{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.721764,"lon":-80.164781,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Beaver | |
Municipality: New Sewickley Township | |
Operator Name: PENNENERGY RESOURCES LLC | |
Well Pad ID: 145779 | |
Farm/Lease Name: B2 PER B2-1H | |
License Status: Active | |
Spud Date: 2014-06-11 | |
Permit Date: 2013-07-10 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.721764 | |
Longitude: -80.164781 |
Date | Event |
---|---|
2013-07-10 | New Permit Application |
2014-06-11 | Performed Spud Operation |
2015-05-07 | New Permit Application |
2015-06-25 | Drilling Completion |
2015-09-01 | New Permit Application |
2016-09-01 | Permit Renewal Application |
2020-01-29 | Deviated |
2020-01-29 | Newly Drilled |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-12-19 | 2017-01-06 | 5,191 | 11,509,600 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | LEB 10X | Weatherford | Gel Breaker | Ethylene Glycol | 107-21-1 | 40 | 0.00000182 | 2.036 |
Scale Hib A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.00411007 | 4598.43 | |
Sand (Proppant) | Sargent | Proppant | Silica | 14808-60-7 | 99.9 | 9.98625 | 11,172,800.0 | |
Water | PennEnergy Resources | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 87.5559 | 97,959,200.0 | |
Unigel 5F | PfP Technology | Water Viscosifier | Guar Gum | 9000-30-0 | 100 | 0.000335175 | 375 | |
Unislik ST50 | CESI | Friction Reducer | Petroleum Distillates, Hydrotreated Light | 64742-47-8 | 30 | 0.0278364 | 31143.9 | |
EC6116A | Nalco | Biocide | Dibromoacetonitrile | 3252-43-5 | 5 | 0.00071123 | 795.737 | |
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30 | 0.00426738 | 4774.43 | ||||
Polyethylene Glycol | 25322-68-3 | 60 | 0.00853475 | 9548.85 | ||||
Unihib G | GeoSafe | Acid Corrosion Inhibitor | Thiourea | 62-56-6 | 1 | 0.00000742 | 8.304 | |
Formaldehyde | 50-00-0 | 1 | 0.00000742 | 8.304 | ||||
Glycol Ether | 112-34-5 | 60 | 0.000445332 | 498.247 | ||||
Methanol | 67-56-1 | 5 | 0.00003711 | 41.521 | ||||
Acetophenone | 98-86-2 | 1 | 0.00000742 | 8.304 | ||||
Ethoxylated Alcohol | 68002-97-1 | 35 | 0.000259777 | 290.644 | ||||
Hydrochloric Acid (7.5%) | Axiall | Acidizing | Hydrogen Chloride | 7647-01-0 | 40 | 0.930438 | 1,040,990.0 | |
Other Chemical(s) | Listed Above | See Trade Name(s) List | Formaldehyde | 50-00-0 | 1 | 0.00000742 | 8.304 | |
Polyethylene Glycol | 25322-68-3 | 60 | 0.00853475 | 9548.85 | ||||
Acetophenone | 98-86-2 | 1 | 0.00000742 | 8.304 | ||||
Thiourea | 62-56-6 | 1 | 0.00000742 | 8.304 | ||||
Methanol | 67-56-1 | 5 | 0.00003711 | 41.521 | ||||
Ethoxylated Alcohol | 68002-97-1 | 35 | 0.000259777 | 290.644 | ||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30 | 0.00426738 | 4774.43 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | PENNENERGY RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | PENNENERGY RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | PENNENERGY RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | PENNENERGY RESOURCES LLC | 784,706.00 | 287 | 0.00 | 0 | 5,381.00 | 287 |
2018 | PENNENERGY RESOURCES LLC | 771,575.00 | 354 | 0.00 | 0 | 4,487.00 | 354 |
2019 | PENNENERGY RESOURCES LLC | 634,535.00 | 355 | 0.00 | 0 | 2,520.00 | 355 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2015 | PENNENERGY RESOURCES LLC | Drill Cuttings | 215.24 Tons | LANDFILL | CID # 28726 |
2016 | PENNENERGY RESOURCES LLC | Drilling Fluid Waste | 1,645.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | EPA ID: 748-163 |
2016 | PENNENERGY RESOURCES LLC | Drilling Fluid Waste | 102.86 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | PENNENERGY RESOURCES LLC | Drilling Fluid Waste | 1,645.00 Bbl | CENT WASTE TRT FAC NPDES | EPA ID: 748-163 |
2016 | PENNENERGY RESOURCES LLC | Other Oil & Gas Wastes | 25.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2016 | PENNENERGY RESOURCES LLC | Drill Cuttings | 646.50 Tons | LANDFILL | CID # 28726 |
2017 | PENNENERGY RESOURCES LLC | Other Oil & Gas Wastes | 112.50 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2017 | PENNENERGY RESOURCES LLC | Waste Water Treatment Sludge | 5.34 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2017 | PENNENERGY RESOURCES LLC | 25.47 Bbl | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 | |
