Well Details

Well ID: 37-007-20400
Loading map...
Country: United States
State: Pennsylvania
County: Beaver
Municipality: New Sewickley Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 145779
Farm/Lease Name: B2 PER B2-2H
License Status: Active
Spud Date: 2014-06-12
Permit Date: 2013-07-08
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.721725
Longitude: -80.164778

For data sources see[1][2][3]

Well History

Date Event
Newly Drilled
2013-07-08 New Permit Application
2014-06-11 Performed Spud Operation
2015-05-07 New Permit Application
2015-06-28 Drilling Completion
2015-09-02 New Permit Application
2016-10-04 Permit Renewal Application
2020-01-29 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-01-23 2017-02-02 5,223 11,545,300 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water PennEnergy Resources Carrier/Base Fluid Water 7732-18-5 100 86.6745 97,203,300.0
Sand (Proppant) Sargent Proppant Silica 14808-60-7 99.9 10.4819 11,755,200.0
Other Chemical(s) Listed Above See Trade Name(s) List Formaldehyde 50-00-0 1 0.00001225 13.737
Ethoxylated Alcohol 68002-97-1 35 0.000428708 480.785
Methanol 67-56-1 5 0.00006124 68.684
Thiourea 62-56-6 1 0.00001225 13.737
Acetophenone 98-86-2 1 0.00001225 13.737
Hydrochloric Acid (7.5%) Axiall Acidizing Hydrogen Chloride 7647-01-0 40 1.08803 1,220,190.0
Unihib G GeoSafe Acid Corrosion Inhibitor Glycol Ether 112-34-5 60 0.000734927 824.202
Formaldehyde 50-00-0 1 0.00001225 13.737
Methanol 67-56-1 5 0.00006124 68.684
Thiourea 62-56-6 1 0.00001225 13.737
Acetophenone 98-86-2 1 0.00001225 13.737
Ethoxylated Alcohol 68002-97-1 35 0.000428708 480.785
TRS 11800, TRS 3001, EC6111A TightRock Solutions Frac Fluid Additives Ethylene Glycol 107-21-1 5 0.000459217 515
Inorganic Salt Proprietary 10 0.00941344 10556.9
Methanol 67-56-1 1 0.00008471 95
Alkyl Alcohol Proprietary 10 0.00941344 10556.9
Sodium Phosphate, Tribasic 7601-54-9 5 0.000459217 515
Glutaraldehyde 111-30-8 30 0.00252257 2829
Amine Triphosphate Proprietary 30 0.0027553 3090
Oxyalkylated Alcohol Proprietary 5 0.00470672 5278.47
Hydrotreated Light Distillate 64742-47-8 30 0.0282403 31670.8

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 PENNENERGY RESOURCES LLC 0.00 0 0.00 0 0.00 0
2015 PENNENERGY RESOURCES LLC 0.00 0 0.00 0 0.00 0
2016 PENNENERGY RESOURCES LLC 0.00 0 0.00 0 0.00 0
2017 PENNENERGY RESOURCES LLC 774,382.00 276 0.00 0 8,956.00 276
2018 PENNENERGY RESOURCES LLC 960,295.00 354 0.00 0 10,784.00 354
2019 PENNENERGY RESOURCES LLC 831,513.00 358 0.00 0 7,068.00 358

