If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-015-22114 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.65975,"lon":-76.188461,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Bradford | |
Municipality: Tuscarora Township | |
Operator Name: CHESAPEAKE APPALACHIA LLC | |
Well Pad ID: 148357 | |
Farm/Lease Name: FOLTA N BRA 2H | |
License Status: | |
Spud Date: | |
Permit Date: 2012-02-02 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.659750 | |
Longitude: -76.188461 |
Date | Event |
---|---|
2012-02-02 | New Permit Application |
2012-02-09 | Performed Spud Operation |
2012-05-13 | Perforation |
2012-08-16 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-05-25 | 2012-05-25 | 6,986 | 4,838,778 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Recycled Produced Water | Carrier/Base Fluid | 22.53 | |||||
SC-30 | X-Chem | Scale Inhibitor | Sodium polyacrylate | 9003-04-7 | 100.00 | 0.00903000 | ||
Fresh Water | Carrier/Base Fluid | 63.54 | ||||||
L058 | Schlumberger | Iron Control Agent | Sodium erythorbate | 6381-77-7 | 100.00 | 0.00018000 | ||
B-84 | X-Chem | Antibacterial Agent | Didecyl dimethyl ammonium chloride | 7173-51-5 | 8.00 | 0.00220000 | ||
Glutaraldehyde | 111-30-8 | 27.00 | 0.00744000 | |||||
Ethanol | 64-17-5 | 4.00 | 0.00110000 | |||||
Quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 5.50 | 0.00152000 | |||||
A264 Corrosion Inhibitor | Schlumberger | Corrosion Inhibitor | Aliphatic acid | 30.00 | 0.00012000 | |||
Aliphatic alcohols, ethoxylated # 1 | 30.00 | 0.00012000 | ||||||
Methanol | 67-56-1 | 40.00 | 0.00016000 | |||||
Propargyl alcohol | 107-19-7 | 10.00 | 0.00004000 | |||||
Ottawa Sand | Proppant | Quartz | 14808-60-7 | 100.00 | 12.20 | |||
J609 | Schlumberger | Friction Reducer | Aliphatic amine polymer | 30.00 | 0.02 | |||
Ammonium sulfate | 7783-20-2 | 30.00 | 0.02 | |||||
Acid, Hydrochloric 15pct | Schlumberger | Acid | Water | 7732-18-5 | 85.00 | 0.21 | ||
Hydrochloric acid | 7647-01-0 | 15.00 | 0.03 | |||||
100 Mesh Sand | Proppant | Quartz | 14808-60-7 | 100.00 | 1.35 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | CHESAPEAKE APPALACHIA LLC | 981,127.00 | 111 | 0.00 | 0 | 0.00 | 0 |
2013 | CHESAPEAKE APPALACHIA LLC | 3,760,723.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CHESAPEAKE APPALACHIA LLC | 2,581,696.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | CHESAPEAKE APPALACHIA LLC | 904,959.00 | 198 | 0.00 | 0 | 0.00 | 0 |
2016 | CHESAPEAKE APPALACHIA LLC | 869,776.00 | 178 | 0.00 | 0 | 0.00 | 0 |
2017 | CHESAPEAKE APPALACHIA LLC | 1,472,854.00 | 217 | 0.00 | 0 | 0.00 | 0 |
2018 | CHESAPEAKE APPALACHIA LLC | 1,696,420.00 | 345 | 0.00 | 0 | 0.00 | 0 |
2019 | CHESAPEAKE APPALACHIA LLC | 1,171,307.00 | 357 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CHESAPEAKE APPALACHIA LLC | Drill Cuttings | 158.29 Tons | LANDFILL | 8-0728-0004/013 |
2012 | CHESAPEAKE APPALACHIA LLC | Drilling Fluid Waste | 1,047.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 1,848.33 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CHESAPEAKE APPALACHIA LLC | Drill Cuttings | 1,164.86 Tons | LANDFILL | THR029 |
2013 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 722.90 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 378.58 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 102.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC008 |
2015 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 144.09 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 27.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2016 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 382.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2016 | CHESAPEAKE APPALACHIA LLC | Fracturing Fluid Waste | 163.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 273.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 27.88 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2016 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 742.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHESAPEAKE APPALACHIA LLC | Fracturing Fluid Waste | 88.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2016 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 62.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 27.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2016 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 1,128.13 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2016 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 28.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2016 | CHESAPEAKE APPALACHIA LLC | Waste Water Treatment Sludge | 15.33 Tons | LANDFILL | 301626 |
2016 | CHESAPEAKE APPALACHIA LLC | Synthetic Liner Materials | 0.75 Tons | LANDFILL | 8-0728-0004/013 |
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 41.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 4.70 Bbl | REUSE (AT WELL PAD) | |
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 18.70 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 3.40 Bbl | REUSE (AT WELL PAD) | |
2018 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 63.90 Bbl | REUSE (AT WELL PAD) | |