2017 | PENNENERGY RESOURCES LLC | 112.50 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 | |
2017 | PENNENERGY RESOURCES LLC | Produced Fluid | 15.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2017 | PENNENERGY RESOURCES LLC | 15.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 | |
2017 | PENNENERGY RESOURCES LLC | Produced Fluid | 25.47 Bbl | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2017 | PENNENERGY RESOURCES LLC | Other Oil & Gas Wastes | 37.50 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2017 | PENNENERGY RESOURCES LLC | 21,191.83 Bbl | REUSE (AT WELL PAD) | ||
2017 | PENNENERGY RESOURCES LLC | Synthetic Liner Materials | 21.63 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
2017 | PENNENERGY RESOURCES LLC | Produced Fluid | 7.50 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2017 | PENNENERGY RESOURCES LLC | Produced Fluid | 25,787.64 Bbl | REUSE (AT WELL PAD) | |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 116.60 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 3,979.35 Bbl | REUSE (AT WELL PAD) | |
2018 | PENNENERGY RESOURCES LLC | Produced Fluid | 110.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2018 | PENNENERGY RESOURCES LLC | Servicing Fluid | 20.33 Tons | RESIDUAL WASTE PROCESSING FACILITY | PAD085690592 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 45.27 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 46.11 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 114.35 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 2,667.46 Bbl | REUSE (AT WELL PAD) | |
2019 | PENNENERGY RESOURCES LLC | Produced Fluid | 549.80 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2225191 | Primary Facility | 2013-11-26 | Preoperation Inspection | No Violations Noted | This preoperational inspection satisfies operator's obligation as outlined under Title 58 , Ch 32 § 3258 a. 1. |
2278565 | Primary Facility | 2014-06-11 | Drilling/Alteration | No Violations Noted | ROCKY MOUNTAIN DRILLING IS INSTALLING THE CELLAR FOR THIS WELL. 40' OF CONDUCTOR PIPE WILL BE CEMENTED. THE SITE IS IN GOOD CONDITION. |
2287530 | Primary Facility | 2014-07-02 | Drilling/Alteration | No Violations Noted | THE CONDUCTOR IS IN. THE WATER IMPOUNDMENT IS BEING LINED. THE SITE IS IN GOOD CONDITION. |
2288219 | Primary Facility | 2014-06-25 | Drilling/Alteration | No Violations Noted | THE CONDUCTOR IS IN. THERE IS NO EQUIPTMENT ON THE PAD. |
2288222 | Primary Facility | 2014-06-11 | Drilling/Alteration | No Violations Noted | ROCKY MOUNTAIN IS INSTALLING THE CELLAR FOT THIS WELL. 40' OF 16" CONDUCTOR WILL THEN BE CEMENTED. |
2288875 | Primary Facility | 2014-06-24 | Routine/Complete Inspection | No Violations Noted | Inspection of this well was concurrent with site inspection. This well targeting the Burkett Shale layer had conductor set, but tophole had not yet been drilled. Cellar was covered by a metal plate. Impoundment was constructed but not lined. Well was properly labeled. All perimeter controls appeared to be installed according to plan and sufficient to prevent off-site transfer of sediment. No erosion or sedimentation issues were apparent. |
2381571 | Primary Facility | 2015-06-23 | Drilling/Alteration | No Violations Noted | HIGHLANDS RIG 9 DRILLED TO 800'. THEY ARE PULLING THE DRILL RODS THEN WILL RUN THIER 113/4" CASING. |
2386502 | Primary Facility | 2015-07-07 | Routine/Complete Inspection | No Violations Noted | |
2439224 | Primary Facility | 2016-01-04 | Routine/Complete Inspection | No Violations Noted | |
2480559 | Primary Facility | 2016-04-22 | Drilling/Alteration | No Violations Noted | TOP HOLE DRILLING IS COMPLETE. THE SITE IS IN GOOD CONDITION. INACTIVE STATUS IS PENDING FOR THE WELLS ON THIS PAD. |
2518540 | Primary Facility | 2016-09-12 | Routine/Complete Inspection | No Violations Noted | |
2528239 | Primary Facility | 2016-10-07 | Routine/Complete Inspection | No Violations Noted | |
2534416 | Primary Facility | 2016-10-24 | Drilling/Alteration | No Violations Noted | HIGHLANDS DRILLED THE TOP HOLE OF THIS WELL. PATTERSON IS SETTING UP TO DRILL THE BOTTOM PORTION.
THE SITE IS IN GOOD CONDITION. |
2548176 | Primary Facility | 2016-10-31 | Drilling/Alteration | No Violations Noted | PATTERSON 259 RAN 11,063' OF 5.5" CASING. THE RIG IS DOWN WAITING ON HALIBURTON CEMENTERS.
