If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-015-20865 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.877794,"lon":-76.309322,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Bradford | |
Municipality: Orwell Township | |
Operator Name: CHESAPEAKE APPALACHIA LLC | |
Well Pad ID: 149183 | |
Farm/Lease Name: REXFORD 5H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-05-06 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.877794 | |
Longitude: -76.309322 |
Date | Event |
---|---|
2010-05-06 | New Permit Application |
2010-06-07 | Performed Spud Operation |
2010-10-08 | Perforation |
2014-02-14 | DEVIATED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHESAPEAKE APPALACHIA LLC | 233,209.00 | 90 | 0.00 | 0 | 0.00 | 0 |
2014 | CHESAPEAKE APPALACHIA LLC | 276,252.00 | 360 | 0.00 | 0 | 0.00 | 0 |
2015 | CHESAPEAKE APPALACHIA LLC | 108,221.00 | 354 | 0.00 | 0 | 0.00 | 0 |
2016 | CHESAPEAKE APPALACHIA LLC | 110,257.00 | 348 | 0.00 | 0 | 0.00 | 0 |
2017 | CHESAPEAKE APPALACHIA LLC | 131,829.00 | 340 | 0.00 | 0 | 0.00 | 0 |
2018 | CHESAPEAKE APPALACHIA LLC | 89,541.00 | 351 | 0.00 | 0 | 0.00 | 0 |
2019 | CHESAPEAKE APPALACHIA LLC | 68,812.00 | 364 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 4,965.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 1,221.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC007 |
2013 | CHESAPEAKE APPALACHIA LLC | Fracing Fluid Waste | 1,167.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC008 |
2013 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 8,824.17 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 100.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 4,893.62 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 50.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2015 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 453.16 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 56.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 212.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 605.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 126.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 147.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 58.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 5.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 58.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 99.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 382.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 55.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 112.00 Bbl | REUSE (AT WELL PAD) | |
2017 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 110.10 Bbl | REUSE (AT WELL PAD) | |
2018 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 50.10 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2018 | CHESAPEAKE APPALACHIA LLC | Waste Water Treatment Sludge | 0.40 Tons | LANDFILL | 301626 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1976895 | Primary Facility | 2011-05-18 | Routine/Complete Inspection | Violation(s) Noted | 22% LEL combustible gas off of 13 5/8 vent port |
1987627 | Primary Facility | 2011-07-14 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | 20 3 pressure on 13 3/8. 2 1/2% combustible gas being vented to atomosphere. |
2001690 | Primary Facility | 2011-08-25 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | 40% combustible gas off of 13 3/8. 2% comb gas off of 9 5/8. Not vented to tank. No bubbles in cellar. |
2024141 | Primary Facility | 2011-12-05 | Routine/Complete Inspection | No Violations Noted | Visible bubbling in the cellar. Cannot determine where gas is coming from as cellar is filled with water. Bubbling may be from communication with the 2H. |
2032643 | Primary Facility | 2012-01-05 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | 13 3/8' x 20' annulus leaking gas |
2033422 | Primary Facility | 2012-01-11 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | drilling out frac plugs and are at 9606 at present |
2049353 | Primary Facility | 2012-03-05 | Drilling/Alteration | No Violations Noted | workover rig onsite. Crew onsite monitoring pressures |
2049371 | Primary Facility | 2012-01-18 | Drilling/Alteration | No Violations Noted | Flowback crew onsite monitoring pressures. Wireline run this AM. Logs run 1/17 and 1/18. Logs to be reviewed by engineers 1/19 |
2063654 | Primary Facility | 2012-03-12 | Routine/Complete Inspection | No Violations Noted | 13 3/8 vent - 0% combustible gas, 0 psi |
2098741 | Primary Facility | 2012-09-10 | Routine/Complete Inspection | No Violations Noted | 13 3/8 casing pressure - gauge reads 0 psi, 0% combustible gas off of vent. |
2098742 | Primary Facility | 2012-09-05 | Routine/Complete Inspection | No Violations Noted | 13 3/8 casing pressure - gauge reads 0 psi, .5% combustible gas off of vent. Meter holds at |
