If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-015-23329 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.568172,"lon":-76.548772,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Bradford | |
Municipality: Overton Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 147405 | |
Farm/Lease Name: P. CULLEN B UNIT 2H | |
License Status: | |
Spud Date: | |
Permit Date: 2017-05-31 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.568172 | |
Longitude: -76.548772 |
Date | Event |
---|---|
2017-05-31 | New Permit Application |
2018-03-05 | Permit Renewal Application |
For data sources see[4]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2577031 | Primary Facility | 2017-03-30 | Routine/Complete Inspection | No Violations Noted | I arrived on-site @ 11:15 hrs and met Dale Graham, Chief company man. Frac was completed on 3/29; crews on location were swapping frac trees on wells for production trees. The 2H had the production head on and was tagged, and the 1H was having the production tree installed. Production crew will be moving on today or tomorrow to begin flowback operations. I departed @ 11:45 hrs. |
For data sources see[5]