37-007-20508

Well Details

Well ID: 37-007-20508
Loading map...
Country: United States
State: Pennsylvania
County: Beaver
Municipality: New Sewickley Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 154382
Farm/Lease Name: PER B24 2H
License Status:
Spud Date:
Permit Date: 2017-09-22
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.692583
Longitude: -80.197281

For data sources see[1][2][3]

Well History

Date Event
2017-09-22 New Permit Application
2017-11-09 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-06-07 2018-06-16 5,488 13,765,400 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Customer Base Fluid and Mix Water Listed Below
Calcite 471-34-1 1 0.111284 147884
Biotite 1302-27-8 0.1 0.0111284 14788.4
Tar bases, quinolone derivs, benzyl chloride-quatenized 72480-70-7 10 0.000145027 192.724
Cinnamaldehyde 104-55-2 10 0.000145027 192.724
Alcohol Alkoxylates PROPRIETARY 5 0.00267592 3555.97
Water 7732-18-5 100 86.4431 114,872,000.0
Ammonium Persulfate 7727-54-0 100 0.000382277 508
Aliphatic Hydrocarbon PROPRIETARY 30 0.0160555 21335.8
Sodium Phosphate, Tribasic 7601-54-9 5 0.000893618 1187.51
Isopropanol 67-63-0 5 0.00007251 96.362
Substituted alkylamine PROPRIETARY 1 0.00044785 595.139
Tar bases, quinolone derivs 68513-87-1 1 0.00001450 19.272
Formic Acid 64-18-6 10 0.000145027 192.724
Apatite 64476-38-6 0.1 0.0111284 14788.4
Ethylene glycol 107-21-1 40 0.00147373 1958.41
Isopropanol 67-63-0 5 0.00007251 96.362
Glutaraldehyde 111-30-8 30 0.00519849 6908.16
Tar bases, quinolone derivs 68513-87-1 1 0.00001450 19.272
Ethoxylated alcohols PROPRIETARY 10 0.000145027 192.724
Glutaraldehyde 111-30-8 30 0.00519849 6908.16
Diethylene glycol (mono) methyl ether 34590-94-8 20 0.000290054 385.447
Crystalline silica (Quartz) 14808-60-7 100 11.1284 14,788,300.0
Calcite 471-34-1 1 0.111284 147884
Goethite 1310-14-1 0.1 0.0111284 14788.4
Hydrotreated Light Distillate 64742-47-8 30 0.0134355 17854.2
Diethylene glycol 111-46-6 1 0.00001450 19.272
Amine Triphosphate PROPRIETARY 30 0.00536171 7125.06
Substituted alkylamine PROPRIETARY 1 0.00044785 595.139
Diethylene glycol (mono) methyl ether 34590-94-8 20 0.000290054 385.447
Amine Triphosphate PROPRIETARY 30 0.00536171 7125.06
Apatite 64476-38-6 0.1 0.0111284 14788.4
Biotite 1302-27-8 0.1 0.0111284 14788.4
Goethite 1310-14-1 0.1 0.0111284 14788.4
Hydrochloric acid 7647-01-0 37 0.848472 1,127,520.0
Formic Acid 64-18-6 10 0.000145027 192.724
Sodium Phosphate, Tribasic 7601-54-9 5 0.000893618 1187.51
Crystalline silica (Quartz) 14808-60-7 100 11.1284 14,788,300.0
Hydrotreated Light Distillate 64742-47-8 30 0.0134355 17854.2
Hydrochloric acid 7647-01-0 37 0.848472 1,127,520.0
Aliphatic Hydrocarbon PROPRIETARY 30 0.0160555 21335.8
Ammonium Persulfate 7727-54-0 100 0.000382277 508
Ethylene glycol 107-21-1 40 0.00147373 1958.41
Alcohol Alkoxylates PROPRIETARY 5 0.00267592 3555.97
Tar bases, quinolone derivs, benzyl chloride-quatenized 72480-70-7 10 0.000145027 192.724
Diethylene glycol 111-46-6 1 0.00001450 19.272
Ethoxylated alcohols PROPRIETARY 10 0.000145027 192.724
Cinnamaldehyde 104-55-2 10 0.000145027 192.724

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 PENNENERGY RESOURCES LLC 0.00 0 0.00 0 0.00 0
2018 PENNENERGY RESOURCES LLC 578,220.00 130 0.00 0 2,314.00 130
2019 PENNENERGY RESOURCES LLC 881,117.00 360 0.00 0 1,880.00 360

