If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-015-21540 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.564553,"lon":-76.333475,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Bradford | |
Municipality: Wilmot Township | |
Operator Name: CHESAPEAKE APPALACHIA LLC | |
Well Pad ID: 148958 | |
Farm/Lease Name: NORCONK 6H | |
License Status: | |
Spud Date: | |
Permit Date: 2011-02-15 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.564553 | |
Longitude: -76.333475 |
Date | Event |
---|---|
2011-02-15 | New Permit Application |
2011-07-06 | Performed Spud Operation |
2011-09-29 | DEVIATED |
2011-12-15 | Perforation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-01-26 | 2012-01-26 | 8,391 | 5,637,660 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | 100 Mesh Sand | Proppant | Quartz | 14808-60-7 | 100.00 | 1.28 | ||
Plexslick 921 | Pumpco Services | Friction Reducer | 2-Propenoic acid, polymer with 2-propenamide | 9003-06-9 | 30.00 | 0.01 | ||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 40.00 | 0.01 | |||||
Water | 7732-18-5 | 30.00 | 0.01 | |||||
Plexbreak 145 | Pumpco Services | Non-Emulsifier | Coconut oil acid/Diethanolamine condensate (2:1) | 68603-42-9 | 10.00 | 0.00005000 | ||
2-Butoxyethanol | 111-76-2 | 15.00 | 0.00007000 | |||||
Methanol | 67-56-1 | 15.00 | 0.00007000 | |||||
Water | 7732-18-5 | 65.00 | 0.00029000 | |||||
Diethanolamine | 111-42-2 | 2.00 | 0.00001000 | |||||
Feriplex 40 - Acid - Additives | Pumpco Services | Iron Control Agent | Sodium hydroxide | 1310-73-2 | 1.00 | 0.00002000 | ||
Water | 7732-18-5 | 60.00 | 0.00102000 | |||||
Glycine, N,N-bis(carboxymethyl)-, trisodium salt | 5064-31-3 | 40.00 | 0.00068000 | |||||
Sodium sulfate | 7757-82-6 | 2.00 | 0.00003000 | |||||
Fresh Water | Carrier/Base Fluid | 70.45 | ||||||
Recycled Produced Water | Carrier/Base Fluid | 16.47 | ||||||
Acid HCL | Pumpco Services | Acid | Hydrochloric acid | 7647-01-0 | 15.00 | 0.04 | ||
Water | 7732-18-5 | 85.00 | 0.23 | |||||
B-84 | X-Chem | Antibacterial Agent | Ethanol | 64-17-5 | 4.00 | 0.00144000 | ||
Glutaraldehyde | 111-30-8 | 27.00 | 0.00975000 | |||||
Didecyl dimethyl ammonium chloride | 7173-51-5 | 8.00 | 0.00289000 | |||||
Quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 5.50 | 0.00199000 | |||||
Plexhib 256 | Pumpco Services | Corrosion Inhibitor | Ethoxylated C14-15 alcohols | 68951-67-7 | 30.00 | 0.00012000 | ||
Thiourea polymer | 68527-49-1 | 30.00 | 0.00012000 | |||||
Alkenes, C>10 .alpha.- | 64743-02-8 | 5.00 | 0.00002000 | |||||
Methanol | 67-56-1 | 60.00 | 0.00024000 | |||||
Propargyl alcohol | 107-19-7 | 10.00 | 0.00004000 | |||||
Ottawa Sand | Proppant | Quartz | 14808-60-7 | 100.00 | 11.41 | |||
SC30W | X-Chem | Scale Inhibitor | Sodium hydroxide | 1310-73-2 | 100.00 | 0.01 | ||
Sodium polyacrylate | 9003-04-7 | 100.00 | 0.01 | |||||
Methanol | 67-56-1 | 100.00 | 0.01 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHESAPEAKE APPALACHIA LLC | 723,484.00 | 66 | 0.00 | 0 | 0.00 | 0 |
2014 | CHESAPEAKE APPALACHIA LLC | 1,969,915.00 | 316 | 0.00 | 0 | 0.00 | 0 |
2015 | CHESAPEAKE APPALACHIA LLC | 290,701.00 | 70 | 0.00 | 0 | 0.00 | 0 |
2016 | CHESAPEAKE APPALACHIA LLC | 1,213,962.00 | 332 | 0.00 | 0 | 0.00 | 0 |
2017 | CHESAPEAKE APPALACHIA LLC | 842,382.00 | 342 | 0.00 | 0 | 0.00 | 0 |
2018 | CHESAPEAKE APPALACHIA LLC | 674,050.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CHESAPEAKE APPALACHIA LLC | 685,336.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CHESAPEAKE APPALACHIA LLC | Drilling Fluid Waste | 2,700.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHESAPEAKE APPALACHIA LLC | Drill Cuttings | 71.88 Tons | LANDFILL | THR029 |
2012 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 1,005.66 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHESAPEAKE APPALACHIA LLC | Fracing Fluid Waste | 732.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC008 |
