If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-21985 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.843103,"lon":-79.831347,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Summit Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 144652 | |
Farm/Lease Name: KOZIK BROTHERS UNIT 2H | |
License Status: | |
Spud Date: | |
Permit Date: 2012-11-20 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.843103 | |
Longitude: -79.831347 |
Date | Event |
---|---|
2012-11-20 | New Permit Application |
2013-01-11 | Performed Spud Operation |
2013-03-14 | Drilling Completion |
2013-06-04 | Perforation |
2014-01-03 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-07-25 | 2013-08-13 | 5,959 | 6,916,060 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Biocide, EC6116A | Nalco | Biocide | Polyethylene Glycol | 25322-68-3 | 60 | 0.0105281 | 6759.45 |
Dibromoacetonitrile | 3252-43-5 | 5 | 0.000877343 | 563.288 | ||||
Other - (non-hazardous) | NA | 5 | 0.000877343 | 563.288 | ||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30 | 0.00526406 | 3379.72 | ||||
Scale Inhibitor, ScaleHib A | Nalco | Scale Inhibitor | Other - (non-hazardous) | NA | 70 | 0.00792108 | 5085.63 | |
Ethylene Glycol | 107-21-1 | 30 | 0.00339475 | 2179.56 | ||||
Acid Inhibitor, Unihib G | GeoSafe | Acid Inhibitor | Ethoxylated alcohol | NA | 35 | 0.000171728 | 110.256 | |
Short Chained Glycol Ether | 112-34-5 | 50 | 0.000245326 | 157.509 | ||||
Proprietary Blend Surfactants | NA | 35 | 0.000171728 | 110.256 | ||||
Clay Stabilizer, Cla-Chek G | Shrieve | Clay Stabilizer | Other - (non-hazardous) | NA | 85 | 0.000739775 | 474.964 | |
Water | 7732-18-5 | 15 | 0.000130549 | 83.817 | ||||
Hydrochloric Acid (15%) | PPG Industries | Acidizing | Other - (non-hazardous) | NA | 85 | 0.0616221 | 39563.7 | |
Hydrochloric Acid | 7647-01-0 | 15 | 0.0108745 | 6981.83 | ||||
Friction Reducer, Unislick ST-50 | CESI Chemical | Friction Reducer | Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.0173381 | 11131.8 | |
Other - (non-hazardous) | NA | 70 | 0.0404557 | 25974.1 | ||||
Hydrochloric Acid (7.5%) | PPG Industries | Acidizing | Other - (non-hazardous) | NA | 92.5 | 0.913101 | 586246 | |
Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0740352 | 47533.4 | ||||
Sand (Proppant) | Universal | Proppant | Silica Substrate | NA | 100 | 8.95975 | 5,752,500.0 | |
Water | XTO | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 89.8926 | 57,714,500.0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | XTO ENERGY INC | 793.00 | 5 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 514,755.00 | 346 | 0.00 | 0 | 117.53 | 346 |
2015 | XTO ENERGY INC | 291,168.00 | 300 | 0.00 | 0 | 76.85 | 91 |
2016 | XTO ENERGY INC | 247,165.00 | 319 | 0.00 | 0 | 147.94 | 191 |
2017 | XTO ENERGY INC | 135,099.00 | 159 | 0.00 | 0 | 95.04 | 107 |
2018 | XTO ENERGY INC | 247,894.56 | 335 | 1.67 | 30 | 45.78 | 226 |
2019 | XTO ENERGY INC | 209,193.37 | 361 | 0.00 | 0 | 9.17 | 119 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | XTO ENERGY INC | Drill Cuttings | 2,019.00 Tons | LANDFILL | 100403 |
2013 | XTO ENERGY INC | Drilling Fluid Waste | 220.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 11,977.70 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Fracing Fluid Waste | 110.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23223 |
2014 | XTO ENERGY INC | Fracing Fluid Waste | 2,834.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2014 | XTO ENERGY INC | Produced Fluid | 694.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2014 | XTO ENERGY INC | Fracing Fluid Waste | 2,225.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 1,505.40 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2014 | XTO ENERGY INC | Fracing Fluid Waste | 362.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2014 | XTO ENERGY INC | Fracing Fluid Waste | 72.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23759 |
2014 | XTO ENERGY INC | Produced Fluid | 63.60 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2014 | XTO ENERGY INC | Fracing Fluid Waste | 362.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2014 | XTO ENERGY INC | Produced Fluid | 128.00 Bbl | CENT WASTE TRT FAC NPDES | PA0254185 |
2014 | XTO ENERGY INC | Fracing Fluid Waste | 84.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23732 |
2014 | XTO ENERGY INC | Produced Fluid | 128.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2014 | XTO ENERGY INC | Fracing Fluid Waste | 220.40 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2015 | XTO ENERGY INC | Produced Fluid | 697.80 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2015 | XTO ENERGY INC | Produced Fluid | 610.60 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2015 | XTO ENERGY INC | Produced Fluid | 3,534.20 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 2,324.60 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 120.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2016 | XTO ENERGY INC | Produced Fluid | 119.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2016 | XTO ENERGY INC | Produced Fluid | 120.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2016 | XTO ENERGY INC | Produced Fluid | 1,239.26 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 208.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 175.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 286.84 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2017 | XTO ENERGY INC | Produced Fluid | 1,105.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 120.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2018 | XTO ENERGY INC | Produced Fluid | 321.68 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | XTO ENERGY INC | Produced Fluid | 3,647.93 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 1,180.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 575.78 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 1,624.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 470.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2130739 | Primary Facility | 2013-01-14 | Drilling/Alteration | No Violations Noted | |
2147248 | Primary Facility | 2013-03-12 | Drilling/Alteration | No Violations Noted | |
2167609 | Primary Facility | 2013-05-13 | Routine/Partial Inspection | No Violations Noted | |
2569628 | Primary Facility | 2017-02-28 | Routine/Partial Inspection | No Violations Noted | |
2692728 | Primary Facility | 2018-02-09 | Routine/Partial Inspection | No Violations Noted | On 2//09/2018, WQS Brian MacQuarrie onsite. Site sign posted and maintained at entrance. Five wells properly tagged and in production. Six 400 bbl tanks installed within secondary containment. Five gas processing units installed within secondary containment. Snow on ground during inspection. No apparent issues. |
For data sources see[8]