X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-015-20067

Well Details

Well ID: 37-015-20067
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Windham Township
Operator Name: STAGECOACH PIPELINE & STORAGE CO LLC
Well Pad ID:
Farm/Lease Name: RYAN L2
License Status: ACTIVE
Spud Date:
Permit Date: 2006-08-29
Well Type: STORAGE WELL
Unconventional Well: N
Configuration: Horizontal Well
Conservation: Yes
Latitude: 41.991128
Longitude: -76.339192

For data sources see[1][2][3]

Well History

Date Event
2006-08-29 New Permit Application
2007-05-03 Performed Spud Operation
2007-11-13 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2006 STAGECOACH PIPELINE & STORAGE CO LLC 0.00 0 0.00 0 0.00 0
2007 STAGECOACH PIPELINE & STORAGE CO LLC 0.00 0 0.00 0 0.00 0
2008 STAGECOACH PIPELINE & STORAGE CO LLC 0.00 0 0.00 0 0.00 0
2009 STAGECOACH PIPELINE & STORAGE CO LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1627292 Primary Facility 2007-06-05 Routine/Complete Inspection No Violations Noted
1630527 Primary Facility 2007-05-31 Routine/Complete Inspection No Violations Noted
1639345 Primary Facility 2007-07-25 Drilling/Alteration No Violations Noted
1643768 Primary Facility 2007-08-10 Drilling/Alteration No Violations Noted
1671212 Primary Facility 2007-12-11 Routine/Complete Inspection No Violations Noted
1754025 Primary Facility 2008-11-26 Routine/Complete Inspection No Violations Noted
1835358 Primary Facility 2009-10-13 Routine/Complete Inspection No Violations Noted
1962590 Primary Facility 2011-04-01 Routine/Complete Inspection No Violations Noted 200# on prod string. No visible bubbling.
2120027 Primary Facility 2012-09-17 Routine/Complete Inspection No Violations Noted 2400 psi on 5 1/2. No other gauges.
2218450 Primary Facility 2013-10-29 Routine/Complete Inspection No Violations Noted
2352455 Primary Facility 2014-11-10 Routine/Complete Inspection No Violations Noted Unable to access wellhead for inspection. Contacted company for key to access. No emergency locations on signs. Will return to site for reinspection.
2352491 Primary Facility 2014-11-11 Routine/Complete Inspection No Violations Noted Obtained key from CNY to access wellheads for reinspection. Also obtained the following information from CNY main station for the following: Flow Rate (D) = 3.15; Flow Rate (H) = 131.21; Temp = 61.42, Pressure (PT11) = 2226.00; Pressure (PT12) = 2227.74; Well Pressure = 2227.83; Total Vol. Injected = 0.00; Total Vol Withdrawn = 0.54
2417452 Primary Facility 2015-10-21 Routine/Complete Inspection No Violations Noted Performed annual inspections of the Lydell Storage facility. Gauge reads 2900# pressure. All cellars are filled with dirt/gravel. All wells shut in at time of inspection:
2559436 Primary Facility 2017-01-09 Routine/Complete Inspection No Violations Noted Performed annual inspections of the Lydell Storage facility. All cellars are filled with dirt/gravel.

Scada data: Flow Rate (D) –10.23 Temperature –65.73 Pressure (PT10011) –851.05 Pressure (PT10012) –853.52 Well Pressure – 852.61 Total Volume (INJ) – 0.00 Total Volume (WD) –1.45

2651533 Primary Facility 2017-10-23 Routine/Complete Inspection No Violations Noted Arrived on location at 10:45. Wellhead pressure 2600#. Lidell field total injection flow= 24.86. Total withdraw flow = 0.00. Electronic data received from John Schaffer 10/18/17.

Flow rate = 7.74 (D) Flow rate = 322.61 (H) Temperature = 62.92 Pressure = 2972.95 (PT10011) Pressure = 2973.71 (PT10012) Well Pressure = 2969.88 Total Volume = 7.30 (INJ) Total Volume = 0.00 (WD)

No violations noted at time of inspection.

2790716 Primary Facility 2018-10-17 Routine/Complete Inspection No Violations Noted At time of inspection.

On site for a storage well inspection. Met with company men Jim Schultz and Geordie Decker Lidell field, Total injection flow: 9.3 MSCF/Day Total withdraw flow: 0.00 MSCF/Day

Wellhead pressure: 2431.1psi Flow rate: 4.4 MSCF/Day Temperature: 60.1

The cellar was full of gravel and there was no gas detected at the perimeter of the cellar. There were no violations noted.

For data sources see[6]

References