X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-007-20439

Well Details

Well ID: 37-007-20439
Loading map...
Country: United States
State: Pennsylvania
County: Beaver
Municipality: New Sewickley Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 151096
Farm/Lease Name: BEAVER PAD 5
License Status: Active
Spud Date: 2015-01-06
Permit Date: 2014-07-24
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.758839
Longitude: -80.217839

For data sources see[1][2][3]

Well History

Date Event
2014-07-24 New Permit Application
2015-01-07 Performed Spud Operation
2015-10-14 New Permit Application

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-04-04 2016-04-13 5,043 12,527,300 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water PennEnergy Resources Carrier/Base Fluid Water 7732-18-5 100 86.516 105,554,000.0
LEB 10X Weatherford Gel Breaker Ethylene Glycol 107-21-1 40 0.00001235 15.068
Scale Hib A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00644019 7857.39
Hydrochloric Acid (7.5%) Axiall Acidizing Hydrogen Chloride 7647-01-0 40 0.855016 1,043,170.0
Unihib G GeoSafe Acid Corrosion Inhibitor Acetophenone 98-86-2 1 0.00000706 8.615
Ethoxylated Alcohol 68002-97-1 35 0.000247127 301.509
Glycol Ether 112-34-5 60 0.000423647 516.873
Thiourea 62-56-6 1 0.00000706 8.615
Methanol 67-56-1 5 0.00003530 43.073
Formaldehyde 50-00-0 1 0.00000706 8.615
EC6116A Nalco Biocide Polyethylene Glycol 25322-68-3 60 0.013039 15908.2
Dibromoacetonitrile 3252-43-5 5 0.00108658 1325.69
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00651948 7954.12
WGA-3 PfP Technology Water Viscosifier Guar Gum 9000-30-0 100 0.00118847 1450
Unislik ST50 CESI Friction Reducer Petroleum Distillates, Hydrotreated Light 64742-47-8 30 0.0230297 28097.5
Sand (Proppant) Sargent Proppant Silica 14808-60-7 99.9 11.2133 13,680,900.0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 PENNENERGY RESOURCES LLC 0.00 0 0.00 0 0.00 0
2016 PENNENERGY RESOURCES LLC 593,632.00 163 0.00 0 10,463.00 163
2017 PENNENERGY RESOURCES LLC 591,324.00 265 0.00 0 7,206.00 265
2018 PENNENERGY RESOURCES LLC 626,130.00 355 0.00 0 5,977.00 355
2019 PENNENERGY RESOURCES LLC 521,465.00 355 0.00 0 4,161.00 355

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 PENNENERGY RESOURCES LLC Drill Cuttings 838.87 Tons LANDFILL CID # 28726
2016 PENNENERGY RESOURCES LLC Fracturing Fluid Waste 30.50 Tons LANDFILL CID # 28726
2016 PENNENERGY RESOURCES LLC Produced Fluid 10,326.71 Bbl INJECTION DISPOSAL WELL 34-155-22403
2016 PENNENERGY RESOURCES LLC Produced Fluid 3,344.40 Bbl INJECTION DISPOSAL WELL 34-155-23795
2016 PENNENERGY RESOURCES LLC Produced Fluid 906.67 Bbl INJECTION DISPOSAL WELL 34-155-23223
2016 PENNENERGY RESOURCES LLC Produced Fluid 12,898.74 Bbl INJECTION DISPOSAL WELL 34-155-23196
2016 PENNENERGY RESOURCES LLC Produced Fluid 412.81 Bbl INJECTION DISPOSAL WELL 34-155-21893
2016 PENNENERGY RESOURCES LLC Produced Fluid 40,969.17 Bbl REUSE OTHER THAN ROAD SPREADING
2017 PENNENERGY RESOURCES LLC Produced Fluid 25.00 Bbl CENT WASTE TRT FAC NPDES EPA ID: 748-163
2017 PENNENERGY RESOURCES LLC 8.67 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2017 PENNENERGY RESOURCES LLC Servicing Fluid 8.67 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2017 PENNENERGY RESOURCES LLC Produced Fluid 242.87 Bbl INJECTION DISPOSAL WELL 34-155-23223
2017 PENNENERGY RESOURCES LLC 242.87 Bbl INJECTION DISPOSAL WELL 34-155-23223
2017 PENNENERGY RESOURCES LLC Produced Fluid 6,188.99 Bbl REUSE (AT WELL PAD)
2017 PENNENERGY RESOURCES LLC Produced Fluid 25.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2017 PENNENERGY RESOURCES LLC 10,492.32 Bbl REUSE (AT WELL PAD)
2017 PENNENERGY RESOURCES LLC Produced Fluid 189.74 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 PENNENERGY RESOURCES LLC 189.74 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Produced Fluid 5,609.43 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Produced Fluid 27.50 Bbl INJECTION DISPOSAL WELL 34-155-22403
2019 PENNENERGY RESOURCES LLC Produced Fluid 69.28 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 PENNENERGY RESOURCES LLC Produced Fluid 40.17 Bbl INJECTION DISPOSAL WELL 34-155-22403
2019 PENNENERGY RESOURCES LLC Produced Fluid 70.34 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Produced Fluid 2,678.70 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Produced Fluid 168.81 Bbl INJECTION DISPOSAL WELL 34-155-23196