2013 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 537.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHESAPEAKE APPALACHIA LLC | Drill Cuttings | 386.41 Tons | LANDFILL | 301626 |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 2,020.96 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 35.63 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2015 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 486.87 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 34.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC008 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 36.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 426.67 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 35.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 70.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 41.33 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 79.67 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 72.67 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 38.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 38.40 Bbl | REUSE (AT WELL PAD) | |
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 77.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR119 |
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 73.07 Bbl | REUSE (AT WELL PAD) | |
2018 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 179.70 Bbl | REUSE (AT WELL PAD) | |
2018 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 33.40 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2019 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 30.01 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2019 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 92.68 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2019 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 39.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
2019 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 34.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1955835 | Primary Facility | 2011-03-03 | Routine/Complete Inspection | No Violations Noted | |
1987092 | Primary Facility | 2011-07-07 | Drilling/Alteration | No Violations Noted | |
1992026 | Primary Facility | 2011-07-27 | Drilling/Alteration | No Violations Noted | 9 5/8 3226' |
1993774 | Primary Facility | 2011-08-03 | Drilling/Alteration | No Violations Noted | Nomac 246 . Currently at 13244. ETD is 14533'. KO - 7212' |
2172003 | Primary Facility | 2013-06-04 | Routine/Complete Inspection | No Violations Noted | |
2206412 | Primary Facility | 2013-09-19 | Routine/Complete Inspection | No Violations Noted | Insp for 'Inactive Status App.' |
2213423 | Primary Facility | 2013-10-16 | Follow-up Inspection | Pending | Talked to security. Comp man left @ about 8 AM and no work is being done at this time. |
2213445 | Primary Facility | 2013-10-15 | Follow-up Inspection | Pending | Comp man - Charlie Brown |
2218199 | Primary Facility | 2013-10-28 | Follow-up Inspection | No Violations Noted | No company man on site. Worked on well over the weekend. Mercer rig is still on site being repaired, probably move out tomorrow. |
2281385 | Primary Facility | 2014-06-10 | Routine/Complete Inspection | No Violations Noted | |
2296548 | Primary Facility | 2014-08-15 | Routine/Complete Inspection | No Violations Noted | |
2353400 | Primary Facility | 2015-03-19 | Routine/Complete Inspection | No Violations Noted | |
2385749 | Primary Facility | 2015-07-07 | Routine/Complete Inspection | No Violations Noted | Arrived @ 12:45 with OGI Andy Becher. 3 slot set-up with 3 wells drilled and in production. |
2477416 | Primary Facility | 2016-04-19 | Routine/Complete Inspection | No Violations Noted | |
2485460 | Primary Facility | 2016-05-18 | Routine/Complete Inspection | No Violations Noted | Vegetative cover on site greater than 70% and consisting of mainly perennial plant species. Temporary erosion and sediment control BMPs have been removed, with the exception of areas to be disturbed during installation of post-construction stormwater management (PCSM) measures. No evidence of accelerated erosion or sedimentation was observed.
