Well Details

Well ID: 37-015-23371
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Wilmot Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 147311
Farm/Lease Name: KAUFMANN EAST UNIT
License Status: Active
Spud Date:
Permit Date: 2017-09-07
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.562094
Longitude: -76.301644

For data sources see[1][2][3]

Well History

Date Event
2017-09-07 New Permit Application
2018-04-18 Performed Spud Operation
2020-01-17 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-11-29 2018-12-04 8,356 8,135,230 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SCAL16486A Nalco Champion Scale Inhibitor Listed Below
Hydrochloric Acid PVS Acidizing Listed Below
Water Chief Oil & Gas Carrier/Base Fluid Listed Below
FR-11 Chemplex, Solvay Group Friction Reducer Listed Below
BIOC11219A Nalco Champion Biocide Listed Below
Unihib G GeoSafe Acid Inhibitor Listed Below
Sand Proppant Sargent/Unimin Proppant Listed Below
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00144 1156
Ethanol, 2,2',2"-nitrilotris-,
tris(dihydrogen phosphate) (ester), sodium salt
68171-29-9 30 0.00159 1279
Ethoxylated (C10-16) alcohols 68002-97-1 35 0.00005000 39
Water 7732-18-5 100 84.5019 67,888,500.0
Distillate, petroleum, hydrotreated, light 64742-47-8 20 0.01438 11555
Acetophenone 98-86-2 1 0.00001000 1
Thiourea 62-56-6 1 0.00001000 1
Methanol 67-56-1 5 0.00001000 6
Water 7732-18-5 40 0.00212 1705
Hydrochloric acid 7647-01-0 15 0.02406 19331
Ethylene glycol 107-21-1 30 0.00159 1279
Copolymer of 2-Propenamide 79-06-1 20 0.01438 11555
Glutaraldehyde 111-30-8 5 0.00116 928
Water 7732-18-5 85 0.13635 109540
Water 7732-18-5 40 0.00924 7424
Quaternary ammonium compound 68424-85-1 10 0.00231 1856
Diethylene glycol mono-n-butyl ether 112-34-5 60 0.00008000 66
Methanol 67-56-1 45 0.0104 8352
Water 7732-18-5 50 0.03596 28888
Formaldehyde 50-00-0 1 0.00001000 1
Oleic acid diethanolamide 93-83-4 2 0.00144 1156
Crystallilne silica 14808-60-7 100 15.2372 12,241,500.0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2018 CHIEF OIL & GAS LLC 133,602.15 17 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 2,682,797.09 362 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 CHIEF OIL & GAS LLC Produced Fluid 1,583.93 Bbl REUSE (AT WELL PAD)
2018 CHIEF OIL & GAS LLC Drill Cuttings 1,239.93 Tons LANDFILL 301358
2018 CHIEF OIL & GAS LLC Synthetic Liner Materials 19.98 Tons LANDFILL 301358
2019 CHIEF OIL & GAS LLC Produced Fluid 120.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 CHIEF OIL & GAS LLC Synthetic Liner Materials 9.14 Tons LANDFILL 301358
2019 CHIEF OIL & GAS LLC Produced Fluid 4,210.56 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2725415 Primary Facility 2018-05-02 Routine/Complete Inspection No Violations Noted The 4H and 5H wells were spudded on 4/18/2018. Conductors set. The 1H, 2H and 3H wells are staged for production. A soil stockpile was installed as shown on site plans. Soil stabilized with straw. It is unknown if fertilizer and seed mixture was applied. Silt stock applied around stockpile. No leaks from production equipment.
2740823 Primary Facility 2018-06-13 Drilling/Alteration No Violations Noted Two wells being drilled. The 5H is currently being drilled. Containment appears sound. No leaks detected.
2810333 Primary Facility 2018-12-04 Incident- Response to Accident or Event Viol(s) Noted & Immediately Corrected Arrived onsite at 10:43 in response to a spill notification received on 12/3/18 at 15:45. Peg Farrell reported a release of about 25 gallons of brine water off of containment at the northeast corner of the pad near the produced water tanks and sand vac. The impacted area included a portion of the a collection ditch at the edge of the pad. Chief was in the process of stimulating the 4H well.

Met with Colter, Company Man onsite and Kellon, Environmental Field Coordinator. They believed the cause of the spill to be from an overflowed blender. The overflow then leaked through containment and onto the pad surface. There are two layers of containment under the equipment (plastic, felt, plastic, felt). Chief will continue to inspect the containment during operations and repair any punctures or tears found.

The vac truck onsite removed pooled water from the containment as soon as the spill was noticed. At the time of inspection an excavator was removing the impacted area of the pad. The area being excavated was ap

2831472 Primary Facility 2019-01-03 Routine/Complete Inspection No Violations Noted I arrived at the site at 12:05. The weather conditions are cloudy skies, chilly, with occasional snow flurries, and temperatures in the mid 30's. A vacuum truck is on site in the process of removing storm water on the pad surface adjacent to the production fluid tanks containment unit. There was no other activity or personnel at the site. The Kaufmann 1H-5H wells are in production. Chief submitted a stimulation notification to the Department on 11/29/18 at 8:58 AM. The comments in the notification indicate the frac started on the 4H well at 7:28 AM on 11/29/18. The 4H and 5H wells are the most recently completed wells. Completions operations consists of hydraulic fracturing (stimulation), hydraulic fracturing plug drill-outs, and flowback. The secondary containment liner and equipment utilized for completions, along with frac tanks, remains on the pad surface. Impacted material associated with a spill of fluid out of a frac blender tub remains on the pad surface in the northeast quadrant of the pad

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2810333 835135 2018-12-03 2018-12-04 CSL 402(b) Environmental Health & Safety
2810333 835136 2018-12-03 2018-12-04 78a56(a) Environmental Health & Safety
2810333 835137 2018-12-03 2018-12-04 SWMA 301 Environmental Health & Safety

For data sources see[8]