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 PENNENERGY RESOURCES LLC Drill Cuttings 243.93 Tons LANDFILL CID # 28726
2016 PENNENERGY RESOURCES LLC Drilling Fluid Waste 930.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2016 PENNENERGY RESOURCES LLC Drilling Fluid Waste 930.00 Bbl CENT WASTE TRT FAC NPDES EPA ID: 748-163
2016 PENNENERGY RESOURCES LLC Other Oil & Gas Wastes 25.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2016 PENNENERGY RESOURCES LLC Drill Cuttings 530.49 Tons LANDFILL CID # 28726
2017 PENNENERGY RESOURCES LLC Other Oil & Gas Wastes 113.50 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 PENNENERGY RESOURCES LLC Waste Water Treatment Sludge 5.34 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2017 PENNENERGY RESOURCES LLC 21.09 Bbl RESIDUAL WASTE PROCESSING FACILITY 2014-541
2017 PENNENERGY RESOURCES LLC 36.50 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 PENNENERGY RESOURCES LLC Produced Fluid 15.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2017 PENNENERGY RESOURCES LLC 15.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2017 PENNENERGY RESOURCES LLC Produced Fluid 21.09 Bbl RESIDUAL WASTE PROCESSING FACILITY 2014-541
2017 PENNENERGY RESOURCES LLC Other Oil & Gas Wastes 37.50 Bbl INJECTION DISPOSAL WELL 34-155-23223
2017 PENNENERGY RESOURCES LLC 17,314.12 Bbl REUSE (AT WELL PAD)
2017 PENNENERGY RESOURCES LLC Produced Fluid 7.50 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 PENNENERGY RESOURCES LLC Produced Fluid 18,722.97 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Produced Fluid 2,004.81 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Servicing Fluid 21.46 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Produced Fluid 60.02 Bbl INJECTION DISPOSAL WELL 34-155-23795
2019 PENNENERGY RESOURCES LLC Produced Fluid 61.37 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 PENNENERGY RESOURCES LLC Produced Fluid 152.17 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Produced Fluid 2,405.56 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Produced Fluid 122.16 Bbl INJECTION DISPOSAL WELL 34-155-23196

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2278566 Primary Facility 2014-06-11 Drilling/Alteration No Violations Noted AN AUGER RIG IS ON THE PAD TO INSTALL CELLAR AND THE CONDUCTOR. THE SITE IS OK.
2288228 Primary Facility 2014-06-11 Drilling/Alteration No Violations Noted ROCKY MOUNTAIN DRILLING HAS A RIG ON THE PAD TO INSTALL THE CELLAR AND CONDUCTOR.
2288892 Primary Facility 2014-06-24 Routine/Complete Inspection No Violations Noted Inspection of this well was concurrent with site inspection. This well targeting the Burkett Shale layer had conductor set, but tophole had not yet been drilled. Cellar was covered by a metal plate. Impoundment was constructed but not lined. Well was properly labeled. All perimeter controls appeared to be installed according to plan and sufficient to prevent off-site transfer of sediment. No erosion or sedimentation issues were apparent.
2383234 Primary Facility 2015-06-29 Drilling/Alteration No Violations Noted THE 85/8" CASING CEMENT JOB IS COMPLETE. HIGHLANDS RIG 9 WILL MOVE TO THE 3H WELL.
2386503 Primary Facility 2015-07-07 Routine/Complete Inspection No Violations Noted
2439228 Primary Facility 2016-01-04 Routine/Complete Inspection No Violations Noted
2480557 Primary Facility 2016-04-22 Drilling/Alteration No Violations Noted TOP HOLE DRILLING IS COMPLETE. THE SITE IS IN GOOD CONDITION.
2518541 Primary Facility 2016-09-12 Routine/Complete Inspection No Violations Noted
2528240 Primary Facility 2016-10-07 Routine/Complete Inspection No Violations Noted
2534289 Primary Facility 2016-10-17 Drilling/Alteration No Violations Noted PATTERSON 259 IS SETTING UP TO RESUME DRILLING AT 2,304'.

THE SITE IS IN GOOD CONDITION.

2534421 Primary Facility 2016-10-24 Drilling/Alteration No Violations Noted PATTERSON 259 RAN 11,930' OF PRODUCTION CASING. THE CASING IS CEMENTED TO THE SURFACE.

THE SITE IS IN GOOD CONDITION.

