If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-013-20012 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.35325,"lon":-78.565917,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Blair | |
Municipality: Juniata Township | |
Operator Name: LPR ENERGY LLC | |
Well Pad ID: 149193 | |
Farm/Lease Name: RITCHEY UNIT 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2009-09-04 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.353250 | |
Longitude: -78.565917 |
Date | Event |
---|---|
2009-09-04 | New Permit Application |
2010-01-17 | Performed Spud Operation |
2010-02-07 | Drilling Completion |
2010-05-13 | Perforation |
2010-07-26 | DEVIATED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHEVRON APPALACHIA LLC | 292,900.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 130,228.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2015 | LPR ENERGY LLC | 115,149.10 | 264 | 0.00 | 0 | 0.00 | 0 |
2016 | LPR ENERGY LLC | 111,332.37 | 279 | 0.00 | 0 | 0.00 | 0 |
2017 | LPR ENERGY LLC | 104,823.00 | 350 | 0.00 | 0 | 0.00 | 0 |
2018 | LPR ENERGY LLC | 93,020.00 | 360 | 0.00 | 0 | 0.00 | 0 |
2019 | LPR ENERGY LLC | 77,207.00 | 344 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 119.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 995.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 125.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010 | CHIEF OIL & GAS LLC | Produced Fluid | 169.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010 | CHIEF OIL & GAS LLC | Produced Fluid | 714.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 2,112.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2011 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 3,959.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2011 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 770.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 22.71 Tons | LANDFILL | 101397 |
2012 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 860.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 0.04 Tons | LANDFILL | 101397 |
2013 | CHEVRON APPALACHIA LLC | Produced Fluid | 10,860.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 1,291.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 4,749.67 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | LPR ENERGY LLC | Produced Fluid | 404.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 443.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | LPR ENERGY LLC | Produced Fluid | 2,252.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | LPR ENERGY LLC | Produced Fluid | 51.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | LPR ENERGY LLC | Produced Fluid | 613.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2016 | LPR ENERGY LLC | 210.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 | |
2016 | LPR ENERGY LLC | Produced Fluid | 1,256.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016 | LPR ENERGY LLC | Produced Fluid | 3,412.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | LPR ENERGY LLC | 102.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 | |
2016 | LPR ENERGY LLC | Produced Fluid | 160.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | LPR ENERGY LLC | 613.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 | |
2017 | LPR ENERGY LLC | Produced Fluid | 1,903.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2017 | LPR ENERGY LLC | 2,766.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM | |
2017 | LPR ENERGY LLC | Produced Fluid | 828.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017 | LPR ENERGY LLC | Produced Fluid | 2,766.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM |
2017 | LPR ENERGY LLC | 828.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 | |
2017 | LPR ENERGY LLC | Produced Fluid | 100.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | LPR ENERGY LLC | 813.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | ||
2017 | LPR ENERGY LLC | 100.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 | |
2018 | LPR ENERGY LLC | Produced Fluid | 613.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2018 | LPR ENERGY LLC | Produced Fluid | 512.00 Bbl | REUSE (AT WELL PAD) | |
2018 | LPR ENERGY LLC | Produced Fluid | 3,988.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM |
2018 | LPR ENERGY LLC | Produced Fluid | 690.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2019 | LPR ENERGY LLC | Produced Fluid | 4,507.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1840645 | Primary Facility | 2009-11-03 | Drilling/Alteration | No Violations Noted | -site under construction. access road stoning and seeding/mulching in progress. |
1843575 | Primary Facility | 2009-11-06 | Drilling/Alteration | No Violations Noted | -Site inspected in response to complaint #267597. Complainant was driving passed site and saw large amounts of mud dragged out onto the road |
1843859 | Primary Facility | 2009-11-13 | Drilling/Alteration | No Violations Noted | -Site visited to attend a meeting between operator and concerned individuals working in or around the area. Concerned individuals seek cooperation from Chief to conduct in-stream monitoring of Bobs Cr. |
