If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-015-23367 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.58928,"lon":-76.6015,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Bradford | |
Municipality: Overton Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 145497 | |
Farm/Lease Name: LIGHTCAP NORTH UNIT | |
License Status: Active | |
Spud Date: | |
Permit Date: 2017-08-08 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.589280 | |
Longitude: -76.6015 |
Date | Event |
---|---|
2017-08-08 | New Permit Application |
2017-09-18 | Performed Spud Operation |
2018-01-09 | Perforation |
2018-02-08 | Performed Stage 1 of Stimulation |
2018-02-09 | Perforation |
2018-02-09 | Performed Stage 2 of Stimulation |
2018-02-09 | Performed Stage 3 of Stimulation |
2018-02-09 | Performed Stage 4 of Stimulation |
2018-02-10 | Perforation |
2018-02-10 | Performed Stage 5 of Stimulation |
2018-02-10 | Performed Stage 6 of Stimulation |
2018-02-11 | Perforation |
2018-02-11 | Performed Stage 7 of Stimulation |
2018-02-12 | Perforation |
2018-02-12 | Performed Stage 10 of Stimulation |
2018-02-12 | Performed Stage 8 of Stimulation |
2018-02-12 | Performed Stage 9 of Stimulation |
2018-02-13 | Perforation |
2018-02-13 | Performed Stage 11 of Stimulation |
2018-02-13 | Performed Stage 12 of Stimulation |
2018-02-14 | Perforation |
2018-02-14 | Performed Stage 13 of Stimulation |
2018-02-14 | Performed Stage 14 of Stimulation |
2018-02-15 | Perforation |
2018-02-15 | Performed Stage 15 of Stimulation |
2018-02-15 | Performed Stage 16 of Stimulation |
2018-02-15 | Performed Stage 17 of Stimulation |
2018-02-16 | Perforation |
2018-02-16 | Performed Stage 18 of Stimulation |
2018-02-16 | Performed Stage 19 of Stimulation |
2018-02-17 | Perforation |
2018-02-17 | Performed Stage 20 of Stimulation |
2018-02-18 | Perforation |
2018-02-18 | Performed Stage 21 of Stimulation |
2018-02-19 | Perforation |
2018-02-19 | Performed Stage 22 of Stimulation |
2018-02-19 | Performed Stage 23 of Stimulation |
2018-02-20 | Perforation |
2018-02-20 | Performed Stage 24 of Stimulation |
2018-02-20 | Performed Stage 25 of Stimulation |
2018-02-20 | Performed Stage 26 of Stimulation |
2018-02-21 | Perforation |
2018-02-21 | Performed Stage 27 of Stimulation |
2018-02-21 | Performed Stage 28 of Stimulation |
2018-02-22 | Perforation |
2018-02-22 | Performed Stage 29 of Stimulation |
2018-02-22 | Performed Stage 30 of Stimulation |
2018-02-22 | Performed Stage 31 of Stimulation |
2018-02-23 | Perforation |
2018-02-23 | Performed Stage 32 of Stimulation |
2018-02-23 | Performed Stage 33 of Stimulation |
2018-02-23 | Performed Stage 34 of Stimulation |
2019-06-27 | Deviated |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-02-08 | 2018-02-23 | 8,191 | 11,366,500 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 86.144 | 94,853,800.0 | |||
Water | 7732-18-5 | 40 | 0.00213 | 2346 | ||||
Copolymer of 2-Propenamide | 79-06-1 | 20 | 0.01307 | 14392 | ||||
Water | 7732-18-5 | 40 | 0.00939 | 10339 | ||||
Ethoxylated (C10-16) alcohols | 68002-97-1 | 35 | 0.00004000 | 47 | ||||
Ethylene glycol | 107-21-1 | 30 | 0.0016 | 1760 | ||||
Water | 7732-18-5 | 50 | 0.03268 | 35979 | ||||
