If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-21588 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.768573,"lon":-80.04443,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Forward Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 146041 | |
Farm/Lease Name: EDWARD R GAW JR 1 | |
License Status: | |
Spud Date: | |
Permit Date: 2008-10-08 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.768573 | |
Longitude: -80.044430 |
Date | Event |
---|---|
2008-10-08 | New Permit Application |
2008-12-23 | Performed Spud Operation |
2009-03-13 | New Permit Application |
2009-03-31 | Drilling Completion |
2009-04-08 | Perforation |
2010-03-04 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | PHILLIPS EXPLORATION INC | 58880.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | PHILLIPS EXPLORATION INC | 79,944.50 | 322 | 41.00 | 322 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 25,674.00 | 109 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 52,369.00 | 247 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 26,525.00 | 125 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 25,765.00 | 65 | 0.00 | 0 | 80.27 | 65 |
2015 | XTO ENERGY INC | 60,006.40 | 356 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 48,683.00 | 252 | 0.00 | 0 | 133.11 | 121 |
2017 | XTO ENERGY INC | 58,214.10 | 301 | 0.00 | 0 | 74.69 | 259 |
2018 | XTO ENERGY INC | 36,685.00 | 288 | 0.00 | 0 | 22.64 | 258 |
2019 | XTO ENERGY INC | 28,108.00 | 261 | 0.00 | 0 | 4.52 | 89 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | PHILLIPS EXPLORATION INC | Produced Fluid | 250.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid | 150.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2012 | XTO ENERGY INC | Produced Fluid | 206.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2013 | XTO ENERGY INC | Produced Fluid | 285.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101674 |
2015 | XTO ENERGY INC | Produced Fluid | 3.00 Bbl | CENT WASTE TRT FAC NPDES | PA0095273 |
2015 | XTO ENERGY INC | Produced Fluid | 199.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2015 | XTO ENERGY INC | Produced Fluid | 3.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2016 | XTO ENERGY INC | Produced Fluid | 422.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 343.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2017 | XTO ENERGY INC | Produced Fluid | 45.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 105.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XTO ENERGY INC | Produced Fluid | 192.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 390.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Other Oil & Gas Wastes | 25.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 240.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1758367 | Primary Facility | 2008-12-23 | Routine/Complete Inspection | No Violations Noted | |
1758846 | Primary Facility | 2008-12-29 | Drilling/Alteration | No Violations Noted | |
1760288 | Primary Facility | 2008-01-06 | Drilling/Alteration | No Violations Noted | |
1763640 | Primary Facility | 2009-01-21 | Routine/Complete Inspection | No Violations Noted | |
1902835 | Primary Facility | 2010-07-26 | Routine/Complete Inspection | No Violations Noted | |
1930943 | Primary Facility | 2010-11-30 | Site Restoration | No Violations Noted | Well site restored. Well equipped for production. Two 210 barrel tanks on site are diked and fenced. At least 70% vegetative cover has been attained. |
1988451 | Primary Facility | 2011-07-14 | Routine/Partial Inspection | No Violations Noted | |
2053011 | Primary Facility | 2012-03-20 | Routine/Partial Inspection | No Violations Noted |
For data sources see[7]