If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-015-22741 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.785358,"lon":-76.165233,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Bradford | |
Municipality: Stevens Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 149607 | |
Farm/Lease Name: YANAVITCH UNIT | |
License Status: Active | |
Spud Date: | |
Permit Date: 2013-09-23 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.785358 | |
Longitude: -76.165233 |
Date | Event |
---|---|
2013-09-23 | New Permit Application |
2014-06-11 | Performed Spud Operation |
2014-11-12 | Perforation |
2014-11-12 | Performed Stage 1 of Stimulation |
2014-11-12 | Performed Stage 2 of Stimulation |
2014-11-13 | Perforation |
2014-11-13 | Performed Stage 3 of Stimulation |
2014-11-13 | Performed Stage 4 of Stimulation |
2014-11-13 | Performed Stage 5 of Stimulation |
2014-11-14 | Perforation |
2014-11-14 | Performed Stage 6 of Stimulation |
2014-11-14 | Performed Stage 7 of Stimulation |
2014-11-14 | Performed Stage 8 of Stimulation |
2014-11-15 | Perforation |
2014-11-15 | Performed Stage 10 of Stimulation |
2014-11-15 | Performed Stage 11 of Stimulation |
2014-11-15 | Performed Stage 12 of Stimulation |
2014-11-15 | Performed Stage 13 of Stimulation |
2014-11-15 | Performed Stage 9 of Stimulation |
2014-11-16 | Perforation |
2014-11-16 | Performed Stage 14 of Stimulation |
2014-11-16 | Performed Stage 15 of Stimulation |
2014-11-16 | Performed Stage 16 of Stimulation |
2014-11-17 | Perforation |
2014-11-17 | Performed Stage 17 of Stimulation |
2014-11-17 | Performed Stage 18 of Stimulation |
2014-11-17 | Performed Stage 19 of Stimulation |
2014-11-18 | Perforation |
2014-11-18 | Performed Stage 20 of Stimulation |
2014-11-18 | Performed Stage 21 of Stimulation |
2014-11-18 | Performed Stage 22 of Stimulation |
2014-11-18 | Performed Stage 23 of Stimulation |
2014-11-19 | Performed Stage 24 of Stimulation |
2019-02-12 | Deviated |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-11-12 | 2014-11-18 | 6,264 | 7,939,970 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Gyptron T-390 | Champion Technologies | Scale Inhibitor | Methanol | 67-56-1 | 10 | 0.001 | 0 |
Water | Provided by Customer | Base Fluid | Fresh Water | 0000-00-0 | 100 | 99.91 | 0 | |
Hydrochloric Acid | Universal | Acid | Hydrochloric Acid | 7647-01-0 | 37 | 0.1 | 0 | |
Bactron K-139 | Champion Technologies | Biocide | Quaternary ammonium compounds, benzyl-C-12-16 alkyldimethyl, chlorides |
68424-85-1 | 10 | 0.004 | 0 | |
Ethanol | 64-17-5 | 5 | 0.002 | 0 | ||||
Glutaraldehyde | 111-30-8 | 5 | 0.002 | 0 | ||||
Unislik ST 50 | Universal | Friction Reducer | Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.02 | 0 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2014-11-12 | 1 | Sand | 3,723,939 | 7,331 | 8,657 |
2014-11-12 | 2 | Sand | 3,723,939 | 7,321 | 8,572 |
2014-11-13 | 3 | Sand | 3,723,939 | 6,918 | 7,583 |
2014-11-13 | 4 | Sand | 3,723,939 | 7,203 | 7,768 |
2014-11-13 | 5 | Sand | 3,723,939 | 7,111 | 7,620 |
2014-11-14 | 6 | Sand | 3,723,939 | 7,215 | 7,703 |
2014-11-14 | 7 | Sand | 3,723,939 | 6,959 | 7,825 |
2014-11-14 | 8 | Sand | 3,723,939 | 7,048 | 8,813 |
2014-11-15 | 9 | Sand | 3,723,939 | 7,080 | 7,682 |
2014-11-15 | 10 | Sand | 3,723,939 | 6,804 | 7,220 |
2014-11-15 | 11 | Sand | 3,723,939 | 6,794 | 7,402 |
2014-11-15 | 12 | Sand | 3,723,939 | 6,487 | 6,894 |
2014-11-15 | 13 | Sand | 3,723,939 | 6,802 | 7,467 |
2014-11-16 | 14 | Sand | 3,723,939 | 6,447 | 7,200 |
2014-11-16 | 15 | Sand | 3,723,939 | 6,750 | 7,002 |
2014-11-16 | 16 | Sand | 3,723,939 | 6,560 | 7,012 |
2014-11-17 | 17 | Sand | 3,723,939 | 6,343 | 6,692 |
2014-11-17 | 18 | Sand | 3,723,939 | 6,290 | 7,050 |
2014-11-17 | 19 | Sand | 3,723,939 | 6,292 | 6,674 |
2014-11-18 | 20 | Sand | 3,723,939 | 6,707 | 6,859 |
2014-11-18 | 21 | Sand | 3,723,939 | 6,395 | 7,136 |
2014-11-18 | 22 | Sand | 3,723,939 | 6,374 | 7,086 |
