X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22010

Well Details

Well ID: 37-019-22010
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Penn Township
Operator Name: XTO ENERGY INC
Well Pad ID: 153115
Farm/Lease Name: GODFREY UNIT B1H
License Status:
Spud Date:
Permit Date: 2012-12-28
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.791642
Longitude: -79.9052

For data sources see[1][2][3]

Well History

Date Event
2012-12-28 New Permit Application
2013-03-20 Performed Spud Operation
2013-05-12 Drilling Completion
2013-07-16 Perforation
2015-01-21 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-09-16 2013-10-03 5,920 5,011,440 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water XTO Carrier/Base Fluid Water 7732-18-5 100 87.0422 41,820,500.0
Acid Inhibitor, Unihib G GeoSafe Acid Inhibitor Ethoxylated alcohol NA 35 0.000206362 99.149
Short Chained Glycol Ether 112-34-5 50 0.000294803 141.642
Proprietary Blend Surfactants NA 35 0.000206362 99.149
Scale Inhibitor, ScaleHib A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00311542 1496.84
Other - (non-hazardous) NA 70 0.00726932 3492.63
Sand (Proppant) Universal Proppant Silica Substrate NA 100 11.6099 5,578,100.0
Biocide, EC6116A Nalco Biocide Dibromoacetonitrile 3252-43-5 5 0.000800045 384.392
Polyethylene Glycol 25322-68-3 60 0.00960054 4612.7
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00480027 2306.35
Other - (non-hazardous) NA 5 0.000800045 384.392
Hydrochloric Acid (15%) PPG Industries Acidizing Hydrochloric Acid 7647-01-0 15 0.013921 6688.51
Other - (non-hazardous) NA 85 0.0788856 37901.6
Friction Reducer, Unislick ST-50 CESI Chemical Friction Reducer Petroleum distillates, hydrotreated light 64742-47-8 30 0.0148215 7121.18
Other - (non-hazardous) NA 70 0.0345835 16616.1
Clay Stabilizer, Cla-Chek G Shrieve Clay Stabilizer Water 7732-18-5 15 0.00002814 13.519
Other - (non-hazardous) NA 85 0.000159444 76.607
Hydrochloric Acid (7.5%) PPG Industries Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0883944 42470.2
Other - (non-hazardous) NA 92.5 1.0902 523799

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2014 XTO ENERGY INC 663,143.00 306 0.00 0 0.00 0
2015 XTO ENERGY INC 478,291.00 346 0.00 0 44.62 31
2016 XTO ENERGY INC 340,588.00 331 0.00 0 27.97 81
2017 XTO ENERGY INC 426,923.00 338 0.00 0 0.00 0
2018 XTO ENERGY INC 321,812.19 353 0.00 0 0.00 0
2019 XTO ENERGY INC 214,034.88 276 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 XTO ENERGY INC Drill Cuttings 622.15 Tons LANDFILL 100403
2014 XTO ENERGY INC Fracing Fluid Waste 3,103.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Produced Fluid 184.70 Bbl INJECTION DISPOSAL WELL 34-133-21076
2014 XTO ENERGY INC Produced Fluid 1,578.17 Bbl INJECTION DISPOSAL WELL 34-133-24096
2014 XTO ENERGY INC Produced Fluid 7,478.10 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Fracing Fluid Waste 377.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2014 XTO ENERGY INC Produced Fluid 220.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid 625.90 Bbl INJECTION DISPOSAL WELL 34-133-24096
2015 XTO ENERGY INC Produced Fluid 3,452.40 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 XTO ENERGY INC Produced Fluid 300.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2016 XTO ENERGY INC Produced Fluid 791.60 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 1,259.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 75.60 Bbl INJECTION DISPOSAL WELL 34-133-21076
2017 XTO ENERGY INC Produced Fluid 377.28 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 600.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017 XTO ENERGY INC Produced Fluid 1,276.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 160.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018 XTO ENERGY INC Produced Fluid 1,255.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 527.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 21.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Waste Water Treatment Sludge 1.16 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2019 XTO ENERGY INC Produced Fluid 388.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 93.00 Bbl INJECTION DISPOSAL WELL 34-133-21076

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2154755 Primary Facility 2013-04-02 Routine/Partial Inspection No Violations Noted
2184437 Primary Facility 2013-07-15 Routine/Partial Inspection No Violations Noted
2239206 Primary Facility 2014-01-15 Routine/Partial Inspection No Violations Noted
2668813 Primary Facility 2017-11-27 Routine/Partial Inspection No Violations Noted At the time of inspection, well was producing. Well integrity appeared to be in good condition, with no signs of any leaks or spills at the well. Well tender onsite gave me pressures of 340 psi on casing and 231 for tubing. There were 4 line heaters and 5 tanks within a lined, steel dike. Well was properly labeled. ER sign remains posted.
2699831 Primary Facility 2018-02-27 Routine/Partial Inspection No Violations Noted On 02/27/2018, WQS Brian MacQuarrie onsite. Site sign posted and maintained at site entrance. Four wells tagged and in production. Five 400 bbl and four gas processing units installed within containment structure. PCSM installed and maintained.
2736992 Primary Facility 2018-06-04 Routine/Partial Inspection No Violations Noted On 6/4/2018, WQS Brian MacQuarrie onsite. Site sign maintained and posted at entrance. Access road has erosion gullies beginning to form. Well site consists of 4 wells, the B1H-019-22010, B2H-019-22011, C2H-019-22021 and C3H-019-22022. Previously disturbed areas well vegetated. PCSM maintained.
2836918 Primary Facility 2019-02-06 Routine/Partial Inspection No Violations Noted On 2/6/2019, WQS Brian MacQuarrie onsite. Well site consists of 4 wells in production, B1H (019-22010), B2H (019-22011), C2H (019-22021) and C3H (019-22022) all properly tagged. The tank battery consists of five 400 bbl tanks ( one condensate and four production water). The PCSM infiltration basin is maintained.

For data sources see[8]

References