X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22120

Well Details

Well ID: 37-019-22120
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Butler Township
Operator Name: XTO ENERGY INC
Well Pad ID: 145480
Farm/Lease Name: HINCH SMITH UNIT 7H
License Status:
Spud Date:
Permit Date: 2013-08-15
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.829936
Longitude: -79.888422

For data sources see[1][2][3]

Well History

Date Event
2013-08-15 New Permit Application
2013-10-02 New Permit Application
2013-10-24 Performed Spud Operation
2014-03-04 Drilling Completion
2014-06-05 Perforation
2015-02-17 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-06-27 2014-08-23 5,891 5,213,470 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Other Ingredients Nabors Completion and Production Services Other Ingredients Water 7732-18-5 90 0.007394 0
Dioxane 123-91-1 1 0.00001300 0
Petroleum distillate hydrotreated light 64742-47-8 35 0.018149 0
2-Butoxyethanol 111-76-2 13 0.000163 0
Water 7732-18-5 80 0.013371 0
Alcohol Ethoxylates Component 69227-21-0 5 0.002593 0
Alcohol Ethoxylates component 68585-36-4 5 0.002593 0
Ethylene Glycol 107-21-1 4 0.002074 0
38193-60-1 35 0.018149 0
Sorbitan Monooleate 1338-43-8 5 0.002593 0
Water 7732-18-5 48 0.000601 0
Water 7732-18-5 40 0.020742 0
Super TSC 2 LT Nabors Completion and Production Services Paraffin & Scale Additives Bis(hexamethylene)triamine Penta
(methylene phosphonic acid), Sodium Salt
35657-77-3 15 0.001232 0
HCl Acid (12.5-18.0%), 22 Baume Nabors Completion and Production Services Bulk Acid 7647-01-0 100 0.004839 0
Water 7732-18-5 100 0.005914 0
7647-01-0 100 0.024369 0
Water 7732-18-5 100 0.111015 0
KR-153SL Nabors Completion and Production Services Biocides 2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0.003343 0
Polyethlyene-Glycol 25322-68-3 50 0.008357 0
HCl Acid (0-7.5%), 22 Baume Nabors Completion and Production Services Bulk Acid Water 7732-18-5 100 0.111015 0
7647-01-0 100 0.024369 0
7647-01-0 100 0.004839 0
Water 7732-18-5 100 0.005914 0
PA Specific 40/70 mesh Sand Nabors Completion and Production Services Sand - Bulk - Pennsylvania Aluminum Oxide 1344-28-1 1.1 0.037961 0
Iron Oxide 1309-37-1 0.1 0.003451 0
Titanium Oxide 13463-67-7 0.1 0.003451 0
Crystalline Silica, quartz 14808-60-7 99.9 3.44756 0
Water XTO Energy/ExxonMobil Water Water 7732-18-5 100 89.0564 0
Acid Inhibitor 2 (AI-2) Nabors Completion and Production Services Acid Corrosion Inhibitors Ethoxylated Nonylphenol 68412-54-4 13 0.000163 0
Glycol Ethers 111-46-6 40 0.000501 0
Isopropyl Alcohol 67-63-0 40 0.000501 0
Propargyl Alcohol 107-19-7 40 0.000501 0
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 10 0.000125 0
PA Specific 30/50 mesh Sand Nabors Completion and Production Services Sand - Bulk - Pennsylvania Iron Oxide 1309-37-1 0.1 0.007268 0
Crystalline Silica, quartz 14808-60-7 99.9 7.26118 0
Titanium Oxide 13463-67-7 0.1 0.007268 0
Aluminum Oxide 1344-28-1 1.1 0.079953 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2014 XTO ENERGY INC 22,931.00 12 0.00 0 0.00 0
2015 XTO ENERGY INC 259,984.00 345 0.00 0 0.00 0
2016 XTO ENERGY INC 147,950.00 319 0.00 0 47.08 198
2017 XTO ENERGY INC 67,529.00 150 0.00 0 9.17 120
2018 XTO ENERGY INC 82,657.80 163 0.00 0 33.34 80
2019 XTO ENERGY INC 101,568.79 314 0.00 0 17.50 171

