If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-21938 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.812442,"lon":-79.873736,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Jefferson Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 149702 | |
Farm/Lease Name: HOLY TRINITY MONASTERY B UNIT 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2012-02-17 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.812442 | |
Longitude: -79.873736 |
Date | Event |
---|---|
2012-02-17 | New Permit Application |
2012-07-09 | Performed Spud Operation |
2012-08-19 | Drilling Completion |
2012-10-24 | Perforation |
2014-04-01 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-12-18 | 2012-12-18 | 6,061 | 6,432,741 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Other -(non hazardous) | 40.0 | 0.0023 | |||||
Hydrochloric Acid (15-40) blended down to 7.5 | 7647-01-0 | 7.5 | 0.0471 | |||||
Hydrochloric Acid (15-40) blended down to 15 | 7647-01-0 | 15.0 | 0.0491 | |||||
3,4,4-Trimethyloxazolidine | 75673-43-7 | 4.5 | 0.0004 | |||||
4,4 -Dimethyloxazolidine | 51200-87-4 | 95.0 | 0.0091 | |||||
Other -(non hazardous) | 100.0 | 0.0076 | ||||||
Other -(non hazardous) | 85.0 | 0.2784 | ||||||
Other -(non hazardous) | 50.0 | 0.0004 | ||||||
Short Chained Glycol Ether | 112-34-5 | 50.0 | 0.0004 | |||||
Hydrotreated light distillates (10-30) | 64742-47-8 | 30.0 | 0.0242 | |||||
Other -(non hazardous) | 70.0 | 0.0564 | ||||||
Glutaraldehyde | 111-30-8 | 60.0 | 0.0034 | |||||
2-Amino-2-Methyl-1-Propanol | 124-68-5 | 0.5 | 0.0001 | |||||
Other -(non hazardous) | 92.5 | 0.5803 | ||||||
Acid Corrosion Inhibitor - EcoAcid CI | GeoSafe | Corrosion Inhibitor | 100.0 | None | ||||
Friction Reducer - MC MX-14-5 | Multi-Chem | Friction Reducer | None | None | ||||
Biocide - MC 8650 | Multi-Chem | Biocide | None | None | ||||
Water | Water | 7732-18-5 | 100.0 | 91.278 | ||||
Biocide - MC 8520 | Multi-Chem | Biocide | None | None | ||||
Sand | Proppant | Crystaline Silica | 14808-60-7 | 100.0 | 7.663 | |||
Acid - 7.5 HCl Acid | PPG | Acid | None | None | ||||
Scale Inhibitor - MC-MX-588-2 | Multi-Chem | Scale Inhibitor | None | None | ||||
Acid - 15 HCl Acid | PPG | Acid | None | None |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 269,317.00 | 164 | 0.00 | 0 | 126.47 | 156 |
2014 | XTO ENERGY INC | 908,812.00 | 357 | 0.00 | 0 | 348.26 | 173 |
2015 | XTO ENERGY INC | 599,180.00 | 345 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 403,045.00 | 329 | 0.00 | 0 | 102.34 | 46 |
2017 | XTO ENERGY INC | 421,234.00 | 365 | 0.00 | 0 | 11.67 | 30 |
2018 | XTO ENERGY INC | 250,773.29 | 344 | 0.00 | 0 | 8.49 | 137 |
2019 | XTO ENERGY INC | 295,911.54 | 291 | 0.00 | 0 | 6.19 | 97 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | XTO ENERGY INC | Drill Cuttings | 1,003.20 Tons | LANDFILL | 100403 |
2013 | XTO ENERGY INC | Drill Cuttings | 49.00 Tons | LANDFILL | 100403 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 551.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XTO ENERGY INC | Fracturing Fluid Waste | 79.00 Tons | LANDFILL | 100585 |
2013 | XTO ENERGY INC | Produced Fluid | 1,023.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2013 | XTO ENERGY INC | Produced Fluid | 1,748.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 377.00 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 101674 |
2013 | XTO ENERGY INC | Produced Fluid | 1,748.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 35.40 Bbl | INJECTION DISPOSAL WELL | 34-155-23732 |
2014 | XTO ENERGY INC | Produced Fluid | 2,019.26 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2014 | XTO ENERGY INC | Produced Fluid | 6,940.97 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 120.40 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2014 | XTO ENERGY INC | Produced Fluid | 315.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 315.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2015 | XTO ENERGY INC | Produced Fluid | 358.73 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2015 | XTO ENERGY INC | Produced Fluid | 475.50 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2015 | XTO ENERGY INC | Produced Fluid | 3,338.70 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2015 | XTO ENERGY INC | Produced Fluid | 221.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2016 | XTO ENERGY INC | Produced Fluid | 1,068.61 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 120.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2016 | XTO ENERGY INC | Produced Fluid | 573.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 11.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 120.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 180.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2017 | XTO ENERGY INC | Produced Fluid | 1,057.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 1,497.22 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 65.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 110.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Waste Water Treatment Sludge | 1.24 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2019 | XTO ENERGY INC | Produced Fluid | 40.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2082626 | Primary Facility | 2012-07-12 | Drilling/Alteration | No Violations Noted | |
2093388 | Primary Facility | 2012-08-21 | Routine/Partial Inspection | No Violations Noted | |
2100759 | Primary Facility | 2012-09-17 | Routine/Partial Inspection | No Violations Noted | |
2121460 | Primary Facility | 2012-12-03 | Routine/Partial Inspection | No Violations Noted | |
2135307 | Primary Facility | 2013-01-30 | Routine/Partial Inspection | No Violations Noted | |
2146198 | Primary Facility | 2013-03-06 | Routine/Partial Inspection | No Violations Noted | |
2169422 | Primary Facility | 2013-05-21 | Routine/Partial Inspection | No Violations Noted | |
2288952 | Primary Facility | 2014-07-15 | Routine/Partial Inspection | No Violations Noted | |
2745996 | Primary Facility | 2018-06-26 | Routine/Partial Inspection | No Violations Noted | On 6/26/2018, WQS Brian MacQuarrie onsite. Site sign maintained at entrance. Access road maintained. Two wells in production, 1H-019-21938 and 2H-019-21961. Production tanks and GPUs installed within containment. No apparent issues. |
For data sources see[8]