If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-22047 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.898333,"lon":-79.779206,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Donegal Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 144567 | |
Farm/Lease Name: WELTER UNIT 2H | |
License Status: ACTIVE | |
Spud Date: | |
Permit Date: 2013-03-14 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.898333 | |
Longitude: -79.779206 |
Date | Event |
---|---|
2013-03-14 | New Permit Application |
2013-04-20 | Performed Spud Operation |
2013-05-23 | Drilling Completion |
2013-09-24 | Perforation |
2014-08-20 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-11-25 | 2013-12-30 | 5,970 | 5,790,420 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Acetic Acid (10%) | Chemical Solvents, Inc. | Acidizing | Other - (non-hazardous) | NA | 90 | 0.14927 | 81295.9 |
Acetic Acid | 64-19-7 | 10 | 0.0165856 | 9032.88 | ||||
Hydrochloric Acid (15%) | PPG Industries | Acidizing | Other - (non-hazardous) | NA | 85 | 0.689695 | 375623 | |
Hydrochloric Acid | 7647-01-0 | 15 | 0.121711 | 66286.4 | ||||
Biocide, EC6116A | Nalco | Biocide | Dibromoacetonitrile | 3252-43-5 | 5 | 0.000600453 | 327.02 | |
Other - (non-hazardous) | NA | 5 | 0.000600453 | 327.02 | ||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30 | 0.00360272 | 1962.12 | ||||
Polyethylene Glycol | 25322-68-3 | 60 | 0.00720544 | 3924.24 | ||||
Sand (Proppant) | Universal | Proppant | Silica Substrate | NA | 100 | 9.80479 | 5,339,900.0 | |
Water | XTO | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 88.724 | 48,321,000.0 | |
Hydrochloric Acid (7.5%) | PPG Industries | Acidizing | Other - (non-hazardous) | NA | 92.5 | 0.377532 | 205612 | |
Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0306107 | 16671.3 | ||||
Friction Reducer, Unislick ST-50 | CESI Chemical | Friction Reducer | Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.0172498 | 9394.62 | |
Other - (non-hazardous) | NA | 70 | 0.0402496 | 21920.8 | ||||
Acid Inhibitor, Unihib G | GeoSafe | Acid Inhibitor | Short Chained Glycol Ether | 112-34-5 | 50 | 0.000454774 | 247.68 | |
Ethoxylated alcohol | NA | 35 | 0.000318342 | 173.376 | ||||
Proprietary Blend Surfactants | NA | 35 | 0.000318342 | 173.376 | ||||
Clay Stabilizer, Cla-Chek G | Shrieve | Clay Stabilizer | Water | 7732-18-5 | 15 | 0.000747159 | 406.919 | |
Other - (non-hazardous) | NA | 85 | 0.0042339 | 2305.87 | ||||
Scale Inhibitor, ScaleHib A | Nalco | Scale Inhibitor | Other - (non-hazardous) | NA | 70 | 0.00726435 | 3956.32 | |
Ethylene Glycol | 107-21-1 | 30 | 0.00311329 | 1695.57 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | XTO ENERGY INC | 247,354.00 | 143 | 0.00 | 0 | 250.89 | 143 |
2015 | XTO ENERGY INC | 372,187.00 | 356 | 0.00 | 0 | 714.53 | 205 |
2016 | XTO ENERGY INC | 251,427.00 | 293 | 0.00 | 0 | 453.07 | 233 |
2017 | XTO ENERGY INC | 172,664.00 | 142 | 0.00 | 0 | 14.71 | 85 |
2018 | XTO ENERGY INC | 283,234.75 | 349 | 0.00 | 0 | 133.10 | 226 |
2019 | XTO ENERGY INC | 231,627.79 | 357 | 0.00 | 0 | 194.49 | 329 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2013 | XTO ENERGY INC | Drill Cuttings | 1,864.31 Tons | LANDFILL | 101397 |
2013 | XTO ENERGY INC | Drill Cuttings | 26.33 Tons | LANDFILL | 100403 |
2014 | XTO ENERGY INC | Fracing Fluid Waste | 600.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2014 | XTO ENERGY INC | Fracing Fluid Waste | 4,328.60 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 3,208.60 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2014 | XTO ENERGY INC | Produced Fluid | 862.90 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2014 | XTO ENERGY INC | Fracing Fluid Waste | 179.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2014 | XTO ENERGY INC | Produced Fluid | 869.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XTO ENERGY INC | Produced Fluid | 479.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2015 | XTO ENERGY INC | Produced Fluid | 300.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015 | XTO ENERGY INC | Produced Fluid | 373.80 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2015 | XTO ENERGY INC | Produced Fluid | 6,615.20 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 1,334.10 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 513.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 90.50 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 220.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XTO ENERGY INC | Produced Fluid | 173.91 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 619.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 30.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2018 | XTO ENERGY INC | Produced Fluid | 90.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | XTO ENERGY INC | Produced Fluid | 105.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | XTO ENERGY INC | Produced Fluid | 2,150.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 1,243.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 341.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 210.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 93.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2166721 | Primary Facility | 2013-05-14 | Drilling/Alteration | No Violations Noted | |
2172486 | Primary Facility | 2013-05-23 | Routine/Partial Inspection | No Violations Noted | |
2181875 | Primary Facility | 2013-07-03 | Routine/Partial Inspection | No Violations Noted | |
2189578 | Primary Facility | 2013-07-31 | Routine/Complete Inspection | No Violations Noted | |
2194787 | Primary Facility | 2013-08-06 | Routine/Partial Inspection | No Violations Noted | |
2271493 | Primary Facility | 2014-05-13 | Routine/Partial Inspection | No Violations Noted | |
2280650 | Primary Facility | 2014-06-23 | Routine/Partial Inspection | No Violations Noted | |
2605698 | Primary Facility | 2017-06-20 | Routine/Partial Inspection | No Violations Noted | On site for a routine partial inspection.
Well drilled, completed, and in production. Production equipment on site. Gathering pipeline connected to well pad. There is a well development impoundment on site. Well site PCSM plan has been implemented and site has 100% vegetation. Well tag in place, and well head has been fenced. |
2719087 | Primary Facility | 2018-04-17 | Routine/Partial Inspection | No Violations Noted | On 4/17/2018, WQS Brian MacQuarrie onsite for routine inspection. Site sign maintained at entrance to site. Access road maintained. Well pad has 3 wells in production. Production equipment consists of 4 four hundred bbl tanks and 3 GPUs installed within secondary containment. Well development impoundment adjacent to well pad fenced in and maintained. No apparent issues. |
For data sources see[8]