X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-007-20510

Well Details

Well ID: 37-007-20510
Loading map...
Country: United States
State: Pennsylvania
County: Beaver
Municipality: New Sewickley Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: 154382
Farm/Lease Name: PER B24 4H
License Status:
Spud Date:
Permit Date: 2017-09-22
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.692475
Longitude: -80.1973

For data sources see[1][2][3]

Well History

Date Event
2017-09-22 New Permit Application
2017-11-09 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-06-18 2018-06-26 5,265 14,162,100 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Customer Base Fluid and Mix Water Listed Below
Crystalline silica (Quartz) 14808-60-7 100 10.2159 13,816,400.0
Diethylene glycol 111-46-6 1 0.00001295 17.52
Tar bases, quinolone derivs, benzyl chloride-quatenized 72480-70-7 10 0.000129547 175.203
Isopropanol 67-63-0 5 0.00006477 87.602
Ammonium Persulfate 7727-54-0 100 0.000388189 525
Amine Triphosphate PROPRIETARY 30 0.00537312 7266.78
Glutaraldehyde 111-30-8 30 0.0052179 7056.87
Apatite 64476-38-6 0.1 0.0102159 13816.4
Cinnamaldehyde 104-55-2 10 0.000129547 175.203
Biotite 1302-27-8 0.1 0.0102159 13816.4
Formic Acid 64-18-6 10 0.000129547 175.203
Diethylene glycol (mono) methyl ether 34590-94-8 20 0.000259093 350.407
Ammonium Persulfate 7727-54-0 100 0.000388189 525
Goethite 1310-14-1 0.1 0.0102159 13816.4
Cinnamaldehyde 104-55-2 10 0.000129547 175.203
Isopropanol 67-63-0 5 0.00006477 87.602
Formic Acid 64-18-6 10 0.000129547 175.203
Apatite 64476-38-6 0.1 0.0102159 13816.4
Sodium Phosphate, Tribasic 7601-54-9 5 0.000895519 1211.13
Goethite 1310-14-1 0.1 0.0102159 13816.4
Tar bases, quinolone derivs 68513-87-1 1 0.00001295 17.52
Diethylene glycol (mono) methyl ether 34590-94-8 20 0.000259093 350.407
Hydrotreated Light Distillate 64742-47-8 30 0.0131309 17758.6
Amine Triphosphate PROPRIETARY 30 0.00537312 7266.78
Ethylene glycol 107-21-1 40 0.00141371 1911.94
Hydrotreated Light Distillate 64742-47-8 30 0.0131309 17758.6
Tar bases, quinolone derivs, benzyl chloride-quatenized 72480-70-7 10 0.000129547 175.203
Substituted alkylamine PROPRIETARY 1 0.000437696 591.954
Substituted alkylamine PROPRIETARY 1 0.000437696 591.954
Calcite 471-34-1 1 0.102159 138164
Ethoxylated alcohols PROPRIETARY 10 0.000129547 175.203
Hydrochloric acid 7647-01-0 37 0.840506 1,136,730.0
Calcite 471-34-1 1 0.102159 138164
Alcohol Alkoxylates PROPRIETARY 5 0.00233597 3159.24
Alcohol Alkoxylates PROPRIETARY 5 0.00233597 3159.24
Biotite 1302-27-8 0.1 0.0102159 13816.4
Ethylene glycol 107-21-1 40 0.00141371 1911.94
Glutaraldehyde 111-30-8 30 0.0052179 7056.87
Tar bases, quinolone derivs 68513-87-1 1 0.00001295 17.52
Aliphatic Hydrocarbon PROPRIETARY 30 0.0140158 18955.5
Aliphatic Hydrocarbon PROPRIETARY 30 0.0140158 18955.5
Sodium Phosphate, Tribasic 7601-54-9 5 0.000895519 1211.13
Crystalline silica (Quartz) 14808-60-7 100 10.2159 13,816,400.0
Water 7732-18-5 100 87.385 118,182,000.0
Hydrochloric acid 7647-01-0 37 0.840506 1,136,730.0
Ethoxylated alcohols PROPRIETARY 10 0.000129547 175.203
Diethylene glycol 111-46-6 1 0.00001295 17.52

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 PENNENERGY RESOURCES LLC 0.00 0 0.00 0 0.00 0
2018 PENNENERGY RESOURCES LLC 297,309.00 123 0.00 0 3,275.00 123
2019 PENNENERGY RESOURCES LLC 667,474.00 359 0.00 0 8,823.00 359

