X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22173

Well Details

Well ID: 37-019-22173
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Clearfield Township
Operator Name: XTO ENERGY INC
Well Pad ID: 145088
Farm/Lease Name: CYPHER A UNIT 5H
License Status:
Spud Date:
Permit Date: 2013-12-16
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.8827
Longitude: -79.749681

For data sources see[1][2][3]

Well History

Date Event
2013-12-16 New Permit Application
2013-12-26 Performed Spud Operation
2014-02-04 Drilling Completion
2014-08-21 Perforation
2015-07-14 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-10-15 2014-12-04 6,004 7,281,640 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid (15%) Axiall Acidizing Hydrochloric Acid 7647-01-0 15 0.00524474 3584.13
Hydrochloric Acid 7647-01-0 15 0.00217706 1487.75
Hydrochloric Acid 7647-01-0 15 0.00247393 1690.63
Other - (non-hazardous) NA 85 0.0560758 38320.9
Hydrochloric Acid (7.5%) Axiall Acidizing Other - (non-hazardous) NA 92.5 1.03584 707872
Hydrochloric Acid 7647-01-0 7.5 0.0209968 14348.8
Hydrochloric Acid 7647-01-0 7.5 0.0445133 30419.4
Hydrochloric Acid 7647-01-0 7.5 0.0184772 12626.9
Sand (Proppant) Universal Proppant Silica Substrate NA 100 9.80411 6,699,900.0
Friction Reducer, Unislick ST-50 CESI Chemical Friction Reducer Petroleum distillates, hydrotreated light 64742-47-8 30 0.01779 12157.3
Other - (non-hazardous) NA 70 0.04151 28367
Acid Inhibitor, Unihib G GeoSafe Acid Inhibitor Short chained glycol ether 112-34-5 60 0.000323473 221.054
Methanol 67-56-1 5 0.00002696 18.421
Formaldehyde 50-00-0 1 0.00000539 3.684
Ethoxylated alcohol 68002-97-1 35 0.000188693 128.948
Acetophenone 98-86-2 1 0.00000539 3.684
Thiourea 62-56-6 1 0.00000539 3.684
Biocide, EC6116A Nalco Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00619119 4230.92
Dibromoacetonitrile 3252-43-5 5 0.00103186 705.153
Other - (non-hazardous) NA 5 0.00103186 705.153
Polyethylene Glycol 25322-68-3 60 0.0123824 8461.83
Water XTO Carrier/Base Fluid Water 7732-18-5 100 88.9191 60,765,300.0
Scale Inhibitor, ScaleHib A Nalco Scale Inhibitor Other - (non-hazardous) NA 70 0.00733248 5010.85
Ethylene Glycol 107-21-1 30 0.00314249 2147.51

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2014 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2015 XTO ENERGY INC 369,595.00 237 0.00 0 0.00 0
2016 XTO ENERGY INC 271,799.00 327 0.00 0 54.93 120
2017 XTO ENERGY INC 224,242.00 187 0.00 0 5.00 28
2018 XTO ENERGY INC 82,776.99 95 0.00 0 6.67 4
2019 XTO ENERGY INC 265,169.61 298 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 XTO ENERGY INC Drill Cuttings 276.00 Tons LANDFILL 100403
2013 XTO ENERGY INC Drill Cuttings 238.00 Tons LANDFILL 101397
2014 XTO ENERGY INC Fracing Fluid Waste 811.80 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014 XTO ENERGY INC Fracing Fluid Waste 197.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2014 XTO ENERGY INC Drill Cuttings 1,339.11 Tons LANDFILL 100403
2015 XTO ENERGY INC Produced Fluid 4,217.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2015 XTO ENERGY INC Produced Fluid 1,619.30 Bbl INJECTION DISPOSAL WELL 34-133-21076
2015 XTO ENERGY INC Produced Fluid 16,923.10 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 XTO ENERGY INC Produced Fluid 852.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Fracing Fluid Waste 90.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 2,521.20 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 100.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2016 XTO ENERGY INC Produced Fluid 358.50 Bbl INJECTION DISPOSAL WELL 34-133-21076
2016 XTO ENERGY INC Fracturing Fluid Waste 0.71 Tons RESIDUAL WASTE TRANSFER FACILITY 101674
2016 XTO ENERGY INC Produced Fluid 645.30 Bbl INJECTION DISPOSAL WELL 34-133-24096
2016 XTO ENERGY INC Produced Fluid 2,128.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 1,050.44 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 390.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017 XTO ENERGY INC Other Oil & Gas Wastes 3.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Produced Fluid 546.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2017 XTO ENERGY INC Produced Fluid 1,295.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 1,495.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 755.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 579.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 2,844.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 528.00 Bbl INJECTION DISPOSAL WELL 34-133-21076

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2233991 Primary Facility 2013-12-31 Routine/Partial Inspection No Violations Noted
2241677 Primary Facility 2014-01-30 Drilling/Alteration No Violations Noted
2323916 Primary Facility 2014-11-25 Routine/Partial Inspection No Violations Noted
2532637 Primary Facility 2016-10-19 Routine/Partial Inspection No Violations Noted
2595773 Primary Facility 2017-05-19 Routine/Partial Inspection No Violations Noted On site for a partial inspection of the Cypher A Unit 5H Well.

Well is drilled & completed, and in production.

Well is attached to production equipment (production tank, GPU, & combustor). Well feeds to a gathering pipeline on site. Well tag in place. Well is fenced & protected with jersey barriers.

Well pad has been restored per the PCSM plans. All temporary E/S controls removed.

2791118 Primary Facility 2018-10-18 Routine/Partial Inspection No Violations Noted On site for a routine partial inspection.

Well is drilled, completed, and in production. Well tag in place. Well protected.

Site has 10 drilled and completed wells. Wells are fenced. Site has 12 production tanks on containment. Site has 10 GPUs on containment. There is 1 combustor on site. There is a pipeline header on the well pad.

2815891 Primary Facility 2018-12-14 Routine/Partial Inspection No Violations Noted On 12/14/2018, WQSS Scott Lux and WQS Brian MacQuarrie onsite. Well site consists of 10 wells in production permit nos. A1H (019-22019), B1H (019-22020), A2H (019-22053), A3H (019-22054), B2H (019-22166), A4H (019-22167), A5H (019-22173), B5H (019-22174), B4H (019-22175) and B3H (019-22176). Production equipment consists of twelve 400 bbl tanks within stainless steel containment structure, 10 GPUs and one TVO. Site well vegetated and maintained. Earth disturbance permit ESX12-019-0161 terminated on 5/19/2017.

For data sources see[8]

References