2018 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 3.40 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2018 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 5.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2018 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 14.20 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 3.40 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | CHESAPEAKE APPALACHIA LLC | Waste Water Treatment Sludge | 3.39 Tons | LANDFILL | 301626 |
2019 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 1.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2019 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 16.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 51.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2019 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 18.34 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE003 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2044823 | Primary Facility | 2012-02-16 | Drilling/Alteration | No Violations Noted | no one on site. 20" cond set. |
2057212 | Primary Facility | 2012-04-04 | Drilling/Alteration | No Violations Noted | NOMAC 247, Comp. man - Jack Goodman, checked drillers log, at 902' |
2061109 | Primary Facility | 2012-04-19 | Drilling/Alteration | No Violations Noted | NOMAC 247, Comp. Man - Joe Foerste, checked drillers log - @ 9126' |
2064993 | Primary Facility | 2012-05-03 | Routine/Complete Inspection | No Violations Noted | Rig has moved off. Still cleaning up site. 1 empty cellar and 2 wells. |
2112903 | Primary Facility | 2012-11-01 | Complaint Inspection | Pending | |
2113775 | Primary Facility | 2012-11-06 | Follow-up Inspection | Pending | |
2127789 | Primary Facility | 2013-01-03 | Follow-up Inspection | Pending | |
2184245 | Primary Facility | 2013-07-11 | Routine/Complete Inspection | No Violations Noted | |
2373018 | Primary Facility | 2013-07-11 | Drilling/Alteration | No Violations Noted | : Arrived @ 10:50., cloudy and comfortable. Wireline, vac and skid steer on site. Met with onsite supervisor Joey Pearson. For the Folta N Bra 2H, the wireline was setting plugs inside tubing using a lubricator and wireline BOP. At the time of my inspection, wireline was setting the first plug and vac truck was vaccing puddles on the pad. Work was being done on Folta N Bra 2H and then would be done on the Folta S Bra 2H before the NOMAC 75 arrived onsite to drill more wells. Further work planned was to also remove packer and tubing. This would require the workover rig and snubbing unit (from Makayla). Vince Engbith was also on site to lay down containment in prep for NOMAC 75. Left at 11:45. |
2373020 | Primary Facility | 2015-05-21 | Drilling/Alteration | No Violations Noted | : Arrived @ 10:50., cloudy and comfortable. Wireline, vac and skid steer on site. Met with onsite supervisor Joey Pearson. For the Folta N Bra 2H, the wireline was setting plugs inside tubing using a lubricator and wireline BOP. At the time of my inspection, wireline was setting the first plug and vac truck was vaccing puddles on the pad. Work was being done on Folta N Bra 2H and then would be done on the Folta S Bra 2H before the NOMAC 75 arrived onsite to drill more wells. Further work planned was to also remove packer and tubing. This would require the workover rig and snubbing unit (from Makayla). Vince Engbith was also on site to lay down containment in prep for NOMAC 75. Left at 11:45. |
2387094 | Primary Facility | 2015-07-07 | Drilling/Alteration | No Violations Noted | Well drilled and in production. Shut-in at time of inspection. |
2391494 | Primary Facility | 2015-07-02 | Routine/Complete Inspection | No Violations Noted | Nomac Drilling Rig #75 is currently in the process of drilling the vertical section of the Folta S Bra 1H at a depth of (3,609) feet. In the backyard area, I observed residue on the containment covering the site perimeter berm and vegetation on the top of the berm at the top of the site cut slope. The residue is grayish in color and appears to be drill cuttings mixed with lime as part of the Pug mill process, either overtopping the containers storing the cuttings or the cuttings being transported out of the containers by wind. Lime is utilized as a drying agent for the cuttings. Fluid levels in (2) containers on containment in the backyard appear to exceed the (2)’ freeboard requirement of Title 25, Env. Protection, Pa. code 78.56. The containers contain storm water accumulated on containment and drilling wastewater according to Mr. Hooper. |
2397664 | Primary Facility | 2015-08-03 | Follow-up Inspection | No Violations Noted | This is a producing well shut-in while new wells were being drilled. Of the new wells: Chesapeake reported bubbles in cellars of S Bra 1H, S Bra 3H. Confirmed bubbling, unable to ID gas. |
2398518 | Primary Facility | 2015-08-05 | Follow-up Inspection | No Violations Noted | |
2418210 | Primary Facility | 2015-10-19 | Follow-up Inspection | No Violations Noted | Folta N Bra 2H |
2445138 | Primary Facility | 2016-01-27 | Follow-up Inspection | No Violations Noted | Folta N Bra 2H: in production
Cellar water-filled, no bubbling.Tubing: 1243 psi (digital) 13-3/8” x 9-5/8” venting to 2” check valve –no methane detected 9-5/8” x 5-1/2” -- plumbed into pressure relief valve – 42.2 psi (digital) Note: The pressure relief valve was set to open for 5 seconds every 30 minutes resulting in a pressure of approximately of approximately 50 psi in the 5-1/2" X 9-5/8" annulus, according to Charlie Olmsted. |