2014-11-18 | 23 | Sand | 3,723,939 | 6,374 | 7,142 |
2014-11-19 | 24 | Sand | 3,723,939 | 7,799 | 9,069 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | CHIEF OIL & GAS LLC | 1,854,714.05 | 318 | 0.00 | 0 | 0.00 | 0 |
2016 | CHIEF OIL & GAS LLC | 1,853,147.89 | 302 | 0.00 | 0 | 0.00 | 0 |
2017 | CHIEF OIL & GAS LLC | 1,960,105.40 | 360 | 0.00 | 0 | 0.00 | 0 |
2018 | CHIEF OIL & GAS LLC | 1,099,589.87 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CHIEF OIL & GAS LLC | 850,426.57 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 90.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2014 | CHIEF OIL & GAS LLC | Drill Cuttings | 606.59 Tons | LANDFILL | 100933 |
2014 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 110.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2014 | CHIEF OIL & GAS LLC | Drill Cuttings | 19.54 Tons | LANDFILL | 301358 |
2015 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 2,947.05 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHIEF OIL & GAS LLC | Produced Fluid | 5,208.40 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015 | CHIEF OIL & GAS LLC | Fracing Fluid Waste | 90.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2016 | CHIEF OIL & GAS LLC | Fracturing Fluid Waste | 48.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123 |
2016 | CHIEF OIL & GAS LLC | Produced Fluid | 1,288.91 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 1,001.76 Bbl | REUSE (AT WELL PAD) | |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 137.30 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 370.35 Bbl | REUSE (AT WELL PAD) | |
2019 | CHIEF OIL & GAS LLC | Produced Fluid | 360.10 Bbl | REUSE (AT WELL PAD) |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2284859 | Primary Facility | 2014-07-03 | Routine/Complete Inspection | No Violations Noted | |
2285869 | Primary Facility | 2014-06-25 | Routine/Complete Inspection | No Violations Noted | Highlands Drilling Rig #7 is the active drilling rig at the location. The current drilling depth for the Yanavitch Unit 2H well is (2,594) feet. The fluid level in the 3rd tank, which is at tank storing drilling fluid, was close to exceeding the the (2)’ freeboard requirement of Title 25, Env. Protection, Pa. code 78.56. Mr. Rogers stated that the fluid level in this tank would be drawn down and continously monitored. |
2285871 | Primary Facility | 2014-06-25 | Routine/Complete Inspection | No Violations Noted | Highlands Drilling Rig #7 is the active drilling rig at the location. The current drilling depth for the Yanavitch Unit 2H well is (2,594) feet. The fluid level in the 3rd tank, which is at tank storing drilling fluid, was close to exceeding the the (2)’ freeboard requirement of Title 25, Env. Protection, Pa. code 78.56. Mr. Rogers stated that the fluid level in this tank would be drawn down and continously monitored. |
2289646 | Primary Facility | 2014-07-23 | Routine/Complete Inspection | No Violations Noted | |
2302847 | Primary Facility | 2014-09-03 | Routine/Complete Inspection | No Violations Noted | |
2327125 | Primary Facility | 2014-12-04 | Routine/Complete Inspection | No Violations Noted | I met with Gilbert Blevins, Company Man and consultant of Chief. An Integrated Production Services (IPS) coiled tubing unit is currently on the location in the process of drilling out frac plugs on the 5H well. The current drilling depth is (8,700) feet. The unit arrived at the location on 12/3/14. Frac plugs will be drilled out on the 2H-5H wells over the course of the next week or so, according to Mr. Blevins. The 1H well is in the production phase operations. While surveying the site, I observed a few areas of compromised liner integrity and sections of the containment berm not completely secured. The containment for the light tower in the corner of the Pad where the production fluids tanks will be stored was not properly secured, along with the containment for the generator next to the Company Man’s trailer. Mr. Blevins stated to me that he would patch any holes in the containment and secure the sections of the containment berm and the containment for the light tower and generator as soon as possible. |