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 PENNENERGY RESOURCES LLC Drilling Fluid Waste 295.83 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 PENNENERGY RESOURCES LLC Drilling Fluid Waste 358.50 Bbl INJECTION DISPOSAL WELL 34-155-23223
2017 PENNENERGY RESOURCES LLC Produced Fluid 5.00 Bbl REUSE (AT WELL PAD)
2017 PENNENERGY RESOURCES LLC Drill Cuttings 247.14 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Drill Cuttings 525.76 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Other Oil & Gas Wastes 12.83 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Other Oil & Gas Wastes 5.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 PENNENERGY RESOURCES LLC Produced Fluid 9,035.30 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Produced Fluid 1.11 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 726.50 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 PENNENERGY RESOURCES LLC Produced Fluid 40.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2018 PENNENERGY RESOURCES LLC Produced Fluid 144.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 718.84 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Produced Fluid 35.21 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2018 PENNENERGY RESOURCES LLC Produced Fluid 147.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 PENNENERGY RESOURCES LLC Drilling Fluid Waste 117.65 Bbl REUSE (AT WELL PAD)
2018 PENNENERGY RESOURCES LLC Servicing Fluid 16.82 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Produced Fluid 129.87 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 PENNENERGY RESOURCES LLC Produced Fluid 60.04 Bbl INJECTION DISPOSAL WELL 34-155-21893
2019 PENNENERGY RESOURCES LLC Produced Fluid 327.71 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 PENNENERGY RESOURCES LLC Produced Fluid 5,750.21 Bbl REUSE (AT WELL PAD)
2019 PENNENERGY RESOURCES LLC Synthetic Liner Materials 4.18 Tons RESIDUAL WASTE PROCESSING FACILITY PAD085690592
2019 PENNENERGY RESOURCES LLC Produced Fluid 371.63 Bbl INJECTION DISPOSAL WELL 34-155-23196
2019 PENNENERGY RESOURCES LLC Produced Fluid 61.95 Bbl INJECTION DISPOSAL WELL 34-155-23795
2019 PENNENERGY RESOURCES LLC Produced Fluid 14.74 Bbl INJECTION DISPOSAL WELL 34-155-22403
2019 PENNENERGY RESOURCES LLC Waste Water Treatment Sludge 2.90 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2659810 Primary Facility 2017-11-14 Drilling/Alteration No Violations Noted 40' of 16" conductor was cemented in a 20" hole. The cellar 8'x8'.

The site is in good condition.

2659965 Primary Facility 2017-11-14 Routine/Complete Inspection No Violations Noted Site had been constructed as outlined in the E&S plan and the construction sequence. Site had been temporarily stabilized and the vegetation had begun to emerge and grow. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Drilling had been commenced but was not ongoing at the time of the inspection. Work was underway to implement the secondary containment after completion of setting the conductor pipe. Additionally work was underway to install fencing around the freshwater impoundment, which is currently unlined.
2663181 Primary Facility 2017-11-21 Drilling/Alteration No Violations Noted Conductor is set at 40' and ready for rig. No violations observed. NOVIO
2666757 Primary Facility 2017-12-04 Drilling/Alteration No Violations Noted Rig drilling 11" hole at 2441'. No violations observed. NOVIO
2670348 Primary Facility 2017-12-13 Routine/Complete Inspection No Violations Noted Site had been constructed as outlined in the E&S plan contained within the ESCGP. All erosion controls had been properly maintained. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Drilling had commenced but was not ongoing. Top-hole rig and associated equipment was in the process of being moved offsite. Freshwater impoundment construction had been completed but the impoundment had not been lined.
2691203 Primary Facility 2018-02-02 Routine/Complete Inspection No Violations Noted Site and access road had been constructed in accordance with the ESCGP. All site and access road erosion controls had been implemented and maintained properly. There was no observed accelerated erosion or sedimentation in relation to the site or access road, however snow accumulation made an evaluation of the erosion controls limited. Earth disturbance and work related to ESX17-007-0006 had commenced. A portion of this pipeline overlaps with the well site and its erosion controls. In the area of overlap the pipeline project's erosion controls are downslope and take precedence over the site's erosion controls. Secondary containment was located onsite, drilling had commenced but was not ongoing. Well development impoundment construction had been completed. Well development impoundment had been lined and put into service. There was an Act 9 sign located onsite in accordance with 25 Pa Code Chapter 78a.55(i).
2708050 Primary Facility 2018-03-21 Routine/Complete Inspection No Violations Noted Drilling was ongoing at the time of the inspection. Secondary containment located onsite and drilling fluid containers located onsite were within tertiary containment. Well development impoundment located onsite and it appeared to be unlined and not in use. Site and access road had been constructed in accordance with the ESCGP. All site and access road erosion controls had been implemented and maintained properly. There was an Act 9 sign located onsite in accordance with 25 Pa Code Chapter 78a.55(i).
2708083 Primary Facility 2018-03-21 Drilling/Alteration No Violations Noted Patterson 261 is drilling the bottom section of this well at 3,626'.
2708811 Primary Facility 2018-03-22 Drilling/Alteration No Violations Noted Rig drilling 7 7/8" hole at 4859', building curve. No violations noted. NOVIO
2711372 Primary Facility 2018-03-28 Drilling/Alteration No Violations Noted Patterson 261 drilled to a TD of 11,848' and ran 11,848' of 5.5" production casing. The production casing was cemented back to the surface.
 The rig has moved to the next boring.
2757755 Primary Facility 2018-07-23 Routine/Complete Inspection No Violations Noted At time of inspection, frac crew and equipment currently on-site.
2853564 Primary Facility 2019-03-14 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Brine tanks within secondary containment and appear structurally sound. GPUs within secondary containment. No E&S issues.

For data sources see[8]

References