Thiourea | 62-56-6 | 1 | 0.00001000 | 1 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 2 | 0.00131 | 1439 | ||||
Distillate, petroleum, hydrotreated, light | 64742-47-8 | 20 | 0.1307 | 14392 | ||||
Oleic acid diethanolamide | 93-83-4 | 2 | 0.00131 | 1439 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00001000 | 1 | ||||
Crystallilne silica | 14808-60-7 | 100 | 13.6191 | 14,996,100.0 | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.02139 | 23549 | ||||
Quaternary ammonium compound | 68424-85-1 | 10 | 0.00235 | 2585 | ||||
Water | 7732-18-5 | 85 | 0.12119 | 133442 | ||||
Methanol | 67-56-1 | 5 | 0.00001000 | 7 | ||||
Glutaraldehyde | 111-30-8 | 5 | 0.00117 | 1292 | ||||
Diethylene glycol mono-n-butyl ether | 112-34-5 | 60 | 0.00007000 | 80 | ||||
Acetophenone | 98-86-2 | 1 | 0.00001000 | 1 | ||||
Methanol | 67-56-1 | 45 | 0.01056 | 11631 | ||||
Ethanol, 2,2',2"-nitrilotris-, tris(dihydrogen phosphate) (ester), sodium salt |
68171-29-9 | 30 | 0.0016 | 1760 | ||||
Sand | Sargent/Unimin | Proppant | Listed Below | |||||
BIOC11219A | Nalco Champion | Biocide | Listed Below | |||||
Water | Chief Oil & Gas | Carrrier/Base Fluid | Listed Below | |||||
Unislick CST-LA | Chemplex, Solvay Group | Friction Reducer | Listed Below | |||||
Hydrochloric Acid | PVS | Acidizing | Listed Below | |||||
SCAL16486A | Nalco Champion | Scale Inhibitor | Listed Below | |||||
Unihib G | GeoSafe | Acid Inhibitor | Listed Below |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2018-02-08 | 1 | Sand | 473,903 | 8,539 | 9,149 |
2018-02-09 | 2 | Sand | 473,903 | 8,435 | 8,997 |
2018-02-09 | 3 | Sand | 473,903 | 8,274 | 9,020 |
2018-02-09 | 4 | Sand | 473,903 | 8,586 | 8,958 |
2018-02-10 | 5 | Sand | 473,903 | 8,456 | 8,782 |
2018-02-10 | 6 | Sand | 473,903 | 8,625 | 8,948 |
2018-02-11 | 7 | Sand | 473,903 | 8,342 | 8,592 |
2018-02-12 | 8 | Sand | 473,903 | 8,419 | 8,851 |
2018-02-12 | 9 | Sand | 473,903 | 8,495 | 8,874 |
2018-02-12 | 10 | Sand | 473,903 | 8,381 | 8,931 |
2018-02-13 | 11 | Sand | 473,903 | 8,597 | 8,788 |
2018-02-13 | 12 | Sand | 473,903 | 8,083 | 9,072 |
2018-02-14 | 13 | Sand | 473,903 | 8,454 | 8,857 |
2018-02-14 | 14 | Sand | 473,903 | 8,526 | 8,827 |
2018-02-15 | 15 | Sand | 473,903 | 8,357 | 8,842 |
2018-02-15 | 16 | Sand | 473,903 | 7,959 | 8,670 |
2018-02-15 | 17 | Sand | 473,903 | 8,521 | 8,841 |
2018-02-16 | 18 | Sand | 473,903 | 8,520 | 8,751 |
2018-02-16 | 19 | Sand | 473,903 | 8,439 | 8,719 |
2018-02-17 | 20 | Sand | 473,903 | 8,484 | 9,033 |
2018-02-18 | 21 | Sand | 473,903 | 7,864 | 9,237 |
2018-02-19 | 22 | Sand | 473,903 | 7,716 | 8,683 |
2018-02-19 | 23 | Sand | 473,903 | 8,082 | 8,678 |
2018-02-20 | 24 | Sand | 473,903 | 8,015 | 8,809 |
2018-02-20 | 25 | Sand | 473,903 | 7,724 | 8,902 |
2018-02-20 | 26 | Sand | 473,903 | 799 | 8,650 |
2018-02-21 | 27 | Sand | 473,903 | 7,453 | 8,815 |
2018-02-21 | 28 | Sand | 473,903 | 7,486 | 8,497 |
2018-02-22 | 29 | Sand | 473,903 | 7,665 | 8,710 |
2018-02-22 | 30 | Sand | 473,903 | 7,878 | 8,636 |
2018-02-22 | 31 | Sand | 473,903 | 7,727 | 8,814 |
2018-02-23 | 32 | Sand | 473,903 | 7,614 | 9,209 |
2018-02-23 | 33 | Sand | 473,903 | 7,683 | 8,810 |
2018-02-23 | 34 | Sand | 473,903 | 7,884 | 8,618 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | CHIEF OIL & GAS LLC | 2,857,937.14 | 291 | 0.00 | 0 | 0.00 | 0 |
