If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-015-20989 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.931944,"lon":-76.409753,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Bradford | |
Municipality: Litchfield Township | |
Operator Name: CHESAPEAKE APPALACHIA LLC | |
Well Pad ID: 147706 | |
Farm/Lease Name: ALDERFER | |
License Status: Plugged and Abandoned | |
Spud Date: | |
Permit Date: 2010-06-29 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.931944 | |
Longitude: -76.409753 |
Date | Event |
---|---|
2010-06-29 | New Permit Application |
2010-09-14 | Performed Spud Operation |
2011-01-04 | Perforation |
2011-01-14 | Perforation |
2011-01-14 | Performed Stage 1 of Stimulation |
2011-01-15 | Perforation |
2011-01-15 | Performed Stage 2 of Stimulation |
2011-01-16 | Perforation |
2011-01-16 | Performed Stage 3 of Stimulation |
2011-01-16 | Performed Stage 4 of Stimulation |
2011-01-17 | Perforation |
2011-01-17 | Performed Stage 5 of Stimulation |
2011-01-18 | Perforation |
2011-01-18 | Performed Stage 6 of Stimulation |
2011-01-18 | Performed Stage 7 of Stimulation |
2011-01-20 | Perforation |
2011-01-20 | Performed Stage 8 of Stimulation |
2011-01-20 | Performed Stage 9 of Stimulation |
2011-01-21 | Perforation |
2011-01-21 | Performed Stage 10 of Stimulation |
2011-01-27 | Perforation |
2011-01-27 | Performed Stage 11 of Stimulation |
2011-01-27 | Performed Stage 12 of Stimulation |
2011-01-28 | Perforation |
2011-01-28 | Performed Stage 13 of Stimulation |
2011-01-28 | Performed Stage 14 of Stimulation |
2012-11-09 | DEVIATED |
2017-08-24 | Inactive Well Request Granted |
2019-10-18 | Begin Plugging |
2019-10-27 | Finished Plugging |
2020-01-14 | Fully Plugged |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2011-01-14 | 1 | Ottawa | 5,425,812 | 5,926 | 7,320 |
2011-01-15 | 2 | Ottawa | 5,425,812 | 5,468 | 8,651 |
2011-01-16 | 3 | Ottawa | 5,425,812 | 5,807 | 6,661 |
2011-01-16 | 4 | Ottawa | 5,425,812 | 5,703 | 9,418 |
2011-01-17 | 5 | Ottawa | 5,425,812 | 5,380 | 9,010 |
2011-01-18 | 6 | Ottawa | 5,425,812 | 6,125 | 9,042 |
2011-01-18 | 7 | Ottawa | 5,425,812 | 5,676 | 8,759 |
2011-01-20 | 8 | Ottawa | 5,425,812 | 5,817 | 6,258 |
2011-01-20 | 9 | Ottawa | 5,425,812 | 5,715 | 8,999 |
2011-01-21 | 10 | Ottawa | 5,425,812 | 5,866 | 9,082 |
2011-01-27 | 11 | Ottawa | 5,425,812 | 5,961 | 9,437 |
2011-01-27 | 12 | Ottawa | 5,425,812 | 5,618 | 9,294 |
2011-01-28 | 13 | Ottawa | 5,425,812 | 7,187 | 9,450 |
2011-01-28 | 14 | Ottawa | 5,425,812 | 5,660 | 8,959 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CHESAPEAKE APPALACHIA LLC | 344,264.00 | 213 | 0.00 | 0 | 0.00 | 0 |
2013 | CHESAPEAKE APPALACHIA LLC | 316,183.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2014 | CHESAPEAKE APPALACHIA LLC | 287,236.00 | 358 | 0.00 | 0 | 0.00 | 0 |
2015 | CHESAPEAKE APPALACHIA LLC | 166,698.00 | 306 | 0.00 | 0 | 0.00 | 0 |
2016 | CHESAPEAKE APPALACHIA LLC | 68,834.00 | 114 | 0.00 | 0 | 0.00 | 0 |
2017 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | CHESAPEAKE APPALACHIA LLC | 332,142.00 | 249 | 0.00 | 0 | 0.00 | 0 |
2019 | CHESAPEAKE APPALACHIA LLC | 262,936.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 110.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2012 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 8,139.16 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 3,424.93 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 2,500.38 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 203.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 249.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2018 | CHESAPEAKE APPALACHIA LLC | Waste Water Treatment Sludge | 23.15 Tons | LANDFILL | 301626 |
2018 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 208.00 Bbl | REUSE (AT WELL PAD) | |
2018 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 712.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2019 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 119.05 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 118.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1933276 | Primary Facility | 2010-12-09 | Routine/Complete Inspection | No Violations Noted | Nomac 31 just pulled off location. Moving to Hayward 2H. Currently powerwashing mats. Plan on pulling remainer of mats and liner. |
2008329 | Primary Facility | 2011-09-27 | Routine/Complete Inspection | No Violations Noted | 2 string well. 0 psi on gaguges. Cellars filled with water. No visible bubbling. |
2010827 | Primary Facility | 2011-09-20 | Routine/Complete Inspection | No Violations Noted | |
2153792 | Primary Facility | 2013-04-03 | Routine/Complete Inspection | No Violations Noted | |
2266381 | Primary Facility | 2014-04-28 | Routine/Complete Inspection | No Violations Noted | |
2588756 | Primary Facility | 2017-05-01 | Routine/Complete Inspection | No Violations Noted | Inspection to assess overall site conditions. I arrived on site at 13:00'hrs. No violations cited. |
2616999 | Primary Facility | 2017-07-13 | Routine/Complete Inspection | No Violations Noted | |
2708113 | Primary Facility | 2018-03-21 | Routine/Complete Inspection | No Violations Noted | Inspection to assess overall site conditions. No violations cited. |
2769557 | Primary Facility | 2018-08-22 | Incident- Response to Accident or Event | No Violations Noted | I arrived at the site at 11:45 in response to a spill of an estimated (43) bbls (barrels) of production fluid to secondary containment. The weather conditions are partly sunny skies and breezy with temps in the mid 70's. On 8/20/18 at 11:36 AM CHK submitted a Deficient Tank Inspection for unconventional wells per section 78a.57(i) Notification, for the Alderfer 2H well. The notice indicated the following information. The date and time of the tank inspection was 8/20/18 at 8:30 AM. The tank contents are produced water. The tank is (400) barrels in capacity. A small leak was observed in the sidewall of the tank resulting in an estimated (43) barrels of fluid lost. There were no impacts as a result of the spill and all fluid was contained in secondary containment. The corrective plan of action is to replace the tank and keep the wells shut in until the tank is replaced. I met with Bill Oliver and Jason Crawford, measurement techs of AMI Incorporated shortly after I arrived to the site. AMI informed me t |
2776747 | Primary Facility | 2018-09-18 | Site Restoration | No Violations Noted | NOT approval.
I took electrical conductivity readings with an Oakton PCSTestr 35. Water pooled on the pad returned a 0.08 mS/cm reading. JLP |
For data sources see[8]