If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-015-23325 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.662578,"lon":-76.528203,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Bradford | |
Municipality: Overton Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 153744 | |
Farm/Lease Name: RAIMO UNIT | |
License Status: Active | |
Spud Date: | |
Permit Date: 2017-05-25 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.662578 | |
Longitude: -76.528203 |
Date | Event |
---|---|
2017-05-25 | New Permit Application |
2017-09-17 | Performed Spud Operation |
2017-12-14 | Perforation |
2018-01-06 | Performed Stage 1 of Stimulation |
2018-01-07 | Perforation |
2018-01-07 | Performed Stage 2 of Stimulation |
2018-01-07 | Performed Stage 3 of Stimulation |
2018-01-08 | Perforation |
2018-01-08 | Performed Stage 4 of Stimulation |
2018-01-08 | Performed Stage 5 of Stimulation |
2018-01-08 | Performed Stage 6 of Stimulation |
2018-01-09 | Perforation |
2018-01-09 | Performed Stage 7 of Stimulation |
2018-01-09 | Performed Stage 8 of Stimulation |
2018-01-09 | Performed Stage 9 of Stimulation |
2018-01-10 | Perforation |
2018-01-10 | Performed Stage 10 of Stimulation |
2018-01-10 | Performed Stage 11 of Stimulation |
2018-01-10 | Performed Stage 12 of Stimulation |
2018-01-10 | Performed Stage 13 of Stimulation |
2018-01-11 | Perforation |
2018-01-11 | Performed Stage 14 of Stimulation |
2018-01-11 | Performed Stage 15 of Stimulation |
2018-01-11 | Performed Stage 16 of Stimulation |
2018-01-11 | Performed Stage 17 of Stimulation |
2018-01-12 | Perforation |
2018-01-12 | Performed Stage 18 of Stimulation |
2018-01-12 | Performed Stage 19 of Stimulation |
2018-01-12 | Performed Stage 20 of Stimulation |
2018-01-14 | Perforation |
2018-01-14 | Performed Stage 21 of Stimulation |
2018-01-14 | Performed Stage 22 of Stimulation |
2018-01-15 | Perforation |
2018-01-15 | Performed Stage 23 of Stimulation |
2018-01-15 | Performed Stage 24 of Stimulation |
2018-01-15 | Performed Stage 25 of Stimulation |
2018-01-16 | Perforation |
2018-01-16 | Performed Stage 26 of Stimulation |
2018-01-16 | Performed Stage 27 of Stimulation |
2018-01-17 | Perforation |
2018-01-17 | Performed Stage 28 of Stimulation |
2018-01-17 | Performed Stage 29 of Stimulation |
2018-01-18 | Perforation |
2018-01-18 | Performed Stage 30 of Stimulation |
2018-01-18 | Performed Stage 31 of Stimulation |
2018-01-18 | Performed Stage 32 of Stimulation |
2018-01-19 | Perforation |
2018-01-19 | Performed Stage 33 of Stimulation |
2018-01-19 | Performed Stage 34 of Stimulation |
2018-01-19 | Performed Stage 35 of Stimulation |
2018-01-19 | Performed Stage 36 of Stimulation |
2018-01-20 | Perforation |
2018-01-20 | Performed Stage 37 of Stimulation |
2019-06-24 | Deviated |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-01-06 | 2018-01-20 | 8,549 | 12,431,800 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Chief Oil & Gas | Carrier/Base Fluid | Listed Below | ||||
BIOC 11219A | Nalco Champion | Biocide | Listed Below | |||||
Ethanol, 2,2',2"-nitrilotris-, tris(dihydrogen phosphate) (ester), sodium salt |
68171-29-9 | 30 | 0.0016 | 1923 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 5 | 0.00344 | 4137 | ||||
Methanol | 67-56-1 | 45 | 0.01059 | 12743 | ||||
Ethoxylated (C10-16) alcohols | 68002-97-1 | 35 | 0.00004000 | 53 | ||||
Distillate, petroleum, hydrotreated, light | 64742-47-8 | 30 | 0.2062 | 24825 | ||||
Quaternary ammonium compound | 68424-85-1 | 10 | 0.00235 | 2832 | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.0223 | 26842 | ||||
Crystallilne silica | 14808-60-7 | 100 | 13.5671 | 16,330,900.0 | ||||
Water | 7732-18-5 | 85 | 0.12636 | 152103 | ||||
Water | 7732-18-5 | 100 | 86.1865 | 103,744,000.0 | ||||
Acetophenone | 98-86-2 | 1 | 0.00001000 | 2 | ||||
