If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-21961 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.812453,"lon":-79.873703,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Jefferson Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 149702 | |
Farm/Lease Name: HOLY TRINITY MONASTERY B UNIT 2H | |
License Status: | |
Spud Date: | |
Permit Date: 2012-08-03 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.812453 | |
Longitude: -79.873703 |
Date | Event |
---|---|
2012-08-03 | New Permit Application |
2012-08-19 | Performed Spud Operation |
2012-09-14 | Drilling Completion |
2012-10-25 | Perforation |
2014-04-01 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-12-19 | 2012-12-19 | 5,950 | 5,721,474 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Scale Inhibitor - MC-MX-588-2 | Multi-Chem | Scale Inhibitor | None | None | |||
Water | Water | 7732-18-5 | 100.0 | 90.4985 | ||||
Acid Corrosion Inhibitor - EcoAcid CI | GeoSafe | Corrosion Inhibitor | 100.0 | None | ||||
Acid - 7.5 HCl Acid | PPG | Acid | None | None | ||||
Biocide - MC 8520 | Multi-Chem | Biocide | None | None | ||||
Other -(non hazardous) | 70.0 | 0.0506 | ||||||
Glutaraldehyde | 111-30-8 | 60.0 | 0.0039 | |||||
4,4 -Dimethyloxazolidine | 51200-87-4 | 95.0 | 0.0086 | |||||
Other -(non hazardous) | 50.0 | 0.0006 | ||||||
Other -(non hazardous) | 92.5 | 0.5223 | ||||||
Other -(non hazardous) | 85.0 | 0.3067 | ||||||
Hydrochloric Acid (15-40) blended down to 15 | 7647-01-0 | 15.0 | 0.0541 | |||||
Water | 7732-18-5 | 30.0 | None | |||||
3,4,4-Trimethyloxazolidine | 75673-43-7 | 4.5 | 0.0004 | |||||
Hydrochloric Acid (15-40) blended down to 7.5 | 7647-01-0 | 7.5 | 0.0423 | |||||
Short Chained Glycol Ether | 112-34-5 | 50.0 | 0.0006 | |||||
Other -(non hazardous) | 40.0 | 0.0026 | ||||||
2-Amino-2-Methyl-1-Propanol | 124-68-5 | 0.5 | 0.0001 | |||||
Hydrotreated light distillates (10-30) | 64742-47-8 | 30.0 | 0.0217 | |||||
Not Hazardous | 70.0 | None | ||||||
Other -(non hazardous) | 100.0 | 0.0075 | ||||||
Acid - 15 HCl Acid | PPG | Acid | None | None | ||||
Clay Chek G | Shrieve | Clay Stabilizer | None | None | ||||
Sand | Proppant | Crystaline Silica | 14808-60-7 | 100.0 | 8.4797 | |||
Biocide - MC 8650 | Multi-Chem | Biocide | None | None | ||||
Friction Reducer - MC MX-14-5 | Multi-Chem | Friction Reducer | None | None |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 381,020.00 | 183 | 0.00 | 0 | 46.30 | 179 |
2014 | XTO ENERGY INC | 654,839.00 | 357 | 0.00 | 0 | 116.25 | 184 |
2015 | XTO ENERGY INC | 488,488.00 | 346 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 304,805.00 | 338 | 0.00 | 0 | 61.39 | 149 |
2017 | XTO ENERGY INC | 245,901.00 | 290 | 0.00 | 0 | 13.10 | 179 |
2018 | XTO ENERGY INC | 215,851.56 | 267 | 5.00 | 30 | 24.53 | 145 |
2019 | XTO ENERGY INC | 85,023.53 | 139 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | XTO ENERGY INC | Drill Cuttings | 1,003.19 Tons | LANDFILL | 100403 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 115.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101674 |
2013 | XTO ENERGY INC | Produced Fluid | 387.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2013 | XTO ENERGY INC | Drill Cuttings | 49.00 Tons | LANDFILL | 100403 |
2013 | XTO ENERGY INC | Fracing Fluid Waste | 994.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2013 | XTO ENERGY INC | Fracturing Fluid Waste | 79.00 Tons | LANDFILL | 100585 |
2013 | XTO ENERGY INC | Produced Fluid | 1,125.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2013 | XTO ENERGY INC | Produced Fluid | 6,436.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 212.00 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2013 | XTO ENERGY INC | Produced Fluid | 1,012.00 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 101674 |
2013 | XTO ENERGY INC | Produced Fluid | 6,436.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2013 | XTO ENERGY INC | Produced Fluid | 667.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2014 | XTO ENERGY INC | Produced Fluid | 80.80 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2014 | XTO ENERGY INC | Produced Fluid | 206.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2014 | XTO ENERGY INC | Produced Fluid | 1,243.27 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2014 | XTO ENERGY INC | Produced Fluid | 6,410.55 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 240.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2014 | XTO ENERGY INC | Produced Fluid | 108.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 108.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2015 | XTO ENERGY INC | Produced Fluid | 687.25 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2015 | XTO ENERGY INC | Produced Fluid | 424.20 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2015 | XTO ENERGY INC | Produced Fluid | 3,427.53 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 769.30 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 180.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2016 | XTO ENERGY INC | Produced Fluid | 861.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 107.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 230.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 938.08 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 1,115.70 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Waste Water Treatment Sludge | 1.24 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2019 | XTO ENERGY INC | Produced Fluid | 105.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2092778 | Primary Facility | 2012-08-20 | Drilling/Alteration | No Violations Noted | |
2093392 | Primary Facility | 2012-08-21 | Routine/Partial Inspection | No Violations Noted | |
2095595 | Primary Facility | 2012-08-28 | Drilling/Alteration | No Violations Noted | |
2098610 | Primary Facility | 2012-09-10 | Drilling/Alteration | No Violations Noted | |
2100792 | Primary Facility | 2012-09-17 | Routine/Partial Inspection | No Violations Noted | |
2121462 | Primary Facility | 2012-12-03 | Routine/Partial Inspection | No Violations Noted | |
2135310 | Primary Facility | 2013-01-30 | Routine/Partial Inspection | No Violations Noted | |
2146199 | Primary Facility | 2013-03-06 | Routine/Partial Inspection | No Violations Noted | |
2169423 | Primary Facility | 2013-05-21 | Routine/Partial Inspection | No Violations Noted | |
2745997 | Primary Facility | 2018-06-26 | Routine/Partial Inspection | No Violations Noted | On 6/26/2018, WQS Brian MacQuarrie onsite. Site sign maintained at entrance. Access road maintained. Two wells in production, 1H-019-21938 and 2H-019-21961. Production tanks and GPUs installed within containment. No apparent issues. |
For data sources see[8]