X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-007-20495

Well Details

Well ID: 37-007-20495
Loading map...
Country: United States
State: Pennsylvania
County: Beaver
Municipality: New Sewickley Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 153852
Farm/Lease Name: PER B39
License Status:
Spud Date:
Permit Date: 2016-12-13
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.695122
Longitude: -80.214289

For data sources see[1][2][3]

Well History

Date Event
2016-12-13 New Permit Application
2017-02-22 Performed Spud Operation
2017-06-01 MOD

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-04-09 2018-05-04 5,231 16,520,500 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 CI-9100G CWS Corrosion Inhibitor Listed Below Green Line Listed Below 0 0 0
Other Chemical(s) Listed Above See Trade Name(s) List Listed Below
DWP-901 CWS Breaker Listed Below Green Line Listed Below 0 0 0
Sand (Proppant) CWS Propping Agent Listed Below Green Line Listed Below 0 0 0
Hydrochloric Acid CWS Clean Perforations Listed Below Green Line Listed Below 0 0 0
Water Supplied by Operator Base Fluid Water 7732-18-5 63 89.3138 0
Ethoxylated alcohols Proprietary 10 0.00015 237.77
Tar bases, quinolone derivs 68513-87-1 1 0.00002000 23.78
Formic Acid 64-18-6 10 0.00015 237.77
Tar bases, quinolone derivs, benzyl chloride-quatenized 72480-70-7 10 0.00015 237.77
Calcite 471-34-1 1 0.09487 146353
Apatite 64476-38-6 0.1 0.00949 14635.3
Diethylene glycol (mono) methyl ether 34590-94-8 20 0.00031 475.53
Cinnamaldehyde 104-55-2 10 0.00015 237.77
Goethite 1310-14-1 0.1 0.00949 14635.3
Ammonium Persulfate 7727-54-0 100 0.00039 604
Hydrochloric acid 7647-01-0 37 1.07379 1,656,490.0
Crystalline silica (Quartz) 14808-60-7 100 9.48702 14,635,300.0
Ethylene glycol 107-21-1 40 0.00062 951.06
Isopropanol 67-63-0 5 0.00008000 118.88
Biotite 1302-27-8 0.1 0.00949 14635.3
Diethylene glycol 111-46-6 1 0.00002000 23.78

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 PENNENERGY RESOURCES LLC 0.00 0 0.00 0 0.00 0
2018 PENNENERGY RESOURCES LLC 583,612.00 177 0.00 0 8,173.00 177
2019 PENNENERGY RESOURCES LLC 1,027,683.00 349 0.00 0 14,171.00 349

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 PENNENERGY RESOURCES LLC Other Oil & Gas Wastes 139.30 Bbl INJECTION DISPOSAL WELL 34-155-23223
2017 PENNENERGY RESOURCES LLC 194.37 Bbl REUSE (AT WELL PAD)
2017 PENNENERGY RESOURCES LLC Other Oil & Gas Wastes 255.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 PENNENERGY RESOURCES LLC 139.30 Bbl INJECTION DISPOSAL WELL 34-155-23223
2017 PENNENERGY RESOURCES LLC 255.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 PENNENERGY RESOURCES LLC 831.72 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2017 PENNENERGY RESOURCES LLC Produced Fluid 194.37 Bbl REUSE (AT WELL PAD)
2017 PENNENERGY RESOURCES LLC Drill Cuttings 831.72 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Drill Cuttings 0.33 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Synthetic Liner Materials 4.61 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Waste Water Treatment Sludge 11.20 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 PENNENERGY RESOURCES LLC Produced Fluid 6,323.44 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Produced Fluid 6.72 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 8.75 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 PENNENERGY RESOURCES LLC Produced Fluid 65.50 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 PENNENERGY RESOURCES LLC Produced Fluid 28.25 Bbl INJECTION DISPOSAL WELL 34-155-22403
2018 PENNENERGY RESOURCES LLC Produced Fluid 30.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2018 PENNENERGY RESOURCES LLC Produced Fluid 30.48 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Produced Fluid 37.50 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Servicing Fluid 12.50 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Produced Fluid 121.62 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 PENNENERGY RESOURCES LLC Produced Fluid 30.25 Bbl INJECTION DISPOSAL WELL 34-155-21893
2019 PENNENERGY RESOURCES LLC Produced Fluid 492.26 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Produced Fluid 5,864.93 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Produced Fluid 237.41 Bbl INJECTION DISPOSAL WELL 34-155-23196
2019 PENNENERGY RESOURCES LLC Produced Fluid 151.83 Bbl INJECTION DISPOSAL WELL 34-155-23795

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2564528 Primary Facility 2017-02-22 Drilling/Alteration No Violations Noted A TRACK MOUNTED AUGER RIG IS DRILLING AND INSTALLING THE CELLAR AND 40' OF 16" CONDUCTOR CASING.
2570646 Primary Facility 2017-03-06 Drilling/Alteration No Violations Noted HIGHLANDS RIG 9 DRILLED TO 619'. THE RIG IS RUNNING 609' OF 113/4" CASING.