Glutaraldehyde | 111-30-8 | 5 | 0.00118 | 1416 | ||||
Alcohols, (C10-16), ethoxylated | 68002-97-1 | 5 | 0.00344 | 4137 | ||||
Ethylene glycol | 107-21-1 | 30 | 0.0016 | 1923 | ||||
Diethylene glycol mono-n-butyl ether | 112-34-5 | 60 | 0.00008000 | 91 | ||||
Methanol | 67-56-1 | 5 | 0.00001000 | 8 | ||||
Ammonium acetate | 631-61-8 | 13 | 0.00894 | 10757 | ||||
Alcohols, C12-14, ethoxylated | 68439-50-9 | 5 | 0.00344 | 4137 | ||||
Water | 7732-18-5 | 40 | 0.00941 | 11327 | ||||
Water | 7732-18-5 | 40 | 0.00213 | 2564 | ||||
Thiourea | 62-56-6 | 1 | 0.00001000 | 2 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00001000 | 2 | ||||
Unislick ST-50 | CESI Chemical | Friction Reducer | Listed Below | |||||
SCAL16486A | Nalco Champion | Scale Inhibitor | Listed Below | |||||
Hydrochloric Acid | PVS | Acidizing | Listed Below | |||||
Unihib G | GeoSafe | Acid Inhibitor | Listed Below | |||||
Sand | Sargent/Unimin | Proppant | Listed Below |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2018-01-06 | 1 | Sand | 8,611,445 | 8,658 | 8,912 |
2018-01-07 | 2 | Sand | 8,611,445 | 8,417 | 8,809 |
2018-01-07 | 3 | Sand | 8,611,445 | 8,600 | 8,886 |
2018-01-08 | 4 | Sand | 8,611,445 | 8,604 | 8,918 |
2018-01-08 | 5 | Sand | 8,611,445 | 8,756 | 8,895 |
2018-01-08 | 6 | Sand | 8,611,445 | 8,623 | 8,749 |
2018-01-09 | 7 | Sand | 8,611,445 | 8,558 | 8,801 |
2018-01-09 | 8 | Sand | 8,611,445 | 8,659 | 8,923 |
2018-01-09 | 9 | Sand | 8,611,445 | 8,583 | 8,765 |
2018-01-10 | 10 | Sand | 8,611,445 | 8,525 | 8,819 |
2018-01-10 | 11 | Sand | 8,611,445 | 8,677 | 8,956 |
2018-01-10 | 12 | Sand | 8,611,445 | 8,628 | 8,923 |
2018-01-10 | 13 | Sand | 8,611,445 | 8,641 | 8,829 |
2018-01-11 | 14 | Sand | 8,611,445 | 8,643 | 8,918 |
2018-01-11 | 15 | Sand | 8,611,445 | 8,734 | 9,004 |
2018-01-11 | 16 | Sand | 8,611,445 | 8,667 | 8,911 |
2018-01-11 | 17 | Sand | 8,611,445 | 8,556 | 8,725 |
2018-01-12 | 18 | Sand | 8,611,445 | 8,429 | 8,644 |
2018-01-12 | 19 | Sand | 8,611,445 | 8,690 | 8,955 |
2018-01-12 | 20 | Sand | 8,611,445 | 8,535 | 8,702 |
2018-01-14 | 21 | Sand | 8,611,445 | 8,492 | 8,671 |
2018-01-14 | 22 | Sand | 8,611,445 | 8,622 | 8,816 |
2018-01-15 | 23 | Sand | 8,611,445 | 8,645 | 8,791 |
2018-01-15 | 24 | Sand | 8,611,445 | 8,548 | 8,949 |
2018-01-15 | 25 | Sand | 8,611,445 | 8,594 | 8,860 |
2018-01-16 | 26 | Sand | 8,611,445 | 8,566 | 8,696 |
2018-01-16 | 27 | Sand | 8,611,445 | 8,606 | 9,218 |
2018-01-17 | 28 | Sand | 8,611,445 | 8,765 | 8,941 |
2018-01-17 | 29 | Sand | 8,611,445 | 8,737 | 8,968 |
2018-01-18 | 30 | Sand | 8,611,445 | 8,702 | 8,824 |
2018-01-18 | 31 | Sand | 8,611,445 | 8,642 | 8,827 |
2018-01-18 | 32 | Sand | 8,611,445 | 8,668 | 8,860 |
2018-01-19 | 33 | Sand | 8,611,445 | 8,626 | 8,907 |
2018-01-19 | 34 | Sand | 8,611,445 | 8,595 | 8,838 |
2018-01-19 | 35 | Sand | 8,611,445 | 8,634 | 8,890 |
2018-01-19 | 36 | Sand | 8,611,445 | 8,586 | 9,016 |
2018-01-20 | 37 | Sand | 8,611,445 | 8,391 | 8,739 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | CHIEF OIL & GAS LLC | 4,564,858.23 | 329 | 0.00 | 0 | 0.00 | 0 |
2019 | CHIEF OIL & GAS LLC | 3,159,796.63 | 331 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | CHIEF OIL & GAS LLC | Drill Cuttings | 1,444.57 Tons | LANDFILL | 301358 |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 51.60 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 36,342.39 Bbl | REUSE (AT WELL PAD) | |
2018 | CHIEF OIL & GAS LLC | Soil Contaminated by Oil | 78.95 Tons | LANDFILL | 301358 |
2018 | CHIEF OIL & GAS LLC | Soil Contaminated by Oil & Gas Related Spills | 78.95 Tons | LANDFILL | 301358 |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 420.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | CHIEF OIL & GAS LLC | Synthetic Liner Materials | 9.85 Tons | LANDFILL | 301358 |
2019 | CHIEF OIL & GAS LLC | Soil Contaminated by Oil | 56.29 Tons | LANDFILL | 301358 |
