If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-015-23349 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.596669,"lon":-76.581286,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Bradford | |
Municipality: Overton Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 154343 | |
Farm/Lease Name: L. KINGSLEY SW UNIT | |
License Status: | |
Spud Date: | |
Permit Date: 2017-06-30 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.596669 | |
Longitude: -76.581286 |
Date | Event |
---|---|
2017-06-30 | New Permit Application |
2017-12-02 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-10-16 | 2018-10-30 | 8,512 | 8,846,120 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Hydrochloric Acid | PVS | Acidizing | Listed Below | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.02584 | 22741 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00001000 | 1 | ||||
Quaternary ammonium compound | 68424-85-1 | 10 | 0.00239 | 2099 | ||||
Water | 7732-18-5 | 40 | 0.00208 | 1833 | ||||
Oleic acid diethanolamide | 93-83-4 | 2 | 0.0013 | 1145 | ||||
Glutaraldehyde | 111-30-8 | 5 | 0.00003000 | 28 | ||||
Water | 7732-18-5 | 80 | 0.01908 | 16793 | ||||
Acetophenone | 98-86-2 | 1 | 0.00001000 | 1 | ||||
Ethoxylated (C10-16) alcohols | 68002-97-1 | 35 | 0.00005000 | 43 | ||||
Ethanol, 2,2',2"-nitrilotris-, tris(dihydrogen phosphate) (ester), sodium salt |
68171-29-9 | 30 | 0.00156 | 1375 | ||||
Crystallilne silica | 14808-60-7 | 100 | 15.8396 | 13,937,900.0 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 2 | 0.0013 | 1145 | ||||
Glutaraldehyde | 111-30-8 | 5 | 0.00119 | 1050 | ||||
Water | 7732-18-5 | 50 | 0.03254 | 28636 | ||||
Thiourea | 62-56-6 | 1 | 0.00001000 | 1 | ||||
Ethanol | 64-17-5 | 5 | 0.00119 | 1050 | ||||
Copolymer of 2-Propenamide | 79-06-1 | 20 | 0.01302 | 11454 | ||||
Water | 7732-18-5 | 100 | 83.8932 | 73,820,900.0 | ||||
Diethylene glycol mono-n-butyl ether | 112-34-5 | 60 | 0.00008000 | 74 | ||||
Water | 7732-18-5 | 85 | 0.14645 | 128868 | ||||
Ethylene alcohol | 107-21-1 | 30 | 0.00156 | 1375 | ||||
Methanol | 67-56-1 | 5 | 0.00001000 | 6 | ||||
Distillate, petroleum, hydrotreated, light | 64742-47-8 | 20 | 0.01302 | 11454 | ||||
Water | 7732-18-5 | 40 | 0.00026 | 227 | ||||
Methanol | 67-56-1 | 45 | 0.00029 | 256 | ||||
Quaternary ammonium compound | 68424-85-1 | 10 | 0.00006000 | 57 | ||||
Sand | Sargent/Imo,om | Proppant | Listed Below | |||||
BIOC11139A | Nalco Champion | Biocide | Listed Below | |||||
Unislick CST-LA | Chemplex, Solvay Group | Friciton Reducer | Listed Below | |||||
Water | Chief Oil & Gas | Carrier/Base Fluid | Listed Below | |||||
BIOC11219A | Nalco Champion | Biocide | Listed Below | |||||
Unihib G | GeoSafe | Acid Inhibitor | Listed Below | |||||
SCAL16484A | Nalco Champion | Scale Inhibitor | Listed Below |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | CHIEF OIL & GAS LLC | 643,697.37 | 42 | 0.00 | 0 | 0.00 | 0 |
2019 | CHIEF OIL & GAS LLC | 4,072,377.38 | 358 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 6,243.37 Bbl | REUSE (AT WELL PAD) | |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 270.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | CHIEF OIL & GAS LLC | Drill Cuttings | 1,226.07 Tons | LANDFILL | 301358 |
2018 | CHIEF OIL & GAS LLC | Synthetic Liner Materials | 3.60 Tons | LANDFILL | 301358 |
2019 | CHIEF OIL & GAS LLC | Produced Fluid | 30.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | CHIEF OIL & GAS LLC | Synthetic Liner Materials | 13.04 Tons | LANDFILL | 301358 |