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 XTO ENERGY INC Drill Cuttings 689.00 Tons LANDFILL 100403
2014 XTO ENERGY INC Fracing Fluid Waste 1,847.33 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Fracing Fluid Waste 2,015.80 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 XTO ENERGY INC Drill Cuttings 252.49 Tons LANDFILL 100403
2014 XTO ENERGY INC Fracing Fluid Waste 669.80 Bbl INJECTION DISPOSAL WELL 34-133-24096
2015 XTO ENERGY INC Produced Fluid 766.20 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid 788.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2015 XTO ENERGY INC Produced Fluid 8,150.90 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 XTO ENERGY INC Produced Fluid 87.60 Bbl INJECTION DISPOSAL WELL 34-133-20114
2015 XTO ENERGY INC Produced Fluid 1,333.20 Bbl INJECTION DISPOSAL WELL 34-133-24096
2016 XTO ENERGY INC Produced Fluid 1,877.20 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Soil Contaminated by Oil & Gas Related Spills 0.03 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2016 XTO ENERGY INC Soil Contaminated by Oil 0.03 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2016 XTO ENERGY INC Produced Fluid 119.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2016 XTO ENERGY INC Produced Fluid 98.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2016 XTO ENERGY INC Produced Fluid 1,459.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 55.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2017 XTO ENERGY INC Produced Fluid 90.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 1,020.19 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Other Oil & Gas Wastes 5.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 993.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 844.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 93.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 886.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 93.00 Bbl INJECTION DISPOSAL WELL 34-133-21076

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2218581 Primary Facility 2013-10-28 Drilling/Alteration No Violations Noted
2236852 Primary Facility 2014-01-14 Routine/Partial Inspection No Violations Noted
2251850 Primary Facility 2014-03-05 Drilling/Alteration No Violations Noted
2316189 Primary Facility 2014-10-27 Routine/Partial Inspection No Violations Noted
2543514 Primary Facility 2016-12-07 Routine/Partial Inspection No Violations Noted
2651172 Primary Facility 2017-10-24 Routine/Partial Inspection No Violations Noted On site for a routine partial inspection.

Well has been drilled, completed, and in production. Well head is fenced, is protected with jersey barriers, and has a well tag. Production equipment (tank battery & GPU) on secondary containment. Combustor on site. Gathering pipeline header on site off the well pad. Site ID sign on site.

PCSM plan implemented & PCSM BMPs installed. Site has 100% vegetation.

2699784 Primary Facility 2018-02-27 Routine/Partial Inspection No Violations Noted On 02/27/2018, WQS Brian MacQuarrie onsite. Site sign maintained at entrance. Ten wells installed and tagged. Nine in production. The 1H Permit No. 37-019-21878 currently in inactive status. Tank battery consists of eleven 400 bbl tanks installed within secondary steel containment structure. Freshwater impoundment installed and fenced in adjacent to well pad. No apparent issues.
2715721 Primary Facility 2018-04-04 Routine/Partial Inspection No Violations Noted At the time of inspection, well was producing. The tubing gauge was reading approx. 1900 psi. Well was properly labeled and the Emergency Response sign is posted at the lease entrance. There was a very large lined, steel dike that had 7 tanks on one side and 4 on the other. All except 1 are for produced water. Each tank is labeled for which well it is associated with. The separators are also labeled. There are 10 of these with line heaters and are between the tanks. There was also a lined impoundment along the lease road. It still had plenty of freeboard, even after the heavy rains.
2842812 Primary Facility 2019-02-21 Routine/Partial Inspection No Violations Noted On 2/21/2019, WQS Brian MacQuarrie onsite. While onsite meet Bill Rice (XTO-well tender). Ten wells in production; 1H (019-21878), 2H (019-21952), 3H (019-21953), 4H (019-21923), 5H (019-22159), 6H (019-22119), 7H (019-22120), 8H (019-22084), 9H (019-22085) and 10HB (019-22205). Tank battery consists of eleven 400 bbl tanks installed within containment structure ( ten tanks containing production water and one tank containing condensate). Ten gas processing units installed within containment structure. Freshwater impoundment fenced in and locked. Well sign and access road maintained. Previously disturbed areas vegetated and restored. Erosion and Sedimentation BMPs maintained.

For data sources see[8]

References