2019 | CHIEF OIL & GAS LLC | 1,867,700.09 | 362 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | CHIEF OIL & GAS LLC | Drill Cuttings | 1,757.65 Tons | LANDFILL | 301358 |
2018 | CHIEF OIL & GAS LLC | Soil Contaminated by Oil | 67.21 Tons | LANDFILL | 301358 |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 19,474.76 Bbl | REUSE (AT WELL PAD) | |
2018 | CHIEF OIL & GAS LLC | Soil Contaminated by Oil & Gas Related Spills | 67.21 Tons | LANDFILL | 301358 |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 64.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | CHIEF OIL & GAS LLC | Produced Fluid | 7,384.52 Bbl | REUSE (AT WELL PAD) |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2647292 | Primary Facility | 2017-10-13 | Routine/Complete Inspection | No Violations Noted | Conductor only. |
2660025 | Primary Facility | 2017-11-09 | Routine/Complete Inspection | No Violations Noted | I met Jeremy Boyd when I arrived. Precision rig 569 on location, just finishing drilling the 12 1/4" section of the Hart North 5H. Containment was in fairly good shape, although I pointed out 2 areas to Jeremy where the liner was torn on the berms. Jeremy told me he would address it. Overall, site appeared to be clean and well maintained. |
2702020 | Primary Facility | 2018-02-14 | Routine/Complete Inspection | No Violations Noted | Chief Oil and Gas representative on site: Chris Marsh
Universal conducting the frack. PPC site specific plan on site. The operator reported approximately 200 gallons of fracking fluid escaped at high pressure from an iron fitting attached to the well head. The high pressure fluid cut through the primary containment. The iron fitting was replaced and the containment was repaired. No clean-up under containment. A Vac truck was used were free liquid could be removed. Spilled material appears to have stayed on pad surface. Clean-up to begin after the frack is completed. Violations noted. No samples collected. |
2707084 | Primary Facility | 2018-03-15 | Routine/Complete Inspection | No Violations Noted | Site was very active when I arrived; company man Gibb Blevins was not at the site when I arrived. Frac was finished, and crews were setting up temporary separators and dehy units, as well as breaking down Baker tank containments. Many puddles were present on the pad surface, with conductance ranging from .56 to 1.3 mS/cm for the most part. Some small puddles (.5-2 gallons) were present near one of the Baker tank batteries that had slightly higher conductance (2-2.5 mS/cm); other puddles in the immediate area were in the range of .8-1.1 mS/cm. I was unable to access the center of the pad due to activity and truck traffic. |
2733699 | Primary Facility | 2018-05-22 | Routine/Complete Inspection | No Violations Noted | Arrrived at 12:00. Weather: rain. There were 5 producing wells on location. Frac operations appear to have been recently completed. There were 5 sand separators and two banks of tanks on site, liner was still in place. Cellars were water-filled with the exception of the Hart N 3H. It is worth remarking that there were numerous signs of ineffective sediment control on the access road (see photos). |
For data sources see[9]