1857105 | Primary Facility | 2010-01-20 | Drilling/Alteration | No Violations Noted | Conducted Site Inspection with WQS Jessica Miller. |
1857429 | Primary Facility | 2010-01-20 | Drilling/Alteration | No Violations Noted | -Site inspected with OGI Travis Walker and accompanied by Company man, Bill Swanson. |
1860453 | Primary Facility | 2010-01-28 | Drilling/Alteration | Violation(s) Noted | Met on site first with Tool Pusher Trey Villarreal. |
1860839 | Primary Facility | 2010-02-02 | Routine/Complete Inspection | Violation(s) Noted | |
1864950 | Primary Facility | 2010-02-23 | Compliance Evaluation | No Violations Noted | Drilling operations are completed and wellhead is in place with no visable leaks. |
1865752 | Primary Facility | 2010-02-23 | Routine/Complete Inspection | No Violations Noted | -Site inspected with OGI Travis Walker. Mr. Walker was conducting a follow-up to a previous NOV that he wrote |
1869414 | Primary Facility | 2010-03-12 | Routine/Complete Inspection | Violation(s) Noted | - Inspection conducted after a long period of warm weather and during a rain storm. |
1870561 | Primary Facility | 2010-03-18 | Compliance Evaluation | No Violations Noted | - Inspection conducted as follow-up to 3-12-2010 inspection revealing violations of the Solid Waste Management Act. |
1887373 | Primary Facility | 2010-05-24 | Routine/Complete Inspection | Violation(s) Noted | -Spill response revealed spill cleaned up but holes in pit liner resulting in a discharge. |
1887419 | Primary Facility | 2010-05-26 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | follow-up sampling conducted with Matt Barch of Chief Oil and Gas |
1900750 | Primary Facility | 2010-07-21 | Routine/Partial Inspection | No Violations Noted | |
1907310 | Primary Facility | 2010-08-20 | Follow-up Inspection | No Violations Noted | Follow-up report for Pit liner holes discovered on 5/24/2010. Covers period between 6/3/2010 and 8/20/2010. Due to change in Field areas, case will be turned over to new WQS covering Blair County |
1929634 | Primary Facility | 2010-10-29 | Routine/Complete Inspection | No Violations Noted | |
1932367 | Primary Facility | 2010-11-29 | Routine/Complete Inspection | No Violations Noted | Well completed, annulus shut in. |
1933379 | Primary Facility | 2010-12-08 | Compliance Evaluation | No Violations Noted | |
1980338 | Primary Facility | 2011-04-12 | Routine/Complete Inspection | No Violations Noted | |
1993517 | Primary Facility | 2011-06-20 | Routine/Complete Inspection | No Violations Noted | |
1997598 | Primary Facility | 2011-07-06 | Routine/Complete Inspection | No Violations Noted | |
2001272 | Primary Facility | 2011-07-22 | Routine/Complete Inspection | No Violations Noted | |
2024713 | Primary Facility | 2011-10-19 | Routine/Complete Inspection | No Violations Noted | |
2035474 | Primary Facility | 2011-12-21 | Routine/Complete Inspection | No Violations Noted | |
2049127 | Primary Facility | 2012-02-14 | Routine/Complete Inspection | No Violations Noted | |
2058964 | Primary Facility | 2012-03-08 | Routine/Complete Inspection | No Violations Noted | |
2130526 | Primary Facility | 2013-01-10 | Routine/Complete Inspection | No Violations Noted | |
2139777 | Primary Facility | 2013-02-05 | Incident- Response to Accident or Event | Viol(s) Noted & Immediately Corrected | |
2150745 | Primary Facility | 2013-03-19 | Routine/Complete Inspection | No Violations Noted | |
2170029 | Primary Facility | 2013-05-29 | Routine/Complete Inspection | No Violations Noted | |
2196045 | Primary Facility | 2013-08-13 | Routine/Complete Inspection | No Violations Noted | |
2223715 | Primary Facility | 2013-11-19 | Routine/Complete Inspection | No Violations Noted | |
2232640 | Primary Facility | 2013-12-27 | Routine/Complete Inspection | No Violations Noted | |
2500005 | Primary Facility | 2016-06-27 | Site Restoration | No Violations Noted | |
2688345 | Primary Facility | 2018-01-30 | Routine/Complete Inspection | No Violations Noted | The weather is 22 Deg. F, cloudy and windy at time of inspection. Routine inspection of LPR Energy LLC., Ritchey Unit, Well # 1H on January 30, 2018.
There are 3 producing wells on this pad. Annulus is closed and not vented at time of inspection. Mechanical gauge on the production line reads pressure 500 PSI, the gauge on the annulus reads 0 PSI. 0% combustible gas was detected at the annulus or in the area immediately surrounding the well. Wellsite looks neat and well organized. No violations noted at the time of inspection. DEP Representatives ¿ Ulyana Trynovich, Oil and Gas Inspector, Melissa S Herzing ¿ Water Quality Specialist. |
2818793 | Primary Facility | 2018-12-24 | Routine/Complete Inspection | No Violations Noted | Routine site inspection at LPR Energy LLC Ritchey Unit 1H well pad on December 24, 2018. There are 3 producing Marcellus wells located onsite. Well cellars are full of gravel. Connected to each well are 3 separate GPUs and (3) 400 bbl produced fluids tanks.