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2305074 Primary Facility 2014-09-05 Preoperation Inspection No Violations Noted This preoperational inspection satisfies operator's obligation as outlined under Title 58 , Ch 32 § 3258 a. 1.
2340675 Primary Facility 2015-01-06 Drilling/Alteration No Violations Noted A TRACK RIG IS DRILLING AND INSTALLING 40' OF 16" CONDUCTOR.
2342034 Primary Facility 2015-01-06 Drilling/Alteration No Violations Noted A TRACK RIG IS INSTALLING 40' OF 16" CONDUCTOR. THE SITE IS OK.
2381754 Primary Facility 2015-06-19 Routine/Complete Inspection No Violations Noted
2381933 Primary Facility 2015-06-23 Drilling/Alteration No Violations Noted TOP HOLE DRILLING IS COMPLETE AT 2,330'. HIGHLANDS 9 HAS MOVED OFF THE PAD.
2390986 Primary Facility 2015-07-08 Drilling/Alteration No Violations Noted TOP HOLE IS DONE. THE RIG IS GONE. THE PAD IS COVERED.
2418386 Primary Facility 2015-10-01 Drilling/Alteration No Violations Noted TOP HOLE DRILLING IS COMPLETE. THE AREA AROUND THE WELL IS COVERED.
2426775 Primary Facility 2015-11-10 Drilling/Alteration No Violations Noted PATTERSON 259 IS BEING BUILT OVER THE 4H WELL. THE SITE IS IN GOOD CONDITION.
2426818 Primary Facility 2015-11-16 Drilling/Alteration No Violations Noted patterson 259 is set up and ready to begin drilling the bottom section of this well.
2428034 Primary Facility 2015-11-20 Routine/Complete Inspection No Violations Noted
2434207 Primary Facility 2015-11-18 Drilling/Alteration No Violations Noted PATTERSON 259 IS DRILLING THE BOTTOM SECTION OF THIS WELL AT 3,913'.
2434229 Primary Facility 2015-11-24 Drilling/Alteration No Violations Noted RIG IS PULLING DRILL RODS THEN WILL RUN 5.5" CASING.
2434247 Primary Facility 2015-12-02 Drilling/Alteration No Violations Noted PATTERSON 259 DRILLED THIS WELL TO 11,560'.
2436899 Primary Facility 2015-12-29 Routine/Complete Inspection No Violations Noted
2449328 Primary Facility 2016-01-11 Drilling/Alteration No Violations Noted THE HORIZONTAL PORTION OF THIS WELL IS COMPLETE, AND THE RIG IS GONE. THE WELL IS COVERED. THE SITE IS IN GOOD CONDITION.
2467250 Primary Facility 2016-03-22 Routine/Complete Inspection No Violations Noted
2468823 Primary Facility 2016-03-23 Drilling/Alteration No Violations Noted A BOND LOG WAS RUN. CASING PRESSURE TESTING ON THE SITE IS ALMOST COMPLETE.

THE SITE IS IN GOOD CONDITION.

2468832 Primary Facility 2016-03-15 Drilling/Alteration No Violations Noted THIS WELL IS DRILLED BUT NOT FRACED. THE WELL IS SHUT IN WAITING FOR FRAC JOB.

THE SITE IS IN GOOD CONDITION.

2469251 Primary Facility 2016-03-29 Drilling/Alteration No Violations Noted A BOND LOG WAS DONE AND CASING PRESSURE TEST IS COMPLETE.

CUD ENERGY IS ONSITE PREPARING WELLS FOR FRACING.

