If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-013-20016 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.362608,"lon":-78.549922,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Blair | |
Municipality: Juniata Township | |
Operator Name: LPR ENERGY LLC | |
Well Pad ID: 147456 | |
Farm/Lease Name: LIGHTNER EAST UNIT 1H | |
License Status: | |
Spud Date: 2010-10-31 | |
Permit Date: 2010-08-10 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.362608 | |
Longitude: -78.549922 |
Date | Event |
---|---|
2010-08-10 | New Permit Application |
2010-11-20 | Drilling Completion |
2011-01-23 | Performed Spud Operation |
2011-04-11 | Perforation |
2012-07-20 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-04-11 | 2011-04-11 | 7,177 | 4,642,470 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Scale Inhibitor - Greenhib 677 | Pumpco Services | Scale Inhibitor | |||||
Salt of phosphono-methylated diamine | 25.00 | 0.07 | ||||||
Friction Reducer - Plexslick 921 | Pumpco Services | Friction Reducer | ||||||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 0.10 | ||||||
Biocide - Plexcide 24L | Pumpco Services | Biocide | ||||||
Sodium hydroxide | 1310-73-2 | |||||||
Tetrahydro-3,5-dimethyl,2H-1,3,5-thiadiazine-2-thione | 533-74-4 | 24.00 | 0.02 | |||||
Plexaid OS-30 | Pumpco Services | Oxygen Scavenger | ||||||
Ammonium bisulfite | 10192-30-0 | 0.01 | ||||||
Sand (Proppant) | Pumpco Services | Propping Agent | Quartz | 14808-60-7 | 99.90 | 18.21 | ||
Water | Base Fluid | Water | 100.00 | 81.58 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CHEVRON APPALACHIA LLC | 32,366.00 | 31 | 0.00 | 0 | 0.00 | 0 |
2013 | CHEVRON APPALACHIA LLC | 345,667.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 162,355.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2015 | LPR ENERGY LLC | 135,164.69 | 315 | 0.00 | 0 | 0.00 | 0 |
2016 | LPR ENERGY LLC | 126,825.91 | 364 | 0.00 | 0 | 0.00 | 0 |
2017 | LPR ENERGY LLC | 123,598.00 | 356 | 0.00 | 0 | 0.00 | 0 |
2018 | LPR ENERGY LLC | 110,438.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | LPR ENERGY LLC | 111,230.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 3,143.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2012 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 335.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 64.61 Tons | LANDFILL | 101397 |
2012 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 120.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2012 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 690.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2013 | CHEVRON APPALACHIA LLC | Fracturing Fluid Waste | 0.44 Tons | LANDFILL | 101397 |
2013 | CHEVRON APPALACHIA LLC | Produced Fluid | 10,511.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 611.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 60.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 3,186.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | LPR ENERGY LLC | Produced Fluid | 321.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2015 | LPR ENERGY LLC | Produced Fluid | 2,693.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | LPR ENERGY LLC | Produced Fluid | 69.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | LPR ENERGY LLC | Produced Fluid | 418.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2016 | LPR ENERGY LLC | 100.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 | |
2016 | LPR ENERGY LLC | Produced Fluid | 471.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016 | LPR ENERGY LLC | Produced Fluid | 2,473.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | LPR ENERGY LLC | 299.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 | |
2016 | LPR ENERGY LLC | Produced Fluid | 305.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2016 | LPR ENERGY LLC | 418.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 | |
2017 | LPR ENERGY LLC | Produced Fluid | 1,519.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM |
2017 | LPR ENERGY LLC | 1,519.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM | |
