X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22063

Well Details

Well ID: 37-019-22063
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Donegal Township
Operator Name: XTO ENERGY INC
Well Pad ID: 144567
Farm/Lease Name: WELTER UNIT 5H
License Status: ACTIVE
Spud Date:
Permit Date: 2013-04-29
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.898414
Longitude: -79.779197

For data sources see[1][2][3]

Well History

Date Event
2013-04-29 New Permit Application
2013-06-12 Performed Spud Operation
2013-06-28 Drilling Completion
2013-09-25 Perforation
2014-08-20 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-11-25 2013-12-26 6,022 5,535,430 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Scale Inhibitor, ScaleHib A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00326716 1705.18
Other - (non-hazardous) NA 70 0.00762337 3978.76
Water XTO Carrier/Base Fluid Water 7732-18-5 100 88.5068 46,193,100.0
Biocide, EC6116A Nalco Biocide Polyethylene Glycol 25322-68-3 60 0.00765081 3993.08
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00382541 1996.54
Other - (non-hazardous) NA 5 0.000637568 332.757
Dibromoacetonitrile 3252-43-5 5 0.000637568 332.757
Hydrochloric Acid (15%) PPG Industries Acidizing Hydrochloric Acid 7647-01-0 15 0.116689 60901.6
Other - (non-hazardous) NA 85 0.661235 345109
Friction Reducer, Unislick ST-50 CESI Chemical Friction Reducer Other - (non-hazardous) NA 70 0.0387374 20217.7
Petroleum distillates, hydrotreated light 64742-47-8 30 0.0166017 8664.71
Clay Stabilizer, Cla-Chek G Shrieve Clay Stabilizer Water 7732-18-5 15 0.000113971 59.483
Other - (non-hazardous) NA 85 0.000645834 337.071
Hydrochloric Acid (7.5%) PPG Industries Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0354628 18508.6
Other - (non-hazardous) NA 92.5 0.437375 228273
Sand (Proppant) Universal Proppant Silica Substrate NA 100 10.1618 5,303,600.0
Acid Inhibitor, Unihib G GeoSafe Acid Inhibitor Short Chained Glycol Ether 112-34-5 50 0.000437484 228.33
Ethoxylated alcohol NA 35 0.000306239 159.831
Proprietary Blend Surfactants NA 35 0.000306239 159.831

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2014 XTO ENERGY INC 205,121.00 143 0.00 0 69.55 143
2015 XTO ENERGY INC 267,516.00 356 0.00 0 394.18 205
2016 XTO ENERGY INC 153,892.00 324 0.00 0 295.73 295
2017 XTO ENERGY INC 172,839.00 240 0.00 0 216.15 240
2018 XTO ENERGY INC 226,454.32 355 11.66 30 231.25 325
2019 XTO ENERGY INC 159,977.84 333 0.00 0 328.60 333

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 XTO ENERGY INC Drill Cuttings 1,864.31 Tons LANDFILL 101397
2013 XTO ENERGY INC Drill Cuttings 26.33 Tons LANDFILL 100403
2014 XTO ENERGY INC Fracing Fluid Waste 304.20 Bbl INJECTION DISPOSAL WELL 34-133-21076
2014 XTO ENERGY INC Fracing Fluid Waste 6,964.20 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Produced Fluid 1,096.50 Bbl INJECTION DISPOSAL WELL 34-133-24096
2014 XTO ENERGY INC Produced Fluid 3,104.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Fracing Fluid Waste 490.40 Bbl INJECTION DISPOSAL WELL 34-133-24096
2014 XTO ENERGY INC Produced Fluid 631.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid 676.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2015 XTO ENERGY INC Produced Fluid 119.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2015 XTO ENERGY INC Produced Fluid 418.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid 5,609.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 XTO ENERGY INC Produced Fluid 92.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2016 XTO ENERGY INC Produced Fluid 93.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2016 XTO ENERGY INC Produced Fluid 1,258.90 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 1,003.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 175.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017 XTO ENERGY INC Produced Fluid 1,766.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 2,419.65 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 965.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 376.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 230.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 93.00 Bbl INJECTION DISPOSAL WELL 34-133-21076

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2174413 Primary Facility 2013-06-12 Drilling/Alteration No Violations Noted
2178891 Primary Facility 2013-06-26 Drilling/Alteration No Violations Noted
2181869 Primary Facility 2013-07-03 Routine/Partial Inspection No Violations Noted
2189577 Primary Facility 2013-07-31 Routine/Complete Inspection No Violations Noted
2194789 Primary Facility 2013-08-06 Routine/Partial Inspection No Violations Noted
2271492 Primary Facility 2014-05-13 Routine/Partial Inspection No Violations Noted
2605702 Primary Facility 2017-06-20 Routine/Partial Inspection No Violations Noted On site for a routine partial inspection.

Well drilled, completed, and in production.

Production equipment on site.

Gathering pipeline connected to well pad.

There is a well development impoundment on site.

Well site PCSM plan has been implemented and site has 100% vegetation.

Well tag in place, and well head has been fenced.

2719120 Primary Facility 2018-04-17 Routine/Partial Inspection No Violations Noted On 4/17/2018, WQS Brian MacQuarrie onsite for routine inspection. Site sign maintained at entrance to site. Access road maintained. Well pad has 3 wells in production. Production equipment consists of 4 four hundred bbl tanks and 3 GPUs installed within secondary containment. Well development impoundment adjacent to well pad fenced in and maintained. No apparent issues.

For data sources see[8]

References