If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-21903 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.793506,"lon":-79.829056,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Jefferson Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 147573 | |
Farm/Lease Name: PAUL SMITH UNIT 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2011-10-21 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.793506 | |
Longitude: -79.829056 |
Date | Event |
---|---|
2011-10-21 | New Permit Application |
2012-02-20 | Performed Spud Operation |
2012-04-29 | Drilling Completion |
2012-09-01 | Perforation |
2014-04-01 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-11-07 | 2012-11-07 | 6,151 | 5,023,946 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Acid Corrosion Inhibitor - EcoAcid CI | Geosafe Chemicals | Corrosion Inhibitor | Other -(non hazardous) | 50.00 | 0.00022000 | ||
100.00 | ||||||||
Diethylene glycol monobutyl ether | 112-34-5 | 50.00 | 0.00022000 | |||||
Water | Water | 7732-18-5 | 100.00 | 89.72 | ||||
Scale Inhibitor - MC-MX-588-2 | Multi-Chem Group | Scale Inhibitor | ||||||
Other -(non hazardous) | 100.00 | 0.01 | ||||||
Biocide - MC 8520 | Multi-Chem Group | Biocide | 2-Amino-2-methylpropan-1-ol | 124-68-5 | 0.50 | 0.00006000 | ||
3,4,4-Trimethyloxazolidine | 75673-43-7 | 4.50 | 0.00054000 | |||||
4,4-Dimethyloxazolidine | 51200-87-4 | 95.00 | 0.01 | |||||
Clay Stabilizer - ClaChek G | Shrieve | Clay Stabilizer | Not hazardous | 70.00 | 0.00270000 | |||
Water | 7732-18-5 | 30.00 | 0.00110000 | |||||
Acid - 15 HCl Acid | PPG Industries | Acid | ||||||
Hydrochloric acid | 7647-01-0 | 15.00 | 0.19 | |||||
Other -(non hazardous) | 85.00 | 1.05 | ||||||
Sand | Proppant | Quartz | 14808-60-7 | 100.00 | 8.88 | |||
Friction Reducer - MC MX-14-5 | Multi-Chem Group | Friction Reducer | Other -(non hazardous) | 70.00 | 0.05 | |||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.02 | |||||
Biocide - MC 8650 | Multi-Chem Group | Biocide | Glutaraldehyde | 111-30-8 | 60.00 | 0.00320000 | ||
Other -(non hazardous) | 40.00 | 0.00210000 | ||||||
Acid - 7.5 HCl Acid | PPG Industries | Acid | ||||||
Other -(non hazardous) | 92.50 | 0.04 | ||||||
Hydrochloric acid | 7647-01-0 | 7.50 | 0.00400000 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 388,504.00 | 194 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 615,240.00 | 357 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 468,313.00 | 359 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 249,345.00 | 272 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 382,649.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 228,591.86 | 266 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 291,679.93 | 351 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | XTO ENERGY INC | Drill Cuttings | 850.68 Tons | CENT WASTE TRT FAC NPDES DISCHARGE | 100403 |
2012 | XTO ENERGY INC | Drill Cuttings | 850.68 Tons | CENT WASTE TRT FAC NPDES | 100403 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 95.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101674 |
2013 | XTO ENERGY INC | Produced Fluid | 85.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | XTO ENERGY INC | Fracturing Fluid Waste | 148.11 Tons | LANDFILL | 100585 |
2013 | XTO ENERGY INC | Produced Fluid | 215.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 220.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 4,085.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 4,085.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 307.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 331.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2014 | XTO ENERGY INC | Produced Fluid | 216.20 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2014 | XTO ENERGY INC | Produced Fluid | 3,341.42 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 119.90 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2015 | XTO ENERGY INC | Produced Fluid | 120.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2015 | XTO ENERGY INC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2015 | XTO ENERGY INC | Produced Fluid | 1,820.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 207.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 335.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 385.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 1,507.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 43.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2018 | XTO ENERGY INC | Produced Fluid | 1,629.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 178.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 393.47 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 831.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 93.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2044869 | Primary Facility | 2012-02-23 | Drilling/Alteration | No Violations Noted | |
2048415 | Primary Facility | 2012-02-28 | Routine/Partial Inspection | No Violations Noted | |
2056775 | Primary Facility | 2012-04-04 | Routine/Partial Inspection | No Violations Noted | |
2059527 | Primary Facility | 2012-04-12 | Drilling/Alteration | No Violations Noted | |
2064084 | Primary Facility | 2012-04-30 | Drilling/Alteration | No Violations Noted | |
2121463 | Primary Facility | 2012-12-03 | Routine/Partial Inspection | No Violations Noted | |
2139845 | Primary Facility | 2013-02-14 | Routine/Partial Inspection | No Violations Noted | |
2163782 | Primary Facility | 2013-05-01 | Routine/Partial Inspection | No Violations Noted | |
2366298 | Primary Facility | 2015-04-29 | Routine/Partial Inspection | No Violations Noted | |
2374853 | Primary Facility | 2015-05-27 | Routine/Partial Inspection | No Violations Noted | |
2692786 | Primary Facility | 2018-02-09 | Routine/Partial Inspection | No Violations Noted | On 02/09/2018, WQS Brian MacQuarrie onsite. Site sign installed and maintained. One well properly tagged and in production. One 400 bbl produced water tank installed within stainless steel secondary containment. Freshwater impoundment fenced in and located adjacent to well pad. Snow on ground. |
For data sources see[8]