X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22159

Well Details

Well ID: 37-019-22159
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Butler Township
Operator Name: XTO ENERGY INC
Well Pad ID: 145480
Farm/Lease Name: HINCH SMITH UNIT 5H
License Status:
Spud Date:
Permit Date: 2013-10-02
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.829958
Longitude: -79.888486

For data sources see[1][2][3]

Well History

Date Event
2013-10-02 New Permit Application
2013-10-23 Performed Spud Operation
2014-02-15 Drilling Completion
2014-06-04 Perforation
2015-02-17 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-06-30 2014-08-22 5,886 4,749,290 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 KR-153SL Nabors Completion and Production Services Biocides Polyethlyene-Glycol 25322-68-3 50 0.008499 0
2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0.003399 0
PA Specific 40/70 mesh Sand Nabors Completion and Production Services Sand - Bulk - Pennsylvania Aluminum Oxide 1344-28-1 1.1 0.036675 0
Titanium Oxide 13463-67-7 0.1 0.003334 0
Crystalline Silica, quartz 14808-60-7 99.9 3.33079 0
Iron Oxide 1309-37-1 0.1 0.003334 0
Water XTO Energy/ExxonMobil Water Water 7732-18-5 100 89.3938 0
HCl Acid (12.5-18.0%), 22 Baume Nabors Completion and Production Services Bulk Acid 7647-01-0 100 0.023496 0
Water 7732-18-5 100 0.006517 0
Water 7732-18-5 100 0.107036 0
7647-01-0 100 0.005332 0
PA Specific 30/50 mesh Sand Nabors Completion and Production Services Sand - Bulk - Pennsylvania Titanium Oxide 13463-67-7 0.1 0.007039 0
Aluminum Oxide 1344-28-1 1.1 0.07743 0
Iron Oxide 1309-37-1 0.1 0.007039 0
Crystalline Silica, quartz 14808-60-7 99.9 7.03201 0
HCl Acid (0-7.5%), 22 Baume Nabors Completion and Production Services Bulk Acid Water 7732-18-5 100 0.006517 0
Water 7732-18-5 100 0.107036 0
7647-01-0 100 0.023496 0
7647-01-0 100 0.005332 0
Super TSC 2 LT Nabors Completion and Production Services Paraffin & Scale Additives Bis(hexamethylene triaminepenta
(methylenephosph onic acid))
Proprietary 10 0.000849 0
Other Ingredients Nabors Completion and Production Services Other Ingredients Alcohol Ethoxylates Component 69227-21-0 5 0.003195 0
Water 7732-18-5 90 0.007643 0
Water 7732-18-5 48 0.00059 0
Ethylene Glycol 107-21-1 4 0.002556 0
Dioxane 123-91-1 1 0.00001200 0
2-Butoxyethanol 111-76-2 13 0.00016 0
Petroleum distillate hydrotreated light 64742-47-8 35 0.022368 0
Water 7732-18-5 40 0.025563 0
Sodium Hydroxide 1310-73-2 1 0.00008500 0
Water 7732-18-5 80 0.013598 0
Alcohol Ethoxylates component 68585-36-4 5 0.003195 0
38193-60-1 35 0.022368 0
Sorbitan Monooleate 1338-43-8 5 0.003195 0
Acid Inhibitor 2 (AI-2) Nabors Completion and Production Services Acid Corrosion Inhibitors Ethoxylated Nonylphenol 68412-54-4 13 0.00016 0
Glycol Ethers 111-46-6 40 0.000492 0
Isopropyl Alcohol 67-63-0 40 0.000492 0
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 10 0.000123 0
Propargyl Alcohol 107-19-7 40 0.000492 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2014 XTO ENERGY INC 24,442.00 14 0.00 0 0.00 0
2015 XTO ENERGY INC 287,167.00 340 0.00 0 151.64 111
2016 XTO ENERGY INC 190,963.00 313 0.00 0 144.52 234
2017 XTO ENERGY INC 99,024.00 186 0.00 0 68.57 184
2018 XTO ENERGY INC 83,551.79 222 0.00 0 185.82 222
2019 XTO ENERGY INC 131,508.39 309 0.00 0 173.75 309