2477615 Primary Facility 2016-04-20 Drilling/Alteration No Violations Noted THHE 4H IS FRACED AND FLOWBACK OPS HAVE BEGUN.

THE WORK AREA IS COVERED.

2478920 Primary Facility 2016-04-22 Routine/Complete Inspection No Violations Noted
2480612 Primary Facility 2016-04-06 Drilling/Alteration No Violations Noted 4H FRACING OPERATIONS HAVE BEGUN. 15 OF 36 STAGES HAVE BEEN FRACED.

THE SITE IS IN GOOD CONDITION.

2481823 Primary Facility 2016-04-26 Drilling/Alteration No Violations Noted THIS WELL IS PRODUCING WHILE ON FLOW BACK.

THE SITE IS IN GOOD CONDITION.

2483908 Primary Facility 2016-05-03 Drilling/Alteration No Violations Noted 4H FLOW BACK IS COMPLETE. THE WELL IS PRODUCING.

THE SITE IS IN GOOD CONDITION.

2501660 Primary Facility 2016-07-11 Routine/Complete Inspection No Violations Noted
2521482 Primary Facility 2016-09-21 Routine/Complete Inspection No Violations Noted
2542662 Primary Facility 2016-11-17 Routine/Complete Inspection No Violations Noted
2559986 Primary Facility 2017-02-09 Routine/Complete Inspection No Violations Noted On 2/9/17, WQS Brian MacQuarrie onsite at unconventional well site. Act 9 sign in place. Erosion and Sedimentation Plan in mailbox. Four wells in production. Two four hundred bbl tanks installed within stainless steel secondary containment. Temporary AST setup onsite used for stimulation of wells. Freshwater impoundment fenced in. Erosion and Sedimentation Best Management Practices installed and maintained including compost filter sock and sediment trap. Site stabilized with vegetative growth. No apparent E/S issues. Light snow covering on ground during inspection.
2564558 Primary Facility 2017-02-24 Routine/Complete Inspection No Violations Noted On 2/24/2017, WQS Brian MacQuarrie onsite at unconventional well site. Act 9 sign in place. Erosion and Sedimentation Plan in mailbox. Four wells properly tagged and in production. Two four hundred bbl tanks installed within stainless steel secondary containment. Temporary AST containing impaired water removed from site. Four clamshell and one frac tank onsite within secondary containment. Two rolloffs containing residual waste ( plastic liners and hdpe pipe) awaiting disposal. Secondary containment installed around well heads removed. Freshwater impoundment fenced in. Erosion and Sedimentation Best Management Practices installed and maintained including compost filter sock and sediment trap. Site stabilized with vegetative growth. No apparent E/S issues.
2633398 Primary Facility 2017-09-07 Routine/Complete Inspection No Violations Noted On 9/07/2017, WQS Brian MacQuarrie onsite at unconventional well site. Four wells in production. Truck onsite transferring fluids from production tanks. Two 400 bbl tanks in containment. Erosion and Sedimentation best management practices installed and maintained including sediment trap. Majority of site well vegetated. Small area along access road needs to be re-seeded. No apparent E/S issues.
2667470 Primary Facility 2017-12-05 Routine/Complete Inspection No Violations Noted Site had been constructed as outlined in the E&S plan contained within the ESCGP. All site and access road erosion controls had been implemented and properly maintained. There was no observed accelerated erosion or sedimentation in relation to the site or access road. All disturbed areas had been stabilized with vegetation attaining 70% uniform vegetative cover. The well appeared to be equipped for production. Two brine tanks located onsite within containment. Both the tanks and the containment appeared to be in sound condition. Well development impoundment located onsite and it contained what appeared to contain freshwater.
2687684 Primary Facility 2018-01-29 Routine/Complete Inspection No Violations Noted Site and access road had been constructed in accordance with the ESCGP. All site and access road erosion controls had been implemented and maintained properly. All disturbed slopes and soil stockpiles had been stabilized with vegetation. There was no observed accelerated erosion or sedimentation in relation to the site or access road. There was an Act 9 sign located onsite in accordance with 25 Pa Code Chapter 78a.55(i). Well appeared to be equipped for production. Two brine tanks were located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. Well development impoundment located onsite and it appeared to contain withdrawn water and accumulated precipitation.
2768218 Primary Facility 2018-08-28 Routine/Complete Inspection No Violations Noted This well and all other equipment on the pad are in good condition.

For data sources see[8]

References