2019 | CHIEF OIL & GAS LLC | Soil Contaminated by Oil & Gas Related Spills | 56.29 Tons | LANDFILL | 301358 |
2019 | CHIEF OIL & GAS LLC | Produced Fluid | 1,160.75 Bbl | REUSE (AT WELL PAD) |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2646854 | Primary Facility | 2017-10-12 | Routine/Complete Inspection | No Violations Noted | Conductor only.
111 feet |
2651370 | Primary Facility | 2017-10-24 | Drilling/Alteration | No Violations Noted | The 4H well was being drilled at the time of inspection. All materials used for drilling within containment. No leaks detected. Site stable. No violations noted. |
2661412 | Primary Facility | 2017-11-09 | Routine/Complete Inspection | No Violations Noted | Company man for site was Trey Villareal, although I did not see or speak to him while on-site. H&P rig 513 was running casing in the 3H well. Containments appeared to be in good condition, and both the cuttings backyard and the chemical containment area were clean. |
2687422 | Primary Facility | 2018-01-23 | Routine/Complete Inspection | No Violations Noted | I met Gibb Blevins when I arrived onsite. Frac is completed, currently moving equipment from the site. Steady rain falling. Puddles on the pad surface showed conductance readings from .35 mS/cm to .85 mS/cm, and most of the water on containment showed similar values. One area of water on the liner (approximately 20' x 80') showed elevated conductance (2.1- 16.3 mS/cm); I pointed this area out to Gibb. Several vac trucks were actively working on the site, and Gibb told me he would have them focus in that area. |
2786399 | Primary Facility | 2018-10-09 | Routine/Complete Inspection | No Violations Noted | Weather was 74° and sunny at time of inspection. There were no Chief representatives on location at time of inspection. Well had a 0-5k psi gauge on the production tubing, the production casing and the pay line. Well also had a digital gauge on the production casing. The digital gauge on the production casing read 1174 psi, tubing pressure was approximately 1200 psi and pay line pressure was approximately 1250 psi at time of inspection. There were 2 annulus vents plumbed to surface. They were plumbed together and ran over to a poly vent tank. The tank had 100% LEL and 60% methane detected at time of inspection. No violations were noted at time of inspection. |
2811963 | Primary Facility | 2018-12-06 | Routine/Complete Inspection | No Violations Noted | I met Trey Villareal, Jeremy Boyd, and Billy Swanson when I arrived. Precision rig 569 was on location, drilling the surface hole on the East 1H well. Containments appeared to be in excellent condition, site housekeeping was good. |
2842958 | Primary Facility | 2019-02-19 | Incident- Response to Accident or Event | No Violations Noted | On February 19, 2019, the Department conducted an investigation on the Chief Oil & Gas LLC Raimo Pad. A split hose caused a spill of base oil outside of containment off the well pad. The operator estimates about 1 bbl of base oil had spilled. At the time of inspection, the soil of the impacted area has been excavated. The soil has been placed in covered roll-off containers. The excavated area did not appear to have any visually impacted soil remaining. The Department spoke with Jeremy Watson with Chief Oil & Gas LLC. He said that Waste Management was coming to do a profile of the contaminated soil and haul it away.
During the investigation, the operator was cleaning and removing timber mats. There was a vac truck onsite to remove the wash water out of the spill containment. The Department spoke with Peg Farrell on the phone. The Department discussed that the Act 2 process should be started. The release of base oil of the well pad is a violation of CSL 402(b), 78a 56(a), and SWMA 301. |
For data sources see[9]