If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-007-20490 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.758871,"lon":-80.217811,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Beaver | |
Municipality: New Sewickley Township | |
Operator Name: PENNENERGY RESOURCES LLC | |
Well Pad ID: | |
Farm/Lease Name: BEAVER PAD 5 5H UD | |
License Status: | |
Spud Date: | |
Permit Date: 2016-10-13 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.758871 | |
Longitude: -80.217811 |
Date | Event |
---|---|
2016-10-13 | New Permit Application |
2017-12-13 | Permit Renewal Application |
For data sources see[4]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2633408 | Primary Facility | 2017-09-07 | Routine/Complete Inspection | No Violations Noted | On 9/07/2017, WQS Brian MacQuarrie onsite at unconventional well site. Four wells in production. Truck onsite transferring fluids from production tanks. Two 400 bbl tanks in containment. Erosion and Sedimentation best management practices installed and maintained including sediment trap. Majority of site well vegetated. Small area along access road needs to be re-seeded. No apparent E/S issues. |
For data sources see[5]