If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-21587 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.750759,"lon":-80.032435,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Forward Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 151353 | |
Farm/Lease Name: OLIVE M MARBURGER LIVING TRUST 2 | |
License Status: | |
Spud Date: | |
Permit Date: 2008-11-12 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.750759 | |
Longitude: -80.032435 |
Date | Event |
---|---|
2008-11-12 | New Permit Application |
2009-02-02 | Performed Spud Operation |
2009-05-24 | Drilling Completion |
2009-07-13 | Perforation |
2010-03-04 | DEVIATED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | PHILLIPS EXPLORATION INC | 90377.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | PHILLIPS EXPLORATION INC | 281,008.50 | 345 | 220.50 | 345 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 110,387.00 | 114 | 124.00 | 114 | 0.00 | 0 |
2012 | XTO ENERGY INC | 122,974.00 | 229 | 0.00 | 0 | 273.00 | 123 |
2013 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 72.00 | 180 |
2014 | XTO ENERGY INC | 22,180.00 | 36 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 235,446.60 | 354 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 140,891.00 | 287 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 104,229.70 | 307 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 99,427.00 | 294 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 79,290.00 | 218 | 0.00 | 0 | 3.50 | 16 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 2,268.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 50.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PBR |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 3,059.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2012 | XTO ENERGY INC | Produced Fluid | 190.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2012 | XTO ENERGY INC | Produced Fluid | 54.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2012 | XTO ENERGY INC | Produced Fluid | 37.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | XTO ENERGY INC | Produced Fluid | 152.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101674 |
2012 | XTO ENERGY INC | Produced Fluid | 1,241.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 620.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2014 | XTO ENERGY INC | Produced Fluid | 170.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2014 | XTO ENERGY INC | Produced Fluid | 1,032.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 266.90 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2015 | XTO ENERGY INC | Produced Fluid | 358.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2015 | XTO ENERGY INC | Produced Fluid | 447.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2015 | XTO ENERGY INC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2015 | XTO ENERGY INC | Produced Fluid | 7,254.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2015 | XTO ENERGY INC | Produced Fluid | 220.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | XTO ENERGY INC | Produced Fluid | 2,186.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2016 | XTO ENERGY INC | Soil Contaminated by Oil | 1.04 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2016 | XTO ENERGY INC | Soil Contaminated by Oil & Gas Related Spills | 1.04 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2016 | XTO ENERGY INC | Produced Fluid | 268.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2016 | XTO ENERGY INC | Produced Fluid | 2,468.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 315.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 105.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XTO ENERGY INC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2017 | XTO ENERGY INC | Produced Fluid | 4,564.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 240.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2018 | XTO ENERGY INC | Produced Fluid | 160.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | XTO ENERGY INC | Produced Fluid | 4,514.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 280.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 914.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 3,398.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 93.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Other Oil & Gas Wastes | 294.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1758376 | Primary Facility | 2008-12-23 | Routine/Complete Inspection | No Violations Noted | |
1767603 | Primary Facility | 2009-02-05 | Drilling/Alteration | No Violations Noted | |
1768861 | Primary Facility | 2009-02-06 | Drilling/Alteration | No Violations Noted | |
1768870 | Primary Facility | 2009-02-10 | Drilling/Alteration | Violation(s) Noted | |
1769175 | Primary Facility | 2009-02-13 | Compliance Evaluation | No Violations Noted | |
1777018 | Primary Facility | 2009-03-12 | Routine/Complete Inspection | No Violations Noted | |
1782900 | Primary Facility | 2009-04-09 | Routine/Complete Inspection | No Violations Noted | |
1797360 | Primary Facility | 2009-05-08 | Routine/Complete Inspection | No Violations Noted | |
1798741 | Primary Facility | 2009-05-18 | Drilling/Alteration | No Violations Noted | |
1801656 | Primary Facility | 2009-06-01 | Drilling/Alteration | No Violations Noted | |
1805412 | Primary Facility | 2009-06-12 | Routine/Complete Inspection | No Violations Noted | |
1807789 | Primary Facility | 2009-06-24 | Routine/Complete Inspection | No Violations Noted | |
1811553 | Primary Facility | 2009-07-10 | Routine/Complete Inspection | No Violations Noted | |
1812713 | Primary Facility | 2009-07-14 | Routine/Complete Inspection | Viol(s) Noted & Immediately Corrected | |
1813132 | Primary Facility | 2009-07-15 | Drilling/Alteration | No Violations Noted | |
1815022 | Primary Facility | 2009-07-21 | Routine/Complete Inspection | No Violations Noted | |
1823669 | Primary Facility | 2009-08-20 | Routine/Complete Inspection | No Violations Noted | |
1827005 | Primary Facility | 2009-09-10 | Routine/Complete Inspection | No Violations Noted | |
1902872 | Primary Facility | 2010-07-26 | Routine/Complete Inspection | No Violations Noted | |
1930917 | Primary Facility | 2010-11-30 | Site Restoration | No Violations Noted | Well site appeared to be completely restored. Greater than 70% perennial vegetative cover. 3 210 barrell production fluid tanks. All tanks are diked and fenced. E & S BMP's removed. Pits reclaimed. Cuttings landfarmed. 15,349 bbls of frac flow back were hauled away to approved treatment facility. Well equipped for production. |
1930931 | Primary Facility | 2010-11-30 | Site Restoration | No Violations Noted | |
1988457 | Primary Facility | 2011-07-14 | Routine/Partial Inspection | No Violations Noted | |
2022738 | Primary Facility | 2011-11-29 | Routine/Complete Inspection | No Violations Noted | |
2361572 | Primary Facility | 2015-04-14 | Routine/Partial Inspection | No Violations Noted |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1768870 | 556210 | 02/10/2009 | 2009-02-10 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | |
1812713 | 566975 | 07/14/2009 | 2009-07-14 | 401 CSL - Discharge of pollultional material to waters of Commonwealth. | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
556210 | 242984 | NOV - Notice of Violation | Comply/Closed | 2009-02-13 |
For data sources see[7]