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 PENNENERGY RESOURCES LLC Drilling Fluid Waste 295.83 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 PENNENERGY RESOURCES LLC Drilling Fluid Waste 358.50 Bbl INJECTION DISPOSAL WELL 34-155-23223
2017 PENNENERGY RESOURCES LLC Produced Fluid 605.00 Bbl REUSE (AT WELL PAD)
2017 PENNENERGY RESOURCES LLC Drill Cuttings 241.23 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Drill Cuttings 497.18 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Other Oil & Gas Wastes 12.83 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Produced Fluid 17,581.60 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Produced Fluid 1.11 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 448.50 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 PENNENERGY RESOURCES LLC Produced Fluid 40.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2018 PENNENERGY RESOURCES LLC Produced Fluid 144.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 689.84 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Produced Fluid 35.21 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Produced Fluid 147.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Other Oil & Gas Wastes 5.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 117.19 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Servicing Fluid 16.82 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Produced Fluid 155.94 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 PENNENERGY RESOURCES LLC Produced Fluid 76.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2019 PENNENERGY RESOURCES LLC Produced Fluid 1,074.56 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Produced Fluid 7,841.52 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Synthetic Liner Materials 5.31 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Produced Fluid 1,852.35 Bbl INJECTION DISPOSAL WELL 34-155-23196
2019 PENNENERGY RESOURCES LLC Produced Fluid 77.76 Bbl INJECTION DISPOSAL WELL 34-155-23795
2019 PENNENERGY RESOURCES LLC Produced Fluid 17.73 Bbl INJECTION DISPOSAL WELL 34-155-22403
2019 PENNENERGY RESOURCES LLC Waste Water Treatment Sludge 4.10 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2641095 Primary Facility 2017-09-27 Routine/Complete Inspection No Violations Noted On 9/27/2017, WQS Brian MacQuarrie onsite of B24 well site currently under construction. The site sign and mailbox are installed at the site entrance. Well permits and Erosion and Sedimentation Plan inside site mailbox. The access road, raingardens and the temporary Sedimentation basin are installed. Perimeter compost filter sock installed. Crews onsite stoning pad and constructing impoundment. Disturbed areas stabilized with seed and mulch. No apparent E/S issues.
2659805 Primary Facility 2017-11-14 Drilling/Alteration No Violations Noted 40' of 16" conductor was cemented in a 20" hole. The cellar 8'x8'.

The site is in good condition.

2659964 Primary Facility 2017-11-14 Routine/Complete Inspection No Violations Noted Site had been constructed as outlined in the E&S plan and the construction sequence. Site had been temporarily stabilized and the vegetation had begun to emerge and grow. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Drilling had been commenced but was not ongoing at the time of the inspection. Work was underway to implement the secondary containment after completion of setting the conductor pipe. Additionally work was underway to install fencing around the freshwater impoundment, which is currently unlined.
2663164 Primary Facility 2017-11-21 Drilling/Alteration No Violations Noted Conductor is set at 40' and ready for rig. No violations observed. NOVIO
2664992 Primary Facility 2017-11-29 Drilling/Alteration No Violations Noted Well drilled to 2515'. Rig currently drilling 3H. No violations observed. NOVIO
2670345 Primary Facility 2017-12-13 Routine/Complete Inspection No Violations Noted Site had been constructed as outlined in the E&S plan contained within the ESCGP. All erosion controls had been properly maintained. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Drilling had commenced but was not ongoing. Top-hole rig and associated equipment was in the process of being moved offsite. Freshwater impoundment construction had been completed but the impoundment had not been lined.
2691199 Primary Facility 2018-02-02 Routine/Complete Inspection No Violations Noted Site and access road had been constructed in accordance with the ESCGP. All site and access road erosion controls had been implemented and maintained properly. There was no observed accelerated erosion or sedimentation in relation to the site or access road, however snow accumulation made an evaluation of the erosion controls limited. Earth disturbance and work related to ESX17-007-0006 had commenced. A portion of this pipeline overlaps with the well site and its erosion controls. In the area of overlap the pipeline project's erosion controls are downslope and take precedence over the site's erosion controls. Secondary containment was located onsite, drilling had commenced but was not ongoing. Well development impoundment construction had been completed. Well development impoundment had been lined and put into service. There was an Act 9 sign located onsite in accordance with 25 Pa Code Chapter 78a.55(i).
2701612 Primary Facility 2018-03-06 Drilling/Alteration No Violations Noted 2H drilling is complete at 11993'. The 5.5" production casing is cemented to the surface.
2701633 Primary Facility 2018-02-28 Drilling/Alteration No Violations Noted Patterson 261 began drilling bottom hole at 2535'. They are now drilling at 10628'.
2708056 Primary Facility 2018-03-21 Routine/Complete Inspection No Violations Noted Drilling was ongoing at the time of the inspection for well 007-20510 B24-4H. Secondary containment located onsite and drilling fluid containers located onsite were within tertiary containment. Well development impoundment located onsite and it appeared to be unlined and not in use. Site and access road had been constructed in accordance with the ESCGP. All site and access road erosion controls had been implemented and maintained properly. There was an Act 9 sign located onsite in accordance with 25 Pa Code Chapter 78a.55(i).
2757743 Primary Facility 2018-07-23 Routine/Complete Inspection No Violations Noted At time of inspection, frac crew and equipment currently on-site.
2853558 Primary Facility 2019-03-14 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Brine tanks within secondary containment and appear structurally sound. GPUs within secondary containment. No E&S issues.

For data sources see[8]