A 2-year extension of time for site restoration was approved by the Department on 01/20/2016. As a condition of this approval, PCSM features must be installed by 10/20/2016. At the time of inspection preparation for construction of such features was underway. No violations were cited during this inspection. |
2487693 | Primary Facility | 2016-05-19 | Routine/Complete Inspection | No Violations Noted | |
2561744 | Primary Facility | 2017-02-15 | Routine/Complete Inspection | No Violations Noted | No issues identified and no violations cited. |
2594956 | Primary Facility | 2017-05-11 | Routine/Complete Inspection | No Violations Noted | |
2679258 | Primary Facility | 2018-01-08 | Routine/Complete Inspection | No Violations Noted | Three wells in production phase. Three each sand and water separators. No leaks detected from production equipment. No violations noted |
2696370 | Primary Facility | 2018-02-21 | Routine/Complete Inspection | No Violations Noted | Arrived at 13:10. Weather: unseasonably warm, windy, overcast. well set-up with 3 wells drilled and in production.Well tender Giovanni arrived while I was onsite.
Norconk 2H, 015-21554. Top digital gauge: 997 psi, 13-3/8" x 9-5/8" digital, plumbed into produced water tanks: 10.1 psi, 9-5/8" x 5-1/2": 143.95, 5-1/2" x tubing: 61.6 psi., water-filled cellar no bubbles. Norconk 6H, 015-21540, top gauge digital: 1159 psi, 13-3/8" x 9-5/8": digital, plumbed into produced water tanks: 5.62 psi, 9-5/8" x 5-1/2": 6.86psi, 5-1/2? x tubing: 47 psi. Norconk 5H, 015-21562. top gauge digital: 999.58 psi, 13-3/8" x 9-5/8": digital, plumbed into produced water tanks: 8.75 psi, 9-5/8" x 5-1/2": 8.62 psi, 5-1/2" x tubing: 32.66 psi. , water-filled cellar, no bubbles |
2736713 | Primary Facility | 2018-06-01 | Follow-up Inspection | No Violations Noted | Arrived at 8:00 for the conclusion of 72-hour pressure buildup tests on the 3 producing wells. Met with: Giovanni Dicupillo (Chesapeake) and Shana Erway and Sean (Leidos) to split isotopic gas samples from the 13-3/8" x 9-5/8" and 9-5/8" x 5-1/2" annuli of each well. Annuli had been shut-in on Tuesday, May29 at: 2H - 7:10, 5H - 7:15, 6H - 7:20.
2H: 13-3/8" x 9-5/8" 1psi @ 8:20, 5% methane, 201806012371g01 collected @ 8:20. 9-5/8" x 5-1/2" 16 psi @ 8:30, 78% methane 201806012371g02 collected @ 8:30. 5H 13-3/8" x 9-5/8" 2psi, @ 8:35, 22% methane, 201806012371g03 collected @ 8:35. 9-5/8" x 5-1/2" 6psi @ 8:40, 61% methane 201806012371g04, collected @ 8:40. 6H: 13-3/8" x 9-5/8" 1psi @ 8:50, 72% methane, 201806012371g05, collected @ 8:50. 9-5/8" x 5-1/2" 0 psi @ 9:00, 36% methane 201806012371g06, collected @9:00. During the 6H sampling, a group of bubbles were seen, approximately 3 times, with an interval of 5 to 10 minutes between bubble episodes. Over the next hour, no bubbling was observed. |
2737882 | Primary Facility | 2018-06-05 | Administrative/File Review | No Violations Noted | The eSubmission Post Drilling Site Restoration Report was submitted to the DEP on 6/5/2018. Based on inspection report 2679260 the Post Drilling Restoration report was accepted on 6/5/2018. |
2837300 | Primary Facility | 2019-02-06 | Routine/Complete Inspection | No Violations Noted | Arrived onsite for a routine inspection at 13:20; the weather was ~40°F, breezy, and raining. The gate was open when I arrived.
There were 3 properly tagged Marcellus wells staged for production. The cellars were filled with water; no bubbling was observed. There were 3 GPUs and sand separators onsite, and 2 produced water tanks onsite and in secondary containment. Overall, the site was greater than 70% vegetative cover. There appeared to be 2 infiltration areas constructed near the northeast and southeast corners of the pad. There were 2 very small areas of bare soil on the containment berm (Photos #2, 3). The Department recommends removing the oak stakes as they are no longer needed (Photos #6, 7). No violations noted. |
For data sources see[8]