If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-22213 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.768797,"lon":-79.852897,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Jefferson Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 150936 | |
Farm/Lease Name: VADNAL A UNIT 3H | |
License Status: | |
Spud Date: | |
Permit Date: 2014-02-24 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.768797 | |
Longitude: -79.852897 |
Date | Event |
---|---|
2014-02-24 | New Permit Application |
2014-04-16 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 794,547.37 | 348 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | XTO ENERGY INC | Drill Cuttings | 1,089.47 Tons | LANDFILL | 100403 |
2018 | XTO ENERGY INC | Synthetic Liner Materials | 2.23 Tons | LANDFILL | 100434 |
2018 | XTO ENERGY INC | Other Oil & Gas Wastes | 45.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 1,255.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Waste Water Treatment Sludge | 38.59 Tons | RESIDUAL WASTE PROCESSING FACILITY | 101674 |
2019 | XTO ENERGY INC | Produced Fluid | 13,624.90 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 1,693.90 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Produced Fluid | 19,452.07 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Synthetic Liner Materials | 18.38 Tons | LANDFILL | 100434 |
2019 | XTO ENERGY INC | Produced Fluid | 5,708.80 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2271482 | Primary Facility | 2014-05-13 | Drilling/Alteration | No Violations Noted | |
2299903 | Primary Facility | 2014-08-26 | Routine/Partial Inspection | No Violations Noted | |
2338777 | Primary Facility | 2015-01-16 | Routine/Partial Inspection | No Violations Noted | |
2345009 | Primary Facility | 2015-02-13 | Routine/Partial Inspection | No Violations Noted | |
2551263 | Primary Facility | 2017-01-06 | Routine/Partial Inspection | No Violations Noted | |
2687356 | Primary Facility | 2018-01-18 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, well was shut in. Well does not have a Christmas tree yet, only wellhead. There were no leaks or corrosion associated with the well. The well was properly labeled and ER sign remains posted. There were 5 tanks and 4 line heaters within a lined, steel dike. A gas buster was also on site.
A homeowner in the area recently called in. I did not detect any gas during my inspection. |
2693268 | Primary Facility | 2018-02-12 | Routine/Partial Inspection | No Violations Noted | On 2/12/2018, WQS Brian MacQuarrie onsite. Site sign maintained at entrance. Access road maintained. Two post construction infiltration basins maintained. Four wells drilled ( two in production). Five 400 bbl tanks installed within secondary stainless steel containment structure. No apparent issues. |
2809332 | Primary Facility | 2018-11-30 | Routine/Partial Inspection | No Violations Noted | On 11/30/2018, WQS Brian MacQuarrie onsite. Well stimulation activities completed at wells A3H (37-019-22213) and B5H (37-019-22215). Wells 10HB (37-019-22214) and 7H (37-019-22216) shut in. No activity onsite today. Waiting on coil tubing. Twenty-two frac tanks staged onsite. Tank battery consists of five 400bbl tanks in containment. Infiltration basin maintained. Snow on ground during inspection. |
For data sources see[7]