X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22022

Well Details

Well ID: 37-019-22022
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Penn Township
Operator Name: XTO ENERGY INC
Well Pad ID: 153115
Farm/Lease Name: GODFREY C UNIT 3H
License Status:
Spud Date:
Permit Date: 2013-02-08
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.791694
Longitude: -79.905178

For data sources see[1][2][3]

Well History

Date Event
2013-02-08 New Permit Application
2013-03-20 Performed Spud Operation
2013-05-30 Drilling Completion
2013-07-17 Perforation
2014-08-19 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-08-26 2013-09-13 5,974 4,982,860 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Friction Reducer, Unislick ST-50 CESI Chemical Friction Reducer Petroleum distillates, hydrotreated light 64742-47-8 30 0.0143205 6846.48
Other - (non-hazardous) NA 70 0.0334146 15975.1
Acid Inhibitor, Unihib G GeoSafe Acid Inhibitor Proprietary Blend Surfactants NA 35 0.000209653 100.233
Short Chained Glycol Ether 112-34-5 50 0.000299505 143.19
Ethoxylated alcohol NA 35 0.000209653 100.233
Sand (Proppant) Universal Proppant Silica Substrate NA 100 11.6596 5,574,300.0
Hydrochloric Acid (7.5%) PPG Industries Acidizing Other - (non-hazardous) NA 92.5 1.10521 528389
Hydrochloric Acid 7647-01-0 7.5 0.0896117 42842.3
Water XTO Carrier/Base Fluid Water 7732-18-5 100 86.9755 41,582,000.0
Biocide, EC6116A Nalco Biocide Polyethylene Glycol 25322-68-3 60 0.00971366 4643.99
Dibromoacetonitrile 3252-43-5 5 0.000809472 386.999
Other - (non-hazardous) NA 5 0.000809472 386.999
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00485683 2322
Hydrochloric Acid (15%) PPG Industries Acidizing Hydrochloric Acid 7647-01-0 15 0.0142856 6829.79
Other - (non-hazardous) NA 85 0.0809518 38702.1
Scale Inhibitor, ScaleHib A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00311748 1490.43
Other - (non-hazardous) NA 70 0.00727412 3477.68

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2014 XTO ENERGY INC 859,823.00 311 0.00 0 170.19 311
2015 XTO ENERGY INC 703,044.00 352 0.00 0 39.67 31
2016 XTO ENERGY INC 507,755.00 338 0.00 0 32.06 27
2017 XTO ENERGY INC 446,567.00 305 0.00 0 0.00 0
2018 XTO ENERGY INC 289,215.76 352 0.00 0 0.00 0
2019 XTO ENERGY INC 327,166.47 290 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 XTO ENERGY INC Drill Cuttings 622.15 Tons LANDFILL 100403
2014 XTO ENERGY INC Fracing Fluid Waste 2,438.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Produced Fluid 124.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2014 XTO ENERGY INC Fracing Fluid Waste 182.17 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2014 XTO ENERGY INC Produced Fluid 1,666.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2014 XTO ENERGY INC Produced Fluid 9,334.40 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Produced Fluid 210.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 XTO ENERGY INC Fracing Fluid Waste 344.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2014 XTO ENERGY INC Fracing Fluid Waste 182.17 Bbl CENT WASTE TRT FAC NPDES PA0254185
2015 XTO ENERGY INC Produced Fluid 969.40 Bbl INJECTION DISPOSAL WELL 34-133-24096
2015 XTO ENERGY INC Produced Fluid 476.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2015 XTO ENERGY INC Produced Fluid 3,592.10 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 120.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2016 XTO ENERGY INC Produced Fluid 1,331.60 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 895.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 180.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2017 XTO ENERGY INC Produced Fluid 120.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 XTO ENERGY INC Produced Fluid 120.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 325.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017 XTO ENERGY INC Produced Fluid 1,116.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 599.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 216.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 571.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 859.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Waste Water Treatment Sludge 1.16 Tons RESIDUAL WASTE PROCESSING FACILITY 101674

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2154760 Primary Facility 2013-04-02 Routine/Partial Inspection No Violations Noted
2184441 Primary Facility 2013-07-15 Routine/Partial Inspection No Violations Noted
2239205 Primary Facility 2014-01-15 Routine/Partial Inspection No Violations Noted
2668817 Primary Facility 2017-11-27 Routine/Partial Inspection No Violations Noted At the time of inspection, well was producing. Well integrity appeared to be in good condition, with no signs of any leaks or spills at the well. Well tender onsite gave me pressures of 647 psi on casing and 646 for tubing. There were 4 line heaters and 5 tanks within a lined, steel dike. Well was properly labeled. ER sign remains posted.

The line heater for this well was boiling over when arriving onsite. There was a good amount of smoke from the antifreeze. Well tenders arrived onsite and immediately began to fix the problem. Nothing was making it to the ground.

2699818 Primary Facility 2018-02-27 Routine/Partial Inspection No Violations Noted On 02/27/2018, WQS Brian MacQuarrie onsite. Site sign posted and maintained at site entrance. Four wells tagged and in production. Five 400 bbl and four gas processing units installed within containment structure. PCSM installed and maintained.
2736996 Primary Facility 2018-06-04 Routine/Partial Inspection No Violations Noted On 6/4/2018, WQS Brian MacQuarrie onsite. Site sign maintained and posted at entrance. Access road has erosion gullies beginning to form. Well site consists of 4 wells, the B1H-019-22010, B2H-019-22011, C2H-019-22021 and C3H-019-22022. Previously disturbed areas well vegetated. PCSM maintained.
2836924 Primary Facility 2019-02-06 Routine/Partial Inspection No Violations Noted On 2/6/2019, WQS Brian MacQuarrie onsite. Well site consists of 4 wells in production, B1H (019-22010), B2H (019-22011), C2H (019-22021) and C3H (019-22022) all properly tagged. The tank battery consists of five 400 bbl tanks ( one condensate and four production water). The PCSM infiltration basin is maintained.

For data sources see[8]

References