2448270 | Primary Facility | 2016-02-01 | Routine/Complete Inspection | No Violations Noted | |
2477363 | Primary Facility | 2016-04-19 | Follow-up Inspection | No Violations Noted | |
2529251 | Primary Facility | 2016-10-05 | Routine/Complete Inspection | No Violations Noted | I conducted an inspection of the site accompanied by Andrew Hobbins, DEP O&G WQS of NCRO in Williamsport. Chesapeake submitted a stimulation notice to the Department on 9/16/16. The notice indicated that CHK would be moving to the Folta Pad between 6:00 AM and 12:00 PM from 9/19/16 to 9/20/16. The Folta S Bra 1H, Folta S Bra 3H, Folta N Bra 3H and Hattie N Bra 3H wells will be stimulated. A coil tubing unit is on the location. We met with Ashley Adcock and Tim Long, completions consultants of Chesapeake. Mr. Adcock and Mr. Long stated the following. "The coil tubing unit is in the process of cleaning out sand in the Folta S Bra 1H well. The well has had some issues after the frac was completed. Frac operations will resume when the sand cleanout of the well is completed. The secondary containment is Jersey Barriers, Rig Mats with A (30) mil liner below the mats and a layer of felt below the liner. There are no wells in production. They are shut in. The Folta N Bra 2H and S Bra 2H were in production |
2545755 | Primary Facility | 2016-12-13 | Routine/Complete Inspection | No Violations Noted | Arrived @ 09:40, weather: sunny, snow on the ground. There were 6 wells on site. The four wells drilled in 2015 had recently been fracced. All were shut-in at the time of my inspection. Onsite were workers with ESSi Corp, AMI, and Control Tech. Spoke with Tad Gonzales (Essi Corp) who was installing remote instrumentation at the time of my inspection. For this inspection, accessible annular vents were monitored using an Altair 5X gas meter calibrated on 12/6/16.
Folta N Bra 2H: Cellar water-filled, 13-3/8” x 9-5/8” venting to 2” check valve –no methane detected 9-5/8” x 5-1/2” -- plumbed into pressure relief valve |
2547234 | Primary Facility | 2016-12-07 | Routine/Complete Inspection | No Violations Noted | |
2637656 | Primary Facility | 2017-09-18 | Routine/Complete Inspection | No Violations Noted | On September 18, 2017, the Department conducted a routine inspection at the Chesapeake Appalachia LLC, Folta Location in Tuscarora Township, Bradford County. Andrew Hobbins represented the Department. Nobody was present for Chesapeake.
The site sign, E & S plan and weekly inspection logs were on site and available for review. The site was stabilized with a combination of rock and vegetation. No erosion issues were observed. PCSM has not been addressed at the site. Six wells were in production during the inspection and all six were labeled. Six GPUs and two production tanks were also on site. Puddles on the well pad surface were low in specific conductivity. No staining was observed. No violations were observed during the inspection. |
2670113 | Primary Facility | 2017-12-05 | Routine/Complete Inspection | No Violations Noted | Arrived at 12:00. Weather: rain. 6 wells in production. Well heads and flow lines recently painted white. Not possible to check for annular gas.
South 2H: top gauge: 1541.8 psi (digital), North 2H: top gauge: 1230.4 North 3H, top gauge: 1380 psi, minor bubbling at threads of 2" bull plug on surface casing dump line. Verifiedmethane with Altair 5X gas meter and called to inform Eric Hottenstein. Hattie N Bra 3H: 2390 top gauge, Folta S Bra 1H: couldn't read top gauge.,Folta S Bra 3H: couldnt read. |
2787900 | Primary Facility | 2018-10-05 | Routine/Complete Inspection | No Violations Noted | Arrived onsite for a routine inspection. The areas around the well pad were well vegetated or rock lined. No E&S issues were observed.
There are 6 properly tagged Marcellus wells staged for production. There are 6 each GPUs and sand separators onsite and in secondary containment. There is 1 double walled fiberglass produced water tank onsite. It may be advisable to maintain a more traditional secondary containment to avoid issues while emptying produced water tanks. PCSM/SR plans depict 2 compost filter sock (CFS) sediment traps on the east side of the pad (Photos #2, 3). At the time on inspection some water was being retained in these areas but no CFS was evident. An email was sent to Eric Haskins to check the status of PCSM. An email received from Eric on 10/11/18 stated that PCSM has not yet been constructed. Chesapeake is currently addressing uncompleted PCSM on several sites. No violations noted. |
2816843 | Primary Facility | 2018-12-17 | Routine/Complete Inspection | No Violations Noted | Wells shut in for pressure build up test (PBT).
Cool windy at time of inspection. |
2818013 | Primary Facility | 2018-12-20 | Routine/Complete Inspection | No Violations Noted | Wells shut in for pressure build up test (PBT).
Cool windy at time of inspection. On site with leidos and chesapeake to collect gas samples from annulus vents, and record pressures on annulus vents after 72 HR pressure build up test. |
For data sources see[8]