If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-22043 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.679428,"lon":-79.766089,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Buffalo Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 146272 | |
Farm/Lease Name: HARVEY UNIT 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2013-03-14 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.679428 | |
Longitude: -79.766089 |
Date | Event |
---|---|
2013-03-14 | New Permit Application |
2013-05-29 | Performed Spud Operation |
2013-07-02 | Drilling Completion |
2013-12-19 | Perforation |
2015-01-21 | DEVIATED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 388,651.00 | 163 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 839,749.00 | 347 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 626,207.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2018 | XTO ENERGY INC | 512,728.20 | 350 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 781,470.98 | 363 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | XTO ENERGY INC | Drill Cuttings | 1,419.41 Tons | LANDFILL | 100403 |
2015 | XTO ENERGY INC | Produced Fluid | 242.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2015 | XTO ENERGY INC | Produced Fluid | 3,089.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2015 | XTO ENERGY INC | Produced Fluid | 91.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2016 | XTO ENERGY INC | Soil Contaminated by Oil & Gas Related Spills | 0.14 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2016 | XTO ENERGY INC | Produced Fluid | 4,183.10 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 280.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2016 | XTO ENERGY INC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2016 | XTO ENERGY INC | Produced Fluid | 3,596.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 115.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2016 | XTO ENERGY INC | Soil Contaminated by Oil | 0.14 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2017 | XTO ENERGY INC | Produced Fluid | 391.31 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2017 | XTO ENERGY INC | Produced Fluid | 235.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 120.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 2,263.20 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 1,602.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 2,294.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 846.50 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 590.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2172531 | Primary Facility | 2013-05-30 | Routine/Partial Inspection | No Violations Noted | |
2178879 | Primary Facility | 2013-06-25 | Drilling/Alteration | No Violations Noted | |
2199022 | Primary Facility | 2013-08-27 | Routine/Partial Inspection | No Violations Noted | |
2204687 | Primary Facility | 2013-09-10 | Routine/Partial Inspection | No Violations Noted | |
2239187 | Primary Facility | 2014-01-15 | Routine/Partial Inspection | No Violations Noted | |
2255903 | Primary Facility | 2014-03-21 | Incident- Response to Accident or Event | Violation(s) Noted | |
2271498 | Primary Facility | 2014-05-14 | Routine/Partial Inspection | No Violations Noted | |
2332966 | Primary Facility | 2014-12-23 | Routine/Partial Inspection | No Violations Noted | |
2436335 | Primary Facility | 2015-12-16 | Routine/Partial Inspection | No Violations Noted | |
2636762 | Primary Facility | 2017-09-13 | Routine/Partial Inspection | No Violations Noted | On site for a routine partial inspection.
Well is drilled, completed, and in production. Production equipment installed on site. Well is connected to a gathering pipeline. Well is fenced and has a well tag. Act 13 signage in place at entrance. The ESCGP 2 permit has been approved for NOT. All on site temporary E/S controls have been removed, & PCSM BMPs and plan have been installed/implemented. |
2705775 | Primary Facility | 2018-03-15 | Routine/Complete Inspection | No Violations Noted | On 3/15/2018, WQS Brian MacQuarrie onsite. Site sign maintained at entrance. Two wells in production, the 1H (Permit No. 37-019-22043) and 3H (Permit No. 37-019-22044). Tank battery consists of two 400 bbl tanks and one 300 bbl tank installed within stainless steel containment structures. Site access road maintained. No apparent issues. |
2735827 | Primary Facility | 2018-05-31 | Routine/Complete Inspection | No Violations Noted | On 5/31/2018, WQS Brian MacQuarrie onsite. Site sign maintained at entrance. Two wells in production, the 1H (Permit No. 37-019-22043) and 3H (Permit No. 37-019-22044). Tank battery consists of two 400 bbl tanks and one 300 bbl tank installed within stainless steel containment structures. Site access road maintained. Vegetative growth well established in previously disturbed areas. No apparent issues. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2255903 | 691441 | 03/21/2014 | 2014-03-21 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
691441 | 309120 | NOV - Notice of Violation |
For data sources see[7]