If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-015-22405 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.568244,"lon":-76.548686,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Bradford | |
Municipality: Overton Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 147405 | |
Farm/Lease Name: P CULLEN UNIT | |
License Status: | |
Spud Date: | |
Permit Date: 2013-01-03 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.568244 | |
Longitude: -76.548686 |
Date | Event |
---|---|
2013-01-03 | New Permit Application |
2013-10-24 | Permit Renewal Application |
2014-06-20 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-12-02 | 2014-12-10 | 7,806 | 10,692,600 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Hydrochloric Acid 10-30% | Halliburton | Acid | Hydrochloric Acid | 7647-01-0 | 30 | 0.1 | 0 |
MCS-2510T | MULTI-CHEM | Scale Inhibitor | ETHYLENE GLYCOL | 107-21-1 | 60 | 0.01 | 0 | |
Water | Provided by Customer | Base Fluid | Fresh Water | 0000-00-0 | 100 | 99.891 | 0 | |
MCB-8614 | MULTI-CHEM | BIOCIDE | GLUTARALDEHYDE | 111-30-8 | 30 | 0.02 | 0 | |
ALKYL (C12-16) DIMETHYLBENZXYLAMMONIUM CHLORIDE | 68424-85-1 | 5 | 0.003 | 0 | ||||
FR-66 | Halliburton | Friction Reducer | Hydrotreated Light Petroleum Distillate | 64742-47-8 | 30 | 0.03 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | CHIEF OIL & GAS LLC | 67,255.00 | 11 | 0.00 | 0 | 0.00 | 0 |
2015 | CHIEF OIL & GAS LLC | 2,356,644.73 | 360 | 0.00 | 0 | 0.00 | 0 |
2016 | CHIEF OIL & GAS LLC | 1,631,321.48 | 358 | 0.00 | 0 | 0.00 | 0 |
2017 | CHIEF OIL & GAS LLC | 1,325,860.21 | 344 | 0.00 | 0 | 0.00 | 0 |
2018 | CHIEF OIL & GAS LLC | 1,135,434.65 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CHIEF OIL & GAS LLC | 1,039,220.14 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 60.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2014 | CHIEF OIL & GAS LLC | Drill Cuttings | 859.65 Tons | LANDFILL | 100933 |
2014 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 11,712.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 3,012.76 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2014 | CHIEF OIL & GAS LLC | Produced Fluid | 2,276.73 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHIEF OIL & GAS LLC | Drill Cuttings | 318.29 Tons | LANDFILL | 301358 |
2015 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 11,848.98 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHIEF OIL & GAS LLC | Produced Fluid | 16,331.82 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 420.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2016 | CHIEF OIL & GAS LLC | Produced Fluid | 3,888.73 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 238.14 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 1,683.83 Bbl | REUSE (AT WELL PAD) | |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 710.83 Bbl | REUSE (AT WELL PAD) | |
2019 | CHIEF OIL & GAS LLC | Produced Fluid | 1,360.44 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2137754 | Primary Facility | 2013-01-31 | Routine/Partial Inspection | No Violations Noted | |
2168880 | Primary Facility | 2013-05-22 | Routine/Partial Inspection | No Violations Noted | |
2268886 | Primary Facility | 2014-04-02 | Routine/Complete Inspection | No Violations Noted | |
2291206 | Primary Facility | 2014-07-24 | Routine/Complete Inspection | No Violations Noted | |
2303824 | Primary Facility | 2014-09-12 | Routine/Complete Inspection | No Violations Noted | |
2500768 | Primary Facility | 2016-07-04 | Routine/Complete Inspection | No Violations Noted | |
2508580 | Primary Facility | 2016-08-08 | Routine/Complete Inspection | No Violations Noted | |
2549031 | Primary Facility | 2017-01-04 | Routine/Complete Inspection | No Violations Noted | Rig matting and empty production storage tanks located on wellsite. One well is in production phase. One well recently drilled. No violations noted. |
2577026 | Primary Facility | 2017-03-30 | Routine/Complete Inspection | No Violations Noted | I arrived on-site @ 11:15 hrs and met Dale Graham, Chief company man. Frac was completed on 3/29; crews on location were swapping frac trees on wells for production trees. The 2H had the production head on and was tagged, and the 1H was having the production tree installed. Production crew will be moving on today or tomorrow to begin flowback operations. I departed @ 11:45 hrs. |
2736083 | Primary Facility | 2018-05-31 | Routine/Complete Inspection | No Violations Noted | Two wells staged for production phase. Two water separators. No leaks detected from production equipment. No violations noted. |
For data sources see[8]