If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-015-22271 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.645253,"lon":-76.829764,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Bradford | |
Municipality: Canton Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 146777 | |
Farm/Lease Name: ROMISOUKAS UNIT 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2012-09-17 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.645253 | |
Longitude: -76.829764 |
Date | Event |
---|---|
2012-09-17 | New Permit Application |
2012-12-27 | Performed Spud Operation |
2013-04-16 | Perforation |
2014-01-27 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-04-26 | 2013-04-26 | 6,415 | 4,787,622 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Bactron K-139 | Champion Technologies | Biocide | Glutaraldehyde | 111-30-8 | 5.0 | 0.04 | |
Sand (Proppant) | Halliburton | Propping Agent | Crystalline Silica | 14808-60-7 | 99.9 | 35.0 | ||
(FRW-66) | Halliburton | Friction Reducer | Hydrotreated Light Distillate | 64742-47-8 | 30.0 | 0.07 | ||
Gyptron T-390 | Champion Technologies | Scale Inhibitor | Methanol | 67-56-1 | 10.0 | 0.01 | ||
Water | Provided By Customer | Base Fluid | Fresh Water | 100.0 | 64.35 | |||
Hydrochloric Acid 28 | Halliburton | Acid | Hydrogen Chloride | 7647-01-0 | 30.0 | 0.53 | ||
BA-40L | Halliburton | Buffering Agent | Potassium carbonate | 584-08-7 | 60.0 | 0.004 | ||
Ethanol | 64-17-5 | 5.0 | None | |||||
Water | 7732-18-5 | 85.0 | None | |||||
Quaternary ammonium compounds, benzyl-C-12-16 alkyldimethyl, chlorides |
68424-85-1 | 10.0 | None |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | CHIEF OIL & GAS LLC | 93,654.00 | 21 | 0.00 | 0 | 0.00 | 0 |
2015 | CHIEF OIL & GAS LLC | 662,279.87 | 353 | 0.00 | 0 | 0.00 | 0 |
2016 | CHIEF OIL & GAS LLC | 422,842.69 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | CHIEF OIL & GAS LLC | 360,679.33 | 359 | 0.00 | 0 | 0.00 | 0 |
2018 | CHIEF OIL & GAS LLC | 303,052.55 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | CHIEF OIL & GAS LLC | 258,819.78 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 120.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123 |
2013 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 2,665.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 209.71 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW018 |
2013 | CHIEF OIL & GAS LLC | Drill Cuttings | 1,072.82 Tons | LANDFILL | 301358 |
2013 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 94.81 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NC006 |
2014 | CHIEF OIL & GAS LLC | Produced Fluid | 1,909.65 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHIEF OIL & GAS LLC | Produced Fluid | 18,436.36 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHIEF OIL & GAS LLC | Produced Fluid | 6,223.40 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 2,806.68 Bbl | REUSE (AT WELL PAD) | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 423.14 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 1,742.32 Bbl | REUSE (AT WELL PAD) | |
2019 | CHIEF OIL & GAS LLC | Produced Fluid | 2,058.88 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2115576 | Primary Facility | 2012-11-14 | Routine/Complete Inspection | No Violations Noted | |
2133534 | Primary Facility | 2013-01-25 | Routine/Complete Inspection | No Violations Noted | |
2138393 | Primary Facility | 2013-02-11 | Routine/Complete Inspection | No Violations Noted | |
2142717 | Primary Facility | 2013-02-26 | Routine/Complete Inspection | No Violations Noted | |
2167525 | Primary Facility | 2013-05-20 | Routine/Complete Inspection | No Violations Noted | |
2204045 | Primary Facility | 2013-09-12 | Routine/Complete Inspection | No Violations Noted | |
2497068 | Primary Facility | 2016-06-29 | Routine/Complete Inspection | No Violations Noted | Routine Inspection Conducted on 6/29/2016. Arrived: 14:25 Departed: 15:00.
The 1H well was in a production stage. No leaks detected from equipment. The pad surface has been partly vegetated in the areas of the well pad surface not needed for production. A small riffle developed starting from the pad surface and proceeding down the access road. No impact to water bodies and no silt run-off detected. No violations noted at this time. Margaret Farrell with Chief Oil and Gas will be contacted by phone on 6/30/2016 to discuss the access road erosion. |
2612934 | Primary Facility | 2017-07-07 | Routine/Complete Inspection | No Violations Noted | Inspection to assess overall site conditions. No issues identified and no violations cited. |
2722156 | Primary Facility | 2018-04-24 | Routine/Complete Inspection | No Violations Noted | Arrived at 12:30. Weather: warm and sunny. One well in production. No methane was detected at the mouth of the 550-gallon polytank. No violations were observed at the time of this inspection. |
2831874 | Primary Facility | 2019-01-25 | Routine/Complete Inspection | No Violations Noted | Routine inspection to assess overall site condition. Site was snow-covered at the time of inspection. One well is staged for production with well tag. Well cellar is filled with gravel. One steel produced water tank with steel containment with spray-in lining. One GPU is present within containment. GPU and containment are in good condition. An unlabeled plastic container is present next to the well head.
No violations noted. |
For data sources see[8]