If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-22010 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.791642,"lon":-79.9052,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Penn Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 153115 | |
Farm/Lease Name: GODFREY UNIT B1H | |
License Status: | |
Spud Date: | |
Permit Date: 2012-12-28 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.791642 | |
Longitude: -79.9052 |
Date | Event |
---|---|
2012-12-28 | New Permit Application |
2013-03-20 | Performed Spud Operation |
2013-05-12 | Drilling Completion |
2013-07-16 | Perforation |
2015-01-21 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-09-16 | 2013-10-03 | 5,920 | 5,011,440 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | XTO | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 87.0422 | 41,820,500.0 |
Acid Inhibitor, Unihib G | GeoSafe | Acid Inhibitor | Ethoxylated alcohol | NA | 35 | 0.000206362 | 99.149 | |
Short Chained Glycol Ether | 112-34-5 | 50 | 0.000294803 | 141.642 | ||||
Proprietary Blend Surfactants | NA | 35 | 0.000206362 | 99.149 | ||||
Scale Inhibitor, ScaleHib A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.00311542 | 1496.84 | |
Other - (non-hazardous) | NA | 70 | 0.00726932 | 3492.63 | ||||
Sand (Proppant) | Universal | Proppant | Silica Substrate | NA | 100 | 11.6099 | 5,578,100.0 | |
Biocide, EC6116A | Nalco | Biocide | Dibromoacetonitrile | 3252-43-5 | 5 | 0.000800045 | 384.392 | |
Polyethylene Glycol | 25322-68-3 | 60 | 0.00960054 | 4612.7 | ||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30 | 0.00480027 | 2306.35 | ||||
Other - (non-hazardous) | NA | 5 | 0.000800045 | 384.392 | ||||
Hydrochloric Acid (15%) | PPG Industries | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.013921 | 6688.51 | |
Other - (non-hazardous) | NA | 85 | 0.0788856 | 37901.6 | ||||
Friction Reducer, Unislick ST-50 | CESI Chemical | Friction Reducer | Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.0148215 | 7121.18 | |
Other - (non-hazardous) | NA | 70 | 0.0345835 | 16616.1 | ||||
Clay Stabilizer, Cla-Chek G | Shrieve | Clay Stabilizer | Water | 7732-18-5 | 15 | 0.00002814 | 13.519 | |
Other - (non-hazardous) | NA | 85 | 0.000159444 | 76.607 | ||||
Hydrochloric Acid (7.5%) | PPG Industries | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0883944 | 42470.2 | |
Other - (non-hazardous) | NA | 92.5 | 1.0902 | 523799 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 663,143.00 | 306 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 478,291.00 | 346 | 0.00 | 0 | 44.62 | 31 |
2016 | XTO ENERGY INC | 340,588.00 | 331 | 0.00 | 0 | 27.97 | 81 |
2017 | XTO ENERGY INC | 426,923.00 | 338 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 321,812.19 | 353 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 214,034.88 | 276 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | XTO ENERGY INC | Drill Cuttings | 622.15 Tons | LANDFILL | 100403 |
2014 | XTO ENERGY INC | Fracing Fluid Waste | 3,103.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 184.70 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2014 | XTO ENERGY INC | Produced Fluid | 1,578.17 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2014 | XTO ENERGY INC | Produced Fluid | 7,478.10 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Fracing Fluid Waste | 377.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2014 | XTO ENERGY INC | Produced Fluid | 220.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XTO ENERGY INC | Produced Fluid | 625.90 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2015 | XTO ENERGY INC | Produced Fluid | 3,452.40 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2015 | XTO ENERGY INC | Produced Fluid | 300.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2016 | XTO ENERGY INC | Produced Fluid | 791.60 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 1,259.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Produced Fluid | 75.60 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2017 | XTO ENERGY INC | Produced Fluid | 377.28 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 600.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 1,276.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 160.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | XTO ENERGY INC | Produced Fluid | 1,255.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 527.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 21.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Waste Water Treatment Sludge | 1.16 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2019 | XTO ENERGY INC | Produced Fluid | 388.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 93.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2154755 | Primary Facility | 2013-04-02 | Routine/Partial Inspection | No Violations Noted | |
2184437 | Primary Facility | 2013-07-15 | Routine/Partial Inspection | No Violations Noted | |
2239206 | Primary Facility | 2014-01-15 | Routine/Partial Inspection | No Violations Noted | |
2668813 | Primary Facility | 2017-11-27 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, well was producing. Well integrity appeared to be in good condition, with no signs of any leaks or spills at the well. Well tender onsite gave me pressures of 340 psi on casing and 231 for tubing. There were 4 line heaters and 5 tanks within a lined, steel dike. Well was properly labeled. ER sign remains posted. |
2699831 | Primary Facility | 2018-02-27 | Routine/Partial Inspection | No Violations Noted | On 02/27/2018, WQS Brian MacQuarrie onsite. Site sign posted and maintained at site entrance. Four wells tagged and in production. Five 400 bbl and four gas processing units installed within containment structure. PCSM installed and maintained. |
2736992 | Primary Facility | 2018-06-04 | Routine/Partial Inspection | No Violations Noted | On 6/4/2018, WQS Brian MacQuarrie onsite. Site sign maintained and posted at entrance. Access road has erosion gullies beginning to form. Well site consists of 4 wells, the B1H-019-22010, B2H-019-22011, C2H-019-22021 and C3H-019-22022. Previously disturbed areas well vegetated. PCSM maintained. |
2836918 | Primary Facility | 2019-02-06 | Routine/Partial Inspection | No Violations Noted | On 2/6/2019, WQS Brian MacQuarrie onsite. Well site consists of 4 wells in production, B1H (019-22010), B2H (019-22011), C2H (019-22021) and C3H (019-22022) all properly tagged. The tank battery consists of five 400 bbl tanks ( one condensate and four production water). The PCSM infiltration basin is maintained. |
For data sources see[8]