2098743 | Primary Facility | 2012-08-27 | Routine/Complete Inspection | No Violations Noted | 13 3/8 casing pressure - gauge reads 0 psi, 1% combustible gas spike off of vent. Meter holds at .5% combustible gas |
2098744 | Primary Facility | 2012-08-22 | Routine/Complete Inspection | No Violations Noted | 13 3/8 casing pressure - gauge reads 0 psi, 1% combustible gas spike off of vent. Meter holds at .5% combustible gas |
2098745 | Primary Facility | 2012-08-16 | Routine/Complete Inspection | No Violations Noted | 13 3/8 X 9 5/8 casing pressure - gauge reads 0 psi, 0% combustible gas off of vent. |
2098746 | Primary Facility | 2012-07-05 | Routine/Complete Inspection | No Violations Noted | 13 3/8 X 9 5/8 casing pressure - gauge reads 0 psi, 0% combustible gas off of vent. |
2120031 | Primary Facility | 2012-10-10 | Routine/Complete Inspection | No Violations Noted | Back pressure vavle installed. Performing 48 hour shut-in tests. Well currently shut-in. 13 3/8 - 0 psi. 9 5/8 - 0 psi (pop-off valve installed). 5 1/2 - 275 psi. |
2120677 | Primary Facility | 2012-10-03 | Routine/Complete Inspection | No Violations Noted | 13 X 9 - 0 psi 0.2 %spike comb gas |
2120685 | Primary Facility | 2012-09-25 | Routine/Complete Inspection | No Violations Noted | 13 X 9 -(vented) - 0psi - 2% combustible gas spike |
2194576 | Primary Facility | 2013-08-02 | Routine/Complete Inspection | No Violations Noted | Inspection for 'Inactive Well Status". |
2203364 | Primary Facility | 2013-09-04 | Routine/Complete Inspection | No Violations Noted | |
2239234 | Primary Facility | 2014-01-13 | Routine/Complete Inspection | No Violations Noted | |
2259257 | Primary Facility | 2014-04-02 | Routine/Complete Inspection | No Violations Noted | |
2265008 | Primary Facility | 2014-04-17 | Routine/Complete Inspection | No Violations Noted | |
2374247 | Primary Facility | 2015-05-28 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | |
2493909 | Primary Facility | 2016-06-16 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | At time of inspection, arrived on site at 9:30a.m. On site to conclude the 72 hr. Pressure Build-up Test (PBUT) being performed on the 5H and the 2H as part of an ongoing migration investigation. I was accompanied by Eric Rooney (DEP Geologist), we met with Joel Mincer (lease operator for Chesapeake) and Tom Messing of Leidos. The wells were shut in on 6/13/16 at 10:15a.m. It was noticed that the pop off valves were still on the (28x20), (20x13¿), and (13¿x9¿) vent pipes on the 2H and on the (28x20) and (20x13¿) vent pipes on the 5H.
Tom called Charlie Olmsted of Chesapeake to let him know of the pop off valves and Charlie said the PBUT would be rescheduled for sometime in July. No gas samples or pressure reading were taken. I left the site at 10:50a.m. |
2502272 | Primary Facility | 2016-07-18 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | At time of inspection, arrived on site at 13:10p.m. for a post 72hr pressure build up test (PBUT), the cellar was empty, I met with lease operators Joel Mincer and Joel Failie. They were setting up the wells for the 72hr PBUT, Joel Mincer had to go to the shop to get some connections, he returned about 15:00p.m. The production line was shut in at 15:30p.m. and the other annuli’s were shut in and set up with a digital recorder at 5:26p.m. The vent pipes from the 28" and 20" caps were set up with a 15lb pop off valve and they had a hose going to a plastic tank.
I left the site at 5:30p.m. |
2503861 | Primary Facility | 2016-07-21 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | At time of inspection, arrived on site at 16:10p.m. to conclude the 72hr. Pressure Build-up Test (PBUT) being performed on the 2H and the 5H as part of an ongoing migration investigation. The cellar was empty. I met with Joel Mincer (lease operator for Chesapeake), Tom Messing and Shauna Erway of Leidos. The wells were shut in on 7/18/16 at 17:26,Tom used a Gas Explorer gas meter by Bascom Turner calibrated on 7/21/16 to check for gas show at all annuli’s, gas samples were taken if gas was detected. Pressures were taken from a 30psi pressure gauge for the 28" and 20" annuli’s, and from the SCADA digital pressure gauges on the wells for the rest of the annuli’s. The 28" and 20" annuli’s were set up with 15psi pop off valves and connected to poly tanks, there was no gas detected at the tanks. We started taking pressures at 17:25 on the 5H.
I left the site at 18:30p.m. |
2575950 | Primary Facility | 2017-03-20 | Routine/Complete Inspection | No Violations Noted | On March 20, 2017, the Department conducted a routine inspection at the Chesapeake Appalachia, LLC (Chesapeake) Rexford Location in Orwell Township, Bradford County. Andrew Hobbins, Water Quality Specialist, represented the Department. Nobody was present for Chesapeake.