2333421 | Primary Facility | 2014-12-12 | Routine/Partial Inspection | No Violations Noted | |
2345800 | Primary Facility | 2015-02-18 | Routine/Partial Inspection | No Violations Noted | |
2350493 | Primary Facility | 2015-03-10 | Routine/Complete Inspection | No Violations Noted | |
2352740 | Primary Facility | 2015-03-12 | Routine/Complete Inspection | No Violations Noted | |
2365251 | Primary Facility | 2015-04-28 | Incident- Response to Accident or Event | No Violations Noted | |
2487979 | Primary Facility | 2016-05-24 | Routine/Complete Inspection | No Violations Noted | |
2506137 | Primary Facility | 2016-07-25 | Follow-up Inspection | No Violations Noted | |
2605849 | Primary Facility | 2017-06-19 | Routine/Complete Inspection | No Violations Noted | On June 19, 2017, at 1215 hrs., the Department conducted a routine inspection at the Chief Oil & Gas LLC, Yanavitch Well Pad Location in Stevens Township, Bradford County. Andrew Hobbins, Water Quality Specialist, represented the Department. Nobody was present for Chief.
The site sign, E & S plan and weekly inspection logs were on site and available for review. The site was observed to be well vegetated except for the areas around recently installed infiltration basins. The infiltration areas were temporarily stabilized during the inspection. Topsoil/compost has been spread on the surface of the well pad and has been vegetated. Gravel still exists in a path around the well heads and around the production equipment. Five wells were observed to be in production during the inspection. The wells were labeled and no bubbling was observed in the well cellars. Five production tanks and five GPUs were observed on secondary containment. Puddles on the well pad surface were observed to be low in specifi |
2635967 | Primary Facility | 2017-08-29 | Site Restoration | No Violations Noted | On August 29, 2017, the Department conducted a site restoration inspection at the Chief Oil & Gas LLC (Chief), Yanavitch Alternate Well Pad in Stevens Township, Bradford County. Andrew Hobbins, Water Quality Specialist, represented the Department. Nobody was present for Chief. The Department received a Notice of Termination (NOT) for the Yanavitch Well Pad on 8/18/2017.
Generally the slopes of the well pad were well vegetated, but infiltration berm # 2 did not meet the requirements 25 Pa Code 102.22(a)(2)(I) Permanent Stabilization. A uniform, perennial 70% vegetation was not achieved around infiltration berm #2. No violations were observed during the inspection. Based on conditions observed during the inspection, the Department recommends denying the NOT. |
2776433 | Primary Facility | 2018-09-13 | Site Restoration | No Violations Noted | The operator submitted a notice of termination (NOT) to the department for Yanavitch Well Pad covered under ESX12-015-0044. The department received the NOT on September 7, 2018.
Five wells have been drilled and stimulated. Each connects to one of five water separators and one of five produced water tanks. Water separator containment is felt-lined plastic and contained up to approximately one inch of water in some spots. Conductivity of water within this containment was 29.4 uS/cm. The felt portion of the containment was ripped in some places but the plastic lining was in good condition overall. Produced water tanks are in good condition and sit within a steel containment with spray-in liner. Water within this containment had a conductivity of 51.6 uS/cm. A puddle on the pad had a conductivity of 646 uS/cm. Five well heads present each with a well head tag. Well cellars filled with water. No bubbling observed in well cellars. Overall vegetation on pad, on side slopes, soil stockpile, and on infiltration |
For data sources see[9]