2556726 Primary Facility 2017-01-31 Routine/Complete Inspection No Violations Noted On 1/31/2017, WQS Brian MacQuarrie onsite at unconventional well site. Stimulation activities currently underway. Fracing completed at wells B2-1HUD (Permit No. 37-007-20399) and B2-3H (Permit No. 37-007-20397). Fracing operations continuing at B2-2HUD (Permit No. 37-007-20400) and B2-4H (Permit No. 37-007-20398). Temporary AST onsite to aid with stimulation activities. Secondary containment setup around wells. Two 400 bbl production tanks installed within secondary steel containment structure. Freshwater impoundment maintained and fenced in. Erosion and Sedimentation best management practices installed and maintained. No apparent E/S issues. Snow on ground during inspection.
2561404 Primary Facility 2017-02-14 Routine/Complete Inspection No Violations Noted On 2/14/2017, WQS Brian MacQuarrie onsite at unconventional well site. Act 9 sign maintained at site entrance. Erosion and Sedimentation Plan in site mailbox. Stimulation activities concluded on Four wells. Equipment moving to B8 well site. Production tanks ( two 400 bbl capacity) installed within stainless steel containment structure. AST setup onsite which contains impaired water used for stimulation activities. Secondary containment maintained onsite. Freshwater impoundment maintained and fenced in. Erosion and Sedimentation Best Management Practices installed and maintained. Site stabilized in previously disturbed areas with vegetative growth. No apparent E/S issues.
2579569 Primary Facility 2017-04-06 Routine/Complete Inspection No Violations Noted On 4/6/2017, WQS Brian MacQuarrie onsite at unconventional well site. Act 9 sign maintained at site entrance. Erosion and Sedimentation Plan in site mailbox. Four wells in production. Production tanks ( two 400 bbl capacity) installed within stainless steel containment structure. AST setup onsite which contains impaired water used for stimulation activities. Secondary containment maintained onsite. Freshwater impoundment maintained and fenced in. Erosion and Sedimentation Best Management Practices installed and maintained. Site stabilized in previously disturbed areas with vegetative growth. No apparent E/S issues.
2596958 Primary Facility 2017-05-24 Routine/Complete Inspection No Violations Noted On 5/24/2017, WQS Brian MacQuarrie onsite at unconventional well site. Act 9 sign maintained at site entrance. Erosion and Sedimentation Plan in site mailbox. Four wells in production. Production tanks ( two 400 bbl capacity) installed within stainless steel containment structure. AST setup onsite which contains impaired water used for stimulation activities. Secondary containment setup around frac tank. Freshwater impoundment maintained and fenced in. Erosion and Sedimentation Best Management Practices installed and maintained. Site stabilized in previously disturbed areas with vegetative growth. No apparent E/S issues.
2624782 Primary Facility 2017-08-11 Routine/Complete Inspection No Violations Noted On 8/11/2017, WQS Brian MacQuarrie onsite to conduct inspection of unconventional well site. Four wells in production. Freshwater impoundment maintained, lined and fenced in. Vegetative cover well established in previously disturbed areas. Erosion and Sedimentation best management practices maintained.
2646728 Primary Facility 2017-10-11 Routine/Partial Inspection No Violations Noted This well and the pad are in good condition.
2666312 Primary Facility 2017-12-01 Routine/Complete Inspection No Violations Noted Site had been constructed as outlined in the E&S plan contained within the ESCGP. All site and access road erosion controls had been implemented and properly maintained. There was no observed accelerated erosion or sedimentation in relation to the site or access road. All disturbed areas had been stabilized with vegetation attaining 70% uniform vegetative cover. Well appeared to be equipped for production. Two production fluid tanks were located onsite within containment. Both the tanks and containment appeared to be in sound condition. Well development impoundment was located onsite and it was holding freshwater with significant algae growth.
2684134 Primary Facility 2018-01-18 Routine/Complete Inspection No Violations Noted Site had been constructed as outlined within the E&S Plan contained within the ESCGP. Evaluation of erosion control functionality and maintenance was not feasible due to snow and ice conditions. Well appeared to be equipped for production. Two brine tanks were located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. Well development impoundment located onsite and it was observed to contain frozen fluids and snow.
2756202 Primary Facility 2018-07-26 Routine/Complete Inspection No Violations Noted This well has been well maintained. The pad is in good condition.
2853876 Primary Facility 2019-03-14 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Brine tanks within secondary containment and appear structurally sound. GPUs within secondary containment. No E&S issues.

For data sources see[8]