The E&S plan, site sign and weekly inspection reports were on site and available for review. The site was mostly covered in about 8 inches of snow. PCSM has not been addressed at the site. There were two well in production phase during the inspection. Both wells were labeled and no bubbling was observed in the well cellar. Two production tanks and two GPUs were on site. The production tanks were on secondary containment. The ESGGP-2 permit expires 1/11/2021. A major modification was approved on January 12, 2016 to address PCSM. According to Department records, there are no active well permits for the Rexford Location. The well pad retains its original shape and has not been reduced in size. The Department recommends installi |
2591654 | Primary Facility | 2017-05-08 | Routine/Complete Inspection | Outstanding Violations - Viols Req'd | At time of inspection, arrived on site at 12:00p.m. for a pre-PBUT inspection.
The cellar was about half full of water with no bubbling noticed. The (28x20) annulus was set up with a pop off valve and a 60psi pressure gauge with 0psi on it. The (20x13) annulus was set up with a digital recorder and a 60psi pressure gauge with 0psi on it. The (13x9) annulus was set up with a SCADA digital pressure gauge with 0psi on it and the valve going to the production tank was closed. The (9x5) annulus was set up with a SCADA digital pressure gauge with 114psi on it and the valve going to the production tank was closed. The 5½ production casing was open and venting to the production tank with 0psi on the SCADA pressure gauge. There was 863psi on the production tubing. I left the site at 13:05 p.m. |
2593893 | Primary Facility | 2017-05-11 | Follow-up Inspection | Outstanding Violations - Viols Req'd | At time of inspection, arrived on site at 8:00a.m. to conclude the 72hr. Pressure Build-up Test (PBUT) being performed on the 2H and the 5H as part of an ongoing migration investigation. The cellar was about half full of water with no bubbling noticed. I met with Joel Fairlie of Chesapeake, Tom Messing and Shauna Erway of Leidos. The wells were shut in on 5/8/17 at 8:15a.m. Tom used a Gas Explorer gas meter by Bascom Turner to check for gas show at all annuli’s, gas samples were taken if gas was detected. Pressures were taken from SSI Technology Inc. pressure gauge for the 28" and 20" annuli’s, and from the SCADA digital pressure gauges on the wells for the rest of the annuli’s. The wells were still producing.
We started taking pressures at 8:20a.m. on the 5H. I left the site at 9:15a.m. |
2756121 | Primary Facility | 2018-07-11 | Routine/Complete Inspection | Outstanding Violations - Viols Req'd | Remarks: At time of inspection. On site to check for gas presence, gas flows and take samples from the annuli of the 2H and 5H wells. I was accompanied by DEP OGI Supervisor, Mike Panettieri and DEP OGI, David Schoonover. We met with Chesapeake Reps. Max Goff (Operations Engineer), Lester Peterson (Optimization Technician), Joe Riley (Well Tender) and Leidos Rep. Tom Messing.
- Lester used an Eco meter to check the fluid level in the (9x5) and (5/Prod) annuli on 7/5/18. Tom used a Gas Explorer gas meter (calibrated on 7/10/18) to check for gas shows at annuli and I used an Altair 5X gas meter (calibrated on 7/9/18) to confirm the results. Joe used a Digital Manometer 621 with a 1/4" orifice to check for any flow rates at annuli. There were no measurable gas flow rates detected at any annuli, cemented to surface, of the 2H or 5H wells at time of inspection. Both wells (28"x 20"), (20"x 13 3/8") and (13 3/8"x 9 5/8") annuli had been open and venting for several weeks prior to this inspection. The results of |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1976895 | 612379 | 05/18/2011 | 2011-05-18 | 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days | Administrative | |
2591654 | 785122 | 2017-05-08 | 78a85(a)5 | Environmental Health & Safety | ||
2591654 | 785123 | 2017-05-08 | 78a86 | Environmental Health & Safety | ||
2593893 | 785660 | 2017-05-11 | 78a85(a)5 | Environmental Health & Safety | ||
2593893 | 785661 | 2017-05-11 | 78a86 | Environmental Health & Safety | ||
2756121 | 823278 | 2011-05-18 | 78a86 | Environmental Health & Safety | Originally cited on 5/18/11. Operator has performed remedial work on the 5H well between 1/21/12 - 2/20/12. (See attached well bore diagram for details). No gas flows were noted in cemented annuli of the 5H well at time of this inspection. | |
2756121 | 823279 | 2017-05-11 | 78a85(a)5 | Environmental Health & Safety | Originally cited on 5/8/17. No gas flows were noted in cemented annuli of the 5H well at time of this inspection. |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
612379 | 275910 | NOV - Notice of Violation |
For data sources see[7]