The well pad has been partially reduced in size. The Department has approved the ESCGP NOT. Overall the well pad is stable and covered in snow. Well site restoration reports were previously submitted by LPR in June 2016. The Department denied those reports because the well heads were not properly labeled per OAG3211(h). The Department recommending addressing the labeling issue and then resubmitting well site restoration reports for wells 013-20012, 013-20013, and 013-20015. These reports shall be submitted through the Departments Greenport system. |
2854427 | Primary Facility | 2019-03-15 | Routine/Complete Inspection | No Violations Noted | Routine site inspection at LPR Energy LLC Ritchey Unit 1H well pad on March 15, 2019. There are 3 producing Marcellus wells located onsite. Well cellars are full of gravel. Connected to each well are 3 separate GPUs and (3) 400 bbl produced fluids tanks.
The well pad has been partially reduced in size. The Department has approved the ESCGP NOT. Overall the well pad is stable and slopes are well vegetated. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1860453 | 580623 | 01/28/2010 | 2010-01-28 | 401 CSL - Discharge of pollutional material to waters of Commonwealth. | Environmental Health & Safety | See Insp ID 1865752, viols corrected/closed. Drill mud spill. |
1860839 | 580715 | 02/02/2010 | 2010-02-02 | 78.56PITCNST - Impoundment not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table | Administrative | See Insp ID 1865752, viols corrected/closed. several tears in the liner in the liner in the upper left back corner approximately 3' down from the upper edge, the holes range from a 12" long tear to a hole approximately 12" long by 3" wide |
1860839 | 580716 | 02/02/2010 | 2010-02-02 | 401 CSL - Discharge of pollultional material to waters of Commonwealth. | Environmental Health & Safety | See Insp ID 1865752, viols corrected/closed. Shaker seal leaked allowing drilling mud to accumulate on the ground, the initial spill was unreported |
1860839 | 582498 | 02/02/2010 | 2010-02-02 | 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used | Administrative | See Insp ID 1865752, viols corrected/closed. SWMA 301 unpermitted discharge of residual waste to ground, drill mud and drill cuttings. |
1869414 | 583111 | 03/12/2010 | 2010-03-12 | 691.1 - Clean Streams Law-General. Used only when a specific CLS code cannot be used | Administrative | See Insp ID 1869414 done 3/18/10, past SWMA 301 viol corrected, closed. Specific reg is 35 PS para 6018.610 (1): dumping or depositing solid waste onto the ground. Company response rec'vd 3/25/10, viols closed satisfactorily. |
1887373 | 588096 | 05/24/2010 | 2010-05-24 | 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used | Administrative | SWMA 6018.301 management of residual waste |
1887373 | 588097 | 05/24/2010 | 2010-05-24 | 78.56PITCNST - Impoundment not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table | Administrative | |
1887373 | 588098 | 05/24/2010 | 2010-05-24 | 401 CSL - Discharge of pollultional material to waters of Commonwealth. | Environmental Health & Safety | |
2139777 | 660859 | 02/05/2013 | 2013-02-05 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety | 1 gal of anti-freeze from a broken line on a pumper truck.immediately cleaned up. |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
580623 | 254800 | NOV - Notice of Violation | Comply/Closed | 2010-02-23 | |||
580715 | 255750 | NOV - Notice of Violation | Comply/Closed | 2010-02-23 | |||
580716 | 255750 | NOV - Notice of Violation | Comply/Closed | 2010-02-23 | |||
582498 | 255750 | NOV - Notice of Violation | Comply/Closed | 2010-02-23 | |||
583111 | 256316 | NOV - Notice of Violation | Comply/Closed | 2010-03-18 | |||
588096 | 258748 | NOV - Notice of Violation | Comply/Closed | 2010-12-08 | |||
588096 | 271716 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2011-06-14 | 2011-06-14 | $29,500.00 | $29,500.00 |
588097 | 258748 | NOV - Notice of Violation | Comply/Closed | 2010-12-08 | |||
588097 | 271716 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2011-06-14 | 2011-06-14 | $29,500.00 | $29,500.00 |
588098 | 258748 | NOV - Notice of Violation | Comply/Closed | 2010-12-08 | |||
588098 | 271716 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2011-06-14 | 2011-06-14 | $29,500.00 | $29,500.00 |
For data sources see[7]