X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-019-22217

Well Details

Well ID: 37-019-22217
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Clearfield Township
Operator Name: XTO ENERGY INC
Well Pad ID: 150937
Farm/Lease Name: BERGBIGLER A UNIT 1H
License Status:
Spud Date:
Permit Date: 2014-03-27
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.874158
Longitude: -79.7611

For data sources see[1][2][3]

Well History

Date Event
2014-03-27 New Permit Application
2014-10-04 Performed Spud Operation
2015-02-02 Drilling Completion
2015-07-13 Perforation
2015-11-20 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-07-15 2015-08-17 5,990 9,986,500 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Scale Inhibitor, ScaleHib A Nalco Scale Inhibitor Other - (non-hazardous) NA 70 0.00743713 6925.44
Ethylene Glycol 107-21-1 30 0.00318734 2968.04
Hydrochloric Acid (7.5%) Axiall Acidizing Hydrochloric Acid 7647-01-0 7.5 0.023803 22165.3
Hydrochloric Acid 7647-01-0 7.5 0.0112278 10455.3
Other - (non-hazardous) NA 92.5 0.553907 515797
Hydrochloric Acid 7647-01-0 7.5 0.0098805 9200.7
Hydrochloric Acid (15%) Axiall Acidizing Hydrochloric Acid 7647-01-0 15 0.00384129 3577
Hydrochloric Acid 7647-01-0 15 0.0015945 1484.79
Hydrochloric Acid 7647-01-0 15 0.00181193 1687.27
Other - (non-hazardous) NA 85 0.0410704 38244.7
Friction Reducer, Unislick ST-50 CESI Chemical Friction Reducer Petroleum distillates, hydrotreated light 64742-47-8 30 0.0166573 15511.2
Other - (non-hazardous) NA 70 0.0388669 36192.8
Water XTO Carrier/Base Fluid Water 7732-18-5 100 89.4947 83,337,300.0
Sand (Proppant) Universal Proppant Silica Substrate NA 100 9.78084 9,107,900.0
Acid Inhibitor, Unihib G GeoSafe Acid Inhibitor Methanol 67-56-1 5 0.00001496 13.932
Short chained glycol ether 112-34-5 60 0.000179536 167.184
Ethoxylated alcohol 68002-97-1 35 0.00010473 97.524
Formaldehyde 50-00-0 1 0.00000299 2.786
Polyethylene Glycol 25322-68-3 50 0.00541615 5043.51
Thiourea 62-56-6 1 0.00000299 2.786
Acetophenone 98-86-2 1 0.00000299 2.786
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 20 0.00216646 2017.4
Other - (non-hazardous) NA 30 0.00324969 3026.11

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2015 XTO ENERGY INC 38,442.00 31 0.00 0 0.00 0
2016 XTO ENERGY INC 557,937.00 328 0.00 0 30.83 141
2017 XTO ENERGY INC 146,665.00 145 0.00 0 12.54 40
2018 XTO ENERGY INC 326,574.15 355 0.00 0 2.50 59
2019 XTO ENERGY INC 214,791.33 310 0.00 0 2.50 92

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 XTO ENERGY INC Drill Cuttings 637.22 Tons LANDFILL 100585
2015 XTO ENERGY INC Produced Fluid 1,793.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2015 XTO ENERGY INC Drill Cuttings 765.13 Tons LANDFILL 100585
2015 XTO ENERGY INC Produced Fluid 4,962.20 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 XTO ENERGY INC Produced Fluid 867.20 Bbl INJECTION DISPOSAL WELL 34-133-21076
2015 XTO ENERGY INC Fracing Fluid Waste 22.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 2,431.80 Bbl INJECTION DISPOSAL WELL 34-133-24096
2016 XTO ENERGY INC Produced Fluid 1,297.60 Bbl INJECTION DISPOSAL WELL 34-133-21076
2016 XTO ENERGY INC Produced Fluid 15,733.40 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 8,633.16 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 1,054.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 850.46 Bbl INJECTION DISPOSAL WELL 34-133-21076
2017 XTO ENERGY INC Produced Fluid 429.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 XTO ENERGY INC Produced Fluid 2,308.44 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 702.69 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017 XTO ENERGY INC Produced Fluid 3,518.69 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017 XTO ENERGY INC Other Oil & Gas Wastes 54.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 383.76 Bbl INJECTION DISPOSAL WELL 34-133-24189
2018 XTO ENERGY INC Produced Fluid 200.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018 XTO ENERGY INC Other Oil & Gas Wastes 10.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 11,073.11 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 120.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019 XTO ENERGY INC Produced Fluid 2,251.79 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 688.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 872.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 1,134.00 Bbl INJECTION DISPOSAL WELL 34-133-21076

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2311233 Primary Facility 2014-10-07 Routine/Partial Inspection No Violations Noted
2316182 Primary Facility 2014-10-22 Routine/Partial Inspection No Violations Noted
2340102 Primary Facility 2015-01-28 Drilling/Alteration No Violations Noted
2343214 Primary Facility 2015-02-11 Routine/Partial Inspection No Violations Noted
2444163 Primary Facility 2016-01-26 Routine/Partial Inspection No Violations Noted
2523289 Primary Facility 2016-09-27 Routine/Partial Inspection No Violations Noted
2698882 Primary Facility 2018-02-27 Routine/Partial Inspection No Violations Noted On site for a routine partial inspection.

All wells on site are in production. Well tags in place. Wellheads fenced.

Production equipment, tank battery & GPUs, on containment. Combustor on site. Production equipment fenced. Sound wall installed on pad. Gathering pipeline connected to wells, with a pipeline launcher/receiver on pad.

All temporary E/S controls removed. PCSM plan implemented & PCSM BMPs installed. Site is 100% vegetated.

For data sources see[8]

References