If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-22217 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.874158,"lon":-79.7611,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Clearfield Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 150937 | |
Farm/Lease Name: BERGBIGLER A UNIT 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2014-03-27 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.874158 | |
Longitude: -79.7611 |
Date | Event |
---|---|
2014-03-27 | New Permit Application |
2014-10-04 | Performed Spud Operation |
2015-02-02 | Drilling Completion |
2015-07-13 | Perforation |
2015-11-20 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-07-15 | 2015-08-17 | 5,990 | 9,986,500 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Scale Inhibitor, ScaleHib A | Nalco | Scale Inhibitor | Other - (non-hazardous) | NA | 70 | 0.00743713 | 6925.44 |
Ethylene Glycol | 107-21-1 | 30 | 0.00318734 | 2968.04 | ||||
Hydrochloric Acid (7.5%) | Axiall | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.023803 | 22165.3 | |
Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0112278 | 10455.3 | ||||
Other - (non-hazardous) | NA | 92.5 | 0.553907 | 515797 | ||||
Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0098805 | 9200.7 | ||||
Hydrochloric Acid (15%) | Axiall | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.00384129 | 3577 | |
Hydrochloric Acid | 7647-01-0 | 15 | 0.0015945 | 1484.79 | ||||
Hydrochloric Acid | 7647-01-0 | 15 | 0.00181193 | 1687.27 | ||||
Other - (non-hazardous) | NA | 85 | 0.0410704 | 38244.7 | ||||
Friction Reducer, Unislick ST-50 | CESI Chemical | Friction Reducer | Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.0166573 | 15511.2 | |
Other - (non-hazardous) | NA | 70 | 0.0388669 | 36192.8 | ||||
Water | XTO | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 89.4947 | 83,337,300.0 | |
Sand (Proppant) | Universal | Proppant | Silica Substrate | NA | 100 | 9.78084 | 9,107,900.0 | |
Acid Inhibitor, Unihib G | GeoSafe | Acid Inhibitor | Methanol | 67-56-1 | 5 | 0.00001496 | 13.932 | |
Short chained glycol ether | 112-34-5 | 60 | 0.000179536 | 167.184 | ||||
Ethoxylated alcohol | 68002-97-1 | 35 | 0.00010473 | 97.524 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00000299 | 2.786 | ||||
Polyethylene Glycol | 25322-68-3 | 50 | 0.00541615 | 5043.51 | ||||
Thiourea | 62-56-6 | 1 | 0.00000299 | 2.786 | ||||
Acetophenone | 98-86-2 | 1 | 0.00000299 | 2.786 | ||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.00216646 | 2017.4 | ||||
Other - (non-hazardous) | NA | 30 | 0.00324969 | 3026.11 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 38,442.00 | 31 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 557,937.00 | 328 | 0.00 | 0 | 30.83 | 141 |
2017 | XTO ENERGY INC | 146,665.00 | 145 | 0.00 | 0 | 12.54 | 40 |
2018 | XTO ENERGY INC | 326,574.15 | 355 | 0.00 | 0 | 2.50 | 59 |
2019 | XTO ENERGY INC | 214,791.33 | 310 | 0.00 | 0 | 2.50 | 92 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | XTO ENERGY INC | Drill Cuttings | 637.22 Tons | LANDFILL | 100585 |
2015 | XTO ENERGY INC | Produced Fluid | 1,793.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2015 | XTO ENERGY INC | Drill Cuttings | 765.13 Tons | LANDFILL | 100585 |
2015 | XTO ENERGY INC | Produced Fluid | 4,962.20 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2015 | XTO ENERGY INC | Produced Fluid | 867.20 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2015 | XTO ENERGY INC | Fracing Fluid Waste | 22.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 2,431.80 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2016 | XTO ENERGY INC | Produced Fluid | 1