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 XTO ENERGY INC Drill Cuttings 689.00 Tons LANDFILL 100403
2014 XTO ENERGY INC Fracing Fluid Waste 1,764.53 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Fracing Fluid Waste 1,916.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 XTO ENERGY INC Drill Cuttings 273.85 Tons LANDFILL 100403
2014 XTO ENERGY INC Fracing Fluid Waste 240.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2015 XTO ENERGY INC Produced Fluid 342.60 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid 448.60 Bbl INJECTION DISPOSAL WELL 34-133-21076
2015 XTO ENERGY INC Produced Fluid 5,511.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 XTO ENERGY INC Produced Fluid 240.00 Bbl INJECTION DISPOSAL WELL 34-133-20114
2015 XTO ENERGY INC Produced Fluid 925.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2016 XTO ENERGY INC Produced Fluid 1,220.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Soil Contaminated by Oil & Gas Related Spills 0.03 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2016 XTO ENERGY INC Soil Contaminated by Oil 0.03 Tons RESIDUAL WASTE PROCESSING FACILITY 101674
2016 XTO ENERGY INC Produced Fluid 210.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2016 XTO ENERGY INC Produced Fluid 10.10 Bbl INJECTION DISPOSAL WELL 34-133-21076
2016 XTO ENERGY INC Produced Fluid 1,049.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 150.51 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 654.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Other Oil & Gas Wastes 5.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 46.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 XTO ENERGY INC Produced Fluid 105.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 93.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 107.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 105.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 306.00 Bbl INJECTION DISPOSAL WELL 34-133-21076

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2215296 Primary Facility 2013-10-23 Drilling/Alteration No Violations Noted
2220409 Primary Facility 2013-11-06 Drilling/Alteration No Violations Noted
2222781 Primary Facility 2013-11-14 Drilling/Alteration No Violations Noted
2236850 Primary Facility 2014-01-14 Routine/Partial Inspection No Violations Noted
2247403 Primary Facility 2014-02-11 Drilling/Alteration No Violations Noted
2316187 Primary Facility 2014-10-27 Routine/Partial Inspection No Violations Noted
2543518 Primary Facility 2016-12-07 Routine/Partial Inspection No Violations Noted
2651175 Primary Facility 2017-10-24 Routine/Partial Inspection No Violations Noted On site for a routine partial inspection.

Well has been drilled, completed, and in production. Well head is fenced, is protected with jersey barriers, and has a well tag. Production equipment (tank battery & GPU) on secondary containment. Combustor on site. Gathering pipeline header on site off the well pad. Site ID sign on site.

PCSM plan implemented & PCSM BMPs installed. Site has 100% vegetation.

2699787 Primary Facility 2018-02-27 Routine/Partial Inspection No Violations Noted On 02/27/2018, WQS Brian MacQuarrie onsite. Site sign maintained at entrance. Ten wells installed and tagged. Nine in production. The 1H Permit No. 37-019-21878 currently in inactive status. Tank battery consists of eleven 400 bbl tanks installed within secondary steel containment structure. Freshwater impoundment installed and fenced in adjacent to well pad. No apparent issues.
2715719 Primary Facility 2018-04-04 Routine/Partial Inspection No Violations Noted At the time of inspection, well was producing. The tubing gauge had a reading of approx. 1700 psi. Well was properly labeled and the Emergency Response sign is posted at the lease entrance. There was a very large lined, steel dike that had 7 tanks on one side and 4 on the other. All except 1 are for produced water. Each tank is labeled for which well it is associated with. The separators are also labeled. There are 10 of these with line heaters and are between the tanks. There was also a lined impoundment along the lease road. It still had plenty of freeboard, even after the heavy rains.
2842814 Primary Facility 2019-02-21 Routine/Partial Inspection No Violations Noted On 2/21/2019, WQS Brian MacQuarrie onsite. While onsite meet Bill Rice (XTO-well tender). Ten wells in production; 1H (019-21878), 2H (019-21952), 3H (019-21953), 4H (019-21923), 5H (019-22159), 6H (019-22119), 7H (019-22120), 8H (019-22084), 9H (019-22085) and 10HB (019-22205). Tank battery consists of eleven 400 bbl tanks installed within containment structure ( ten tanks containing production water and one tank containing condensate). Ten gas processing units installed within containment structure. Freshwater impoundment fenced in and locked. Well sign and access road maintained. Previously disturbed areas vegetated and restored. Erosion and Sedimentation BMPs maintained.

For data sources see[8]

References