THE SITE IS IN GOOD CONDITION. |
2556724 | Primary Facility | 2017-01-31 | Routine/Complete Inspection | No Violations Noted | On 1/31/2017, WQS Brian MacQuarrie onsite at unconventional well site. Stimulation activities currently underway. Fracing completed at wells B2-1HUD (Permit No. 37-007-20399) and B2-3H (Permit No. 37-007-20397). Fracing operations continuing at B2-2HUD (Permit No. 37-007-20400) and B2-4H (Permit No. 37-007-20398). Temporary AST onsite to aid with stimulation activities. Secondary containment setup around wells. Two 400 bbl production tanks installed within secondary steel containment structure. Freshwater impoundment maintained and fenced in. Erosion and Sedimentation best management practices installed and maintained. No apparent E/S issues. Snow on ground during inspection. |
2561401 | Primary Facility | 2017-02-14 | Routine/Complete Inspection | No Violations Noted | On 2/14/2017, WQS Brian MacQuarrie onsite at unconventional well site. Act 9 sign maintained at site entrance. Erosion and Sedimentation Plan in site mailbox. Stimulation activities concluded on Four wells. Equipment moving to B8 well site. Production tanks ( two 400 bbl capacity) installed within stainless steel containment structure. AST setup onsite which contains impaired water used for stimulation activities. Secondary containment maintained onsite. Freshwater impoundment maintained and fenced in. Erosion and Sedimentation Best Management Practices installed and maintained. Site stabilized in previously disturbed areas with vegetative growth. No apparent E/S issues. |
2579566 | Primary Facility | 2017-04-06 | Routine/Complete Inspection | No Violations Noted | On 4/6/2017, WQS Brian MacQuarrie onsite at unconventional well site. Act 9 sign maintained at site entrance. Erosion and Sedimentation Plan in site mailbox. Four wells in production. Production tanks ( two 400 bbl capacity) installed within stainless steel containment structure. AST setup onsite which contains impaired water used for stimulation activities. Secondary containment maintained onsite. Freshwater impoundment maintained and fenced in. Erosion and Sedimentation Best Management Practices installed and maintained. Site stabilized in previously disturbed areas with vegetative growth. No apparent E/S issues. |
2596956 | Primary Facility | 2017-05-24 | Routine/Complete Inspection | No Violations Noted | On 5/24/2017, WQS Brian MacQuarrie onsite at unconventional well site. Act 9 sign maintained at site entrance. Erosion and Sedimentation Plan in site mailbox. Four wells in production. Production tanks ( two 400 bbl capacity) installed within stainless steel containment structure. AST setup onsite which contains impaired water used for stimulation activities. Secondary containment setup around frac tank. Freshwater impoundment maintained and fenced in. Erosion and Sedimentation Best Management Practices installed and maintained. Site stabilized in previously disturbed areas with vegetative growth. No apparent E/S issues. |
2624774 | Primary Facility | 2017-08-11 | Routine/Complete Inspection | No Violations Noted | On 8/11/2017, WQS Brian MacQuarrie onsite to conduct inspection of unconventional well site. Four wells in production. Freshwater impoundment maintained, lined and fenced in. Vegetative cover well established in previously disturbed areas. Erosion and Sedimentation best management practices maintained. |
2646725 | Primary Facility | 2017-10-11 | Routine/Partial Inspection | No Violations Noted | This well and the pad are in good condition. |
2666311 | Primary Facility | 2017-12-01 | Routine/Complete Inspection | No Violations Noted | Site had been constructed as outlined in the E&S plan contained within the ESCGP. All site and access road erosion controls had been implemented and properly maintained. There was no observed accelerated erosion or sedimentation in relation to the site or access road. All disturbed areas had been stabilized with vegetation attaining 70% uniform vegetative cover. Well appeared to be equipped for production. Two production fluid tanks were located onsite within containment. Both the tanks and containment appeared to be in sound condition. Well development impoundment was located onsite and it was holding freshwater with significant algae growth. |
2684128 | Primary Facility | 2018-01-18 | Routine/Complete Inspection | No Violations Noted | Site had been constructed as outlined within the E&S Plan contained within the ESCGP. Evaluation of erosion control functionality and maintenance was not feasible due to snow and ice conditions. Well appeared to be equipped for production. Two brine tanks were located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. Well development impoundment located onsite and it was observed to contain frozen fluids and snow. |
2756197 | Primary Facility | 2018-07-26 | Routine/Complete Inspection | No Violations Noted | This well has been well maintained. The pad is in good condition. |
2853874 | Primary Facility | 2019-03-14 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Brine tanks within secondary containment and appear structurally sound. GPUs within secondary containment. No E&S issues. |