Facility | 2017-02-14 | Routine/Complete Inspection | No Violations Noted | On 2/14/2017, Brian MacQuarrie onsite at unconventional well site. Act 9 sign in place. Erosion and Sedimentation Plan onsite. Three wells in production. Wells properly tagged. Two 400 bbl tanks installed within stainless steel containment structure. Freshwater impoundment maintained and fenced in. Erosion and Sedimentation Best Management Practices installed and maintained. Site stabilized with vegetative growth in previously disturbed areas. No apparent E/S issues. |
2666341 | Primary Facility | 2017-12-01 | Routine/Complete Inspection | No Violations Noted | Site had been constructed as outlined in the E&S plan contained within the ESCGP. All site and access road erosion controls had been implemented and properly maintained. There was no observed accelerated erosion or sedimentation in relation to the site or access road. All disturbed areas had been stabilized with vegetation attaining 70% uniform vegetative cover. Well appeared to be equipped for production. Two produced fluids tanks were located onsite within containment. Both the tanks and containment appeared to be in sound condition. |
2683656 | Primary Facility | 2018-01-18 | Routine/Complete Inspection | No Violations Noted | Site had been constructed as outlined within the E&S Plan contained within the ESCGP. Evaluation of erosion control functionality and maintenance was not feasible due to snow and ice conditions. Well appeared to be equipped for production. Two brine tanks were located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. Well development impoundment located onsite and it was observed to contain frozen fluids and snow. |
2698790 | Primary Facility | 2018-02-27 | Routine/Complete Inspection | No Violations Noted | Site and access road had been constructed in accordance with the ESCGP. All site and access road erosion controls had been implemented and maintained properly. All disturbed slopes and soil stockpiles had been stabilized with vegetation. There was no observed accelerated erosion or sedimentation in relation to the site or access road. It was noted that significant precipitation events had recently ceased. Two produced fluids tanks were located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. There was an Act 9 sign located onsite in accordance with 25 Pa Code Chapter 78a.55(i). |
2761043 | Primary Facility | 2018-08-07 | Complaint Inspection | No Violations Noted | At the time of inspection well equipped for production. Two brine tanks within secondary containment and appears structurally sound. GPUs within containment. No E&S issues. |
For data sources see[8]