If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-21952 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.829969,"lon":-79.888519,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Butler Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 145480 | |
Farm/Lease Name: HINCH SMITH UNIT 2H | |
License Status: | |
Spud Date: | |
Permit Date: 2012-05-10 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.829969 | |
Longitude: -79.888519 |
Date | Event |
---|---|
2012-05-10 | New Permit Application |
2012-07-03 | Performed Spud Operation |
2012-09-07 | Drilling Completion |
2012-11-19 | Perforation |
2013-01-10 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-02-08 | 2013-03-12 | 5,842 | 5,621,500 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Scale Inhibitor MC-MX-588-2 | MultiChem | Scale Inhibitor | Other - (non-hazardous) | NA | 100 | 0.00960628 | 5024.29 |
Acid Corrosion Inhibitor UniHib-G | Universal | Corrosion Inhibitor | 2-Ethyl Hexanol | 104-76-7 | 25 | 0.000378382 | 197.902 | |
Short Chained Glycol Ether | 112-34-5 | 50 | 0.000756764 | 395.803 | ||||
Other - (non-hazardous) | NA | 25 | 0.000378382 | 197.902 | ||||
Water | XTO | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 89.6932 | 46,911,400.0 | |
Sand (Proppant) | Universal | Proppant | Silica Substrate | NA | 100 | 8.5706 | 4,482,600.0 | |
Gel Breaker, Breaker 10L | Universal | Gel Breaker | Ethylene Glycol | 107-21-1 | 60 | 0.00003446 | 18.025 | |
Other - (non-hazardous) | NA | 40 | 0.00002298 | 12.017 | ||||
Clay Stabilizer, ClayCheck G | Universal | Clay Stabilizer | Other - (non-hazardous) | NA | 70 | 0.00480078 | 2510.91 | |
Water | 7732-18-5 | 30 | 0.00205748 | 1076.1 | ||||
Biocide MC-8520 | MultiChem | Biocide | 4,4 Dimethyloxazolidine | 51200-87-4 | 95 | 0.00871927 | 4560.36 | |
3,4,4 Trimethyloxazolidine | 75673-43-7 | 4.5 | 0.000413018 | 216.017 | ||||
2-Amino-2-Methyl-1-Propanol | 124-68-5 | 0.5 | 0.00004589 | 24.002 | ||||
Hydrochloric Acid (15%) | Universal | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.245928 | 128626 | |
Other - (non-hazardous) | NA | 85 | 1.39359 | 728879 | ||||
Friction Reducer MC-MX-14-5 | MultiChem | Friction Reducer | Other - (non-hazardous) | NA | 70 | 0.0437816 | 22898.7 | |
Hydrotreated Light Distillates (10-30%) | 64742-47-8 | 30 | 0.0187635 | 9813.72 | ||||
Unigel 5F | Universal | Gel | Guar Gum | NA | 95 | 0.00227046 | 1187.5 | |
Other - (non-hazardous) | NA | 5 | 0.000119498 | 62.5 | ||||
Biocide MC-8650 | MultiChem | Biocide | Other - (non-hazardous) | NA | 40 | 0.00182153 | 952.696 | |
Glutaraldehyde | 111-30-8 | 60 | 0.00273229 | 1429.04 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 272,684.00 | 180 | 0.00 | 0 | 176.78 | 174 |
2014 | XTO ENERGY INC | 448,130.00 | 356 | 0.00 | 0 | 433.61 | 356 |
2015 | XTO ENERGY INC | 336,222.00 | 337 | 0.00 | 0 | 375.51 | 197 |
2016 | XTO ENERGY INC | 295,552.00 | 326 | 0.00 | 0 | 174.03 | 258 |
2017 | XTO ENERGY INC | 162,084.00 | 233 | 0.00 | 0 | 36.30 | 150 |
2018 | XTO ENERGY INC | 164,777.22 | 226 | 0.00 | 0 | 142.91 | 226 |
2019 | XTO ENERGY INC | 226,163.35 | 306 | 0.00 | 0 | 57.08 | 275 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | XTO ENERGY INC | Drill Cuttings | 1,121.36 Tons | LANDFILL | 100403 |
2013 | XTO ENERGY INC | Produced Fluid | 425.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | XTO ENERGY INC | Fracturing Fluid Waste | 104.91 Tons | LANDFILL | 100585 |
2013 | XTO ENERGY INC | Produced Fluid | 91.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23732 |
2013 | XTO ENERGY INC | Produced Fluid | 100.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2013 | XTO ENERGY INC | Produced Fluid | 1,137.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2013 | XTO ENERGY INC | Produced Fluid | 6,068.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 191.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2013 | XTO ENERGY INC | Produced Fluid | 991.00 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 101674 |
2013 | XTO ENERGY INC | Produced Fluid | 6,068.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 875.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2014 | XTO ENERGY INC | Produced Fluid | 1,442.90 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2014 | XTO ENERGY INC | Produced Fluid | 7,561.10 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 178.30 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2014 | XTO ENERGY INC | Produced Fluid | 100.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 100.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 179.80 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2015 | XTO ENERGY INC | Produced Fluid | 483.80 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2015 | XTO ENERGY INC | Produced Fluid | 408.