2017 | LPR ENERGY LLC | Produced Fluid | 531.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017 | LPR ENERGY LLC | Produced Fluid | 1,291.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2017 | LPR ENERGY LLC | 531.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 | |
2017 | LPR ENERGY LLC | 201.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | ||
2018 | LPR ENERGY LLC | Produced Fluid | 408.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2018 | LPR ENERGY LLC | Produced Fluid | 409.00 Bbl | REUSE (AT WELL PAD) | |
2018 | LPR ENERGY LLC | Produced Fluid | 203.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2018 | LPR ENERGY LLC | Produced Fluid | 2,149.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM |
2019 | LPR ENERGY LLC | Produced Fluid | 2,867.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1929452 | Primary Facility | 2010-10-19 | Routine/Complete Inspection | No Violations Noted | |
1929666 | Primary Facility | 2010-10-29 | Routine/Complete Inspection | No Violations Noted | |
1932418 | Primary Facility | 2010-11-29 | Drilling/Alteration | No Violations Noted | Drilling completed Rig stacked on location |
1948086 | Primary Facility | 2011-01-04 | Routine/Complete Inspection | Viol(s) Noted & Immediately Corrected | |
1951476 | Primary Facility | 2011-01-14 | Routine/Complete Inspection | No Violations Noted | |
1980393 | Primary Facility | 2011-04-12 | Routine/Complete Inspection | No Violations Noted | |
1981907 | Primary Facility | 2011-05-10 | Routine/Complete Inspection | No Violations Noted | |
1993531 | Primary Facility | 2011-06-20 | Routine/Complete Inspection | No Violations Noted | |
2001250 | Primary Facility | 2011-07-22 | Routine/Complete Inspection | No Violations Noted | |
2004549 | Primary Facility | 2011-08-03 | Routine/Complete Inspection | No Violations Noted | |
2024651 | Primary Facility | 2011-10-19 | Routine/Complete Inspection | No Violations Noted | |
2029936 | Primary Facility | 2011-12-28 | Routine/Complete Inspection | No Violations Noted | |
2035525 | Primary Facility | 2011-12-21 | Routine/Complete Inspection | No Violations Noted | |
2058959 | Primary Facility | 2012-03-08 | Routine/Complete Inspection | No Violations Noted | |
2130544 | Primary Facility | 2013-01-10 | Routine/Complete Inspection | No Violations Noted | |
2170034 | Primary Facility | 2013-05-29 | Routine/Complete Inspection | No Violations Noted | |
2196039 | Primary Facility | 2013-08-13 | Routine/Complete Inspection | No Violations Noted | |
2223706 | Primary Facility | 2013-11-19 | Routine/Complete Inspection | No Violations Noted | |
2232628 | Primary Facility | 2013-12-27 | Routine/Complete Inspection | No Violations Noted | |
2307843 | Primary Facility | 2014-09-29 | Routine/Complete Inspection | No Violations Noted | |
2468220 | Primary Facility | 2016-03-23 | Site Restoration | No Violations Noted | |
2688353 | Primary Facility | 2018-01-30 | Routine/Complete Inspection | No Violations Noted | The weather is 22 Deg. F, cloudy and windy at time of inspection. Routine inspection of LPR Energy LLC., Lightner East Unit Pad, Well # 1H on January 30, 2018.
There is producing wells on this pad. Annulus is closed and not vented at time of inspection. 0% combustible gas was detected at the annulus or in the area immediately surrounding the well. Wellsite looks neat and well organized. No violations noted at the time of inspection. DEP Representatives ¿ Ulyana Trynovich, Oil and Gas Inspector, Melissa S Herzing ¿ Water Quality Specialist. |
2784108 | Primary Facility | 2018-10-01 | Routine/Complete Inspection | No Violations Noted | Department representative Sue Herzing conducted a routine site inspection at LPR Energy's Lightner East Unit on October 1, 2018. There is one drilled and producing Marcellus well (013-20016) located on this partially reduced in size well pad. All areas surrounding the well pad are very well vegetated exceeding 70% uniform cover.
No violations noted. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1948086 | 604227 | 01/04/2011 | 2011-01-04 | 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth. | Environmental Health & Safety | Drilling mud and drill cuttings not properly cleaned up or contained on site. |
For data sources see[8]