2019 | CHIEF OIL & GAS LLC | Produced Fluid | 14,972.56 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2670756 | Primary Facility | 2017-12-12 | Drilling/Alteration | No Violations Noted | Drilling of the well cellars underway. Drill cuttings being disposed of in roll off container. Drilling performed by Halliburton. No violations noted. Location snow covered. |
2696139 | Primary Facility | 2018-02-20 | Drilling/Alteration | No Violations Noted | Arrived @ 12:00. Weather: warm, T¿s in 40¿s. Precision 569 on site and beginning surface hole drilling on the L. Kingsley SE 4H during my inspection. Met with Ty Merreighn (company man), also onsite were Trey Villaneuve and Paul Ricco (drilling co-superintendent). Chief is employing batch drilling on this location and using the FMC DTO 30 wellhead system. Halliburton conducted the surface casing cement job on the SE2H during my inspection. The surface casing for the SE 3H had been previously cemented. |
2706783 | Primary Facility | 2018-03-15 | Routine/Complete Inspection | No Violations Noted | I met Ty Marine when I arrived. Precision rig #569 on location, drilling at 6231' on the SW 2H well. 1-3" of snow on the site; snow on rig mats had been shoveled into piles on containment. Overall, site looked good, with containment berms in good condition and good housekeeping. Chemical storage area was neat and clean. I did note 4 vac boxes that had been set off of containment; a small (8' x 4') duck pond had been placed under the end that opens, but these had been buckled and folded under the vac boxes. When I mentioned it to Ty, he said that the boxes were empty, but that he had already called the company that had dropped them off, and they would be returning on Friday to re-set them. |
2715353 | Primary Facility | 2018-03-29 | Drilling/Alteration | No Violations Noted | Arrived @ 10:43 with Ulyana Trynovich (DEP OGI)Weather: overcast, foggy. Precision 569 on site at 3000' on the SE 3H. Met with Jeremy Boyd (company man). Reviewed several intermediate casing CBLs. There appeared to be decreased bond quality at approximately 750', based on a quick review. Requested electronic copies from Peg Farrell (Chief) for further review. Cement sample cups did not appear to be labelled. We agreed to label them consistently. Reviewed BOP test conducted on 3/21/18. Discussed level of detail in drillers log and noted that vertical section was logged. NW 2H from 100' to 1521', and SW1H from 1546' to 8640' MD. Also discussed changes in CBL timing. No violations were observed during this inspection. |
2769771 | Primary Facility | 2018-08-31 | Routine/Complete Inspection | No Violations Noted | Eight wells drilled in track and ready for production. Eight GPU installed within containment. The well supply and dump lines are being installed at this time. Heavy equipment onsite digging trenches for the pipe installation. |
2811992 | Primary Facility | 2018-12-06 | Routine/Complete Inspection | No Violations Noted | I met Greg Rohrer, Chief company man, when I arrived. Flowback operations were in progress, with temporary sand separators and GPUs hooked up and gas flowing to sales. Overall containment appeared to be in good condition, with the exception of the foam berm between the permanent GPUs and temporary ones; in what was obviously a high traffic area, the berm had been crushed. The containment volume for this area may still have been more than adequate, as only pass-through equipment was located on the containment, but I pointed it out to Greg anyway. I noted a 10'x12' puddle on the pad that showed slightly elevated conductance (2.88mS/cm) between the temporary GPUs and the Baker tank battery containment. A vac truck was pumping out the Baker tanks in this area, and Greg told me he would have the area vacced ASAP. |
For data sources see[8]