THE SITE IS IN GOOD CONDITION.

2570691 Primary Facility 2017-03-08 Drilling/Alteration No Violations Noted HIGHLANDS RIG 9 DRILLED TOP HOLE TO 2,501'. AFTER PULLING DRILL PIPE THEY PLAN TO RUN 2,491' OF 85/8" CASING.

THE SITE IS IN GOOD CONDITION.

2570886 Primary Facility 2017-03-13 Routine/Complete Inspection No Violations Noted On 03/13/2017, WQS Brian MacQuarrie onsite at unconventional well site. Act 9 sign installed at site entrance. The approximate 1,000 foot access road, well pad and 5.0 million gallon freshwater impoundment (excavated-not lined yet) installed and maintained. Highlands Drill Rig #9 - Air Rig onsite drilling top portion of four wells. Secondary containment set up on well pad. Sound wall under construction. Erosion and Sedimentation Best Management Practices installed according to the Erosion and Sedimentation Plan. Disturbed areas temporarily stabilized with seed and mulch. No apparent E/S issues. Light snow covering on ground.
2612477 Primary Facility 2017-07-06 Routine/Complete Inspection No Violations Noted On 07/03/2017, WQS Brian MacQuarrie onsite at unconventional well site. Act 9 sign installed at site entrance. The approximate 1,000 foot access road, well pad and 5.0 million gallon freshwater impoundment (excavated-not lined yet) installed and maintained. Patterson Drill Rig #259 onsite drilling remaining section of four wells. Secondary containment set up on well pad. Sound wall installed. Erosion and Sedimentation Best Management Practices installed according to the Erosion and Sedimentation Plan. Disturbed areas exhibit established vegetative growth. No apparent E/S issues.
2615369 Primary Facility 2017-07-10 Drilling/Alteration No Violations Noted PATTERSON 259 IS DRILLING AT 3,979'. KOP WILL BE AT 4,793'.

THE SITE IS IN GOOD CONDITION.

2624697 Primary Facility 2017-08-03 Routine/Complete Inspection No Violations Noted On 8/3/2017, WQS Brian MacQuarrie onsite to conduct inspection of unconventional well site. Four wells drilled. Production equipment installed, including two 400 bbl production tanks in secondary containment structure and four gas processing units. Freshwater impoundment lined and fenced in. Vegetative cover well established in previously disturbed areas.
2633456 Primary Facility 2017-09-07 Routine/Complete Inspection No Violations Noted On 09/07/2017, WQS Brian MacQuarrie onsite to conduct inspection of unconventional well site. Four wells drilled. Production equipment installed, including two 400 bbl production tanks in secondary containment structure and four gas processing units. Freshwater impoundment lined and fenced in. Erosion and Sedimentation best management practices installed and maintained. Vegetative cover well established in previously disturbed areas. No apparent E/S issues.
2661799 Primary Facility 2017-11-17 Routine/Complete Inspection No Violations Noted Site had been constructed as outlined in the E&S plan contained within the ESCGP. All site and access road erosion controls had been implemented and properly maintained. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Brine tanks located onsite within containment. Both the tanks and containment appeared to be in sound condition. Large AST constructed and located onsite to hold flowback fluid. Secondary containment was also observed onsite.
2676535 Primary Facility 2018-01-02 Routine/Complete Inspection No Violations Noted Site had been constructed as outlined in the E&S plan contained within the ESCGP. All site and access road erosion controls had been properly maintained. Wells were in the process of being equipped for production. Two produced fluids located onsite within containment. Both the tanks and containment appeared to be in sound condition. Secondary containment was located onsite in addition to a constructed AST. There was well development impoundment onsite containing largely frozen fluids.
2699808 Primary Facility 2018-03-01 Routine/Complete Inspection No Violations Noted Site and access road had been constructed in accordance with the ESCGP. All site and access road erosion controls had been implemented and maintained properly. All disturbed slopes and soil stockpiles had been stabilized with vegetation. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Constructed AST was located onsite. Well development impoundment was located onsite. Secondary containment was onsite. Six mobile tanks were located within tertiary containment. Site appeared to have been prepped and set-up for flowback operations. There was an Act 9 sign located onsite in accordance with 25 Pa Code Chapter 78a.55(i).
2763685 Primary Facility 2018-08-15 Routine/Complete Inspection No Violations Noted This well is in good condition and producing. The site is in good condition.
2842157 Primary Facility 2019-02-19 Complaint Inspection No Violations Noted At the time of inspection well equipped for production. Brine tank within secondary containment and appears structurally sound. GPU located on secondary containment. No E&S issues.
2851086 Primary Facility 2019-03-11 Routine/Complete Inspection No Violations Noted This well is in good condition and producing.

For data sources see[8]

References