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2015 | XTO ENERGY INC | Produced Fluid | 3,086.70 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 1,384.20 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 120.90 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2016 | XTO ENERGY INC | Soil Contaminated by Oil & Gas Related Spills | 0.03 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2016 | XTO ENERGY INC | Soil Contaminated by Oil | 0.03 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2016 | XTO ENERGY INC | Produced Fluid | 1,290.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 99.60 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2017 | XTO ENERGY INC | Produced Fluid | 120.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 150.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 1,219.51 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 62.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20114 |
2018 | XTO ENERGY INC | Other Oil & Gas Wastes | 5.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 120.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | XTO ENERGY INC | Produced Fluid | 924.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 124.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Produced Fluid | 359.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 1,083.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 216.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Produced Fluid | 333.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2093399 | Primary Facility | 2012-08-21 | Routine/Partial Inspection | No Violations Noted | |
2095601 | Primary Facility | 2012-08-28 | Drilling/Alteration | No Violations Noted | |
2215494 | Primary Facility | 2013-10-03 | Routine/Partial Inspection | No Violations Noted | |
2215575 | Primary Facility | 2013-10-17 | Routine/Partial Inspection | No Violations Noted | |
2236839 | Primary Facility | 2014-01-14 | Routine/Partial Inspection | No Violations Noted | |
2275261 | Primary Facility | 2014-05-29 | Routine/Complete Inspection | No Violations Noted | |
2543521 | Primary Facility | 2016-12-07 | Routine/Partial Inspection | No Violations Noted | |
2651154 | Primary Facility | 2017-10-24 | Routine/Partial Inspection | No Violations Noted | On site for a routine partial inspection.
Well has been drilled, completed, and in production. Well head is fenced, is protected with jersey barriers, and has a well tag. Production equipment (tank battery & GPU) on secondary containment. Combustor on site. Gathering pipeline header on site off the well pad. Site ID sign on site. PCSM plan implemented & PCSM BMPs installed. Site has 100% vegetation. |
2699768 | Primary Facility | 2018-02-27 | Routine/Partial Inspection | No Violations Noted | On 02/27/2018, WQS Brian MacQuarrie onsite. Site sign maintained at entrance. Ten wells installed and tagged. Nine in production. The 1H Permit No. 37-019-21878 currently in inactive status. Tank battery consists of eleven 400 bbl tanks installed within secondary steel containment structure. Freshwater impoundment installed and fenced in adjacent to well pad. No apparent issues. |
2715711 | Primary Facility | 2018-04-04 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, well was producing. There was approx. 1500 psi showing on the tubing gauge. Well was properly labeled and the Emergency Response sign is posted at the lease entrance. There was a very large lined, steel dike that had 7 tanks on one side and 4 on the other. All except 1 are for produced water. Each tank is labeled for which well it is associated with. The separators are also labeled. There are 10 of these with line heaters and are between the tanks. There was also a lined impoundment along the lease road. It still had plenty of freeboard, even after the heavy rains. |
2842804 | Primary Facility | 2019-02-21 | Routine/Partial Inspection | No Violations Noted | On 2/21/2019, WQS Brian MacQuarrie onsite. While onsite meet Bill Rice (XTO-well tender). Ten wells in production; 1H (019-21878), 2H (019-21952), 3H (019-21953), 4H (019-21923), 5H (019-22159), 6H (019-22119), 7H (019-22120), 8H (019-22084), 9H (019-22085) and 10HB (019-22205). Tank battery consists of eleven 400 bbl tanks installed within containment structure ( ten tanks containing production water and one tank containing condensate). Ten gas processing units installed within containment structure. Freshwater impoundment fenced in and locked. Well sign and access road maintained. Previously disturbed areas vegetated and restored. Erosion and Sedimentation BMPs maintained. |
For data sources see[8]