If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-015-21243 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Country: United States | |
State: Pennsylvania | |
County: Bradford | |
Municipality: Smithfield Township | |
Operator Name: CHESAPEAKE APPALACHIA LLC | |
Well Pad ID: 148658 | |
Farm/Lease Name: KEELER HOLLOW 5H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-10-08 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.900336 | |
Longitude: -76.573411 |
Date | Event |
---|---|
2010-10-08 | New Permit Application |
2010-12-15 | Performed Spud Operation |
2012-01-10 | Perforation |
2014-01-07 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-01-25 | 2012-01-25 | 5,512 | 4,484,172 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Ottawa Sand | Proppant | Quartz | 14808-60-7 | 100.00 | 12.33 | ||
Scale Inhibitor - Gyptron T-390 | Champion Technologies | Scale Inhibitor | ||||||
10.1 - 15 HCL | Frac Tech Services (FTS) | Acid | Water | 7732-18-5 | 85.00 | 0.20 | ||
Hydrochloric acid | 7647-01-0 | 15.00 | 0.03 | |||||
FRW-200 | Frac Tech Services (FTS) | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 26.00 | 0.01 | ||
Scale Inhibitor - Gyptron T-390 | Scale Inhibitor | Methanol | 67-56-1 | 10.00 | 0.00113000 | |||
CI-150 (Corrosion Inhibitor) | Frac Tech Services (FTS) | Corrosion Inhibitor | Organic Amineresin Salt | 30.00 | 0.00019000 | |||
N,N-Dimethylformamide | 68-12-2 | 10.00 | 0.00006000 | |||||
Isopropanol | 67-63-0 | 60.00 | 0.00037000 | |||||
Aromatic Aldehyde | 10.00 | 0.00006000 | ||||||
Quaternary Ammonium Compounds | 10.00 | 0.00006000 | ||||||
100 Mesh Sand | Proppant | Quartz | 14808-60-7 | 100.00 | 1.37 | |||
Fresh Water | Carrier/Base Fluid | 73.82 | ||||||
Recycled Produced Water | Carrier/Base Fluid | 12.14 | ||||||
FE 100L (Iron Chelator) | Frac Tech Services (FTS) | Iron Control Agent | Citric acid | 77-92-9 | 55.00 | 0.00066000 | ||
Biocide - Bactron K 139 | Champion Technologies | Antibacterial Agent | Glutaraldehyde | 111-30-8 | 5.00 | 0.00171000 | ||
Ethanol | 64-17-5 | 5.00 | 0.00171000 | |||||
Quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 10.00 | 0.00342000 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CHESAPEAKE APPALACHIA LLC | 364,770.00 | 156 | 0.00 | 0 | 0.00 | 0 |
2013 | CHESAPEAKE APPALACHIA LLC | 581,326.00 | 348 | 0.00 | 0 | 0.00 | 0 |
2014 | CHESAPEAKE APPALACHIA LLC | 377,531.00 | 262 | 0.00 | 0 | 0.00 | 0 |
2015 | CHESAPEAKE APPALACHIA LLC | 333,388.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2016 | CHESAPEAKE APPALACHIA LLC | 254,915.00 | 358 | 0.00 | 0 | 0.00 | 0 |
2017 | CHESAPEAKE APPALACHIA LLC | 306,093.00 | 348 | 0.00 | 0 | 0.00 | 0 |
2018 | CHESAPEAKE APPALACHIA LLC | 240,663.00 | 356 | 0.00 | 0 | 0.00 | 0 |
2019 | CHESAPEAKE APPALACHIA LLC | 185,546.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CHESAPEAKE APPALACHIA LLC | Drilling Fluid Waste | 1,647.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 644.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2012 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 18,206.83 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 110.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2013 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 10,568.98 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 3,434.11 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 96.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2015 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 205.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2015 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 2,635.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 206.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 1,122.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 112.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 245.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 417.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 213.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2017 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 110.00 Bbl | REUSE (AT WELL PAD) | |
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 319.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 204.00 Bbl | REUSE (AT WELL PAD) | |
2018 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 214.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1952719 | Primary Facility | 2011-01-28 | Drilling/Alteration | No Violations Noted | |
2045180 | Primary Facility | 2012-02-15 | Routine/Complete Inspection | No Violations Noted | |
2238081 | Primary Facility | 2014-01-21 | Incident- Response to Accident or Event | No Violations Noted | |
2250010 | Primary Facility | 2014-03-03 | Routine/Complete Inspection | Pending | |
2587179 | Primary Facility | 2017-04-26 | Routine/Complete Inspection | No Violations Noted | Inspection to assess overall site conditions. I arrived on site at 11:05 hrs. One well in production. No violations cited. |
2707727 | Primary Facility | 2018-03-20 | Routine/Complete Inspection | No Violations Noted | Inspection to assess overall site conditions. No violations cited. |
2845881 | Primary Facility | 2019-02-27 | Routine/Complete Inspection | No Violations Noted | I did not take electrical conductivity readings because there is no pooled liquid on site (all frozen).
I did not see any "PCSM"controls on site. The pad is surrounded by a berm with cutouts on the east & west sides of the pad that allow water to drain off the pad into rock lined ditches,then level spreaders that release the drainage into a vegetated field. Air temp 20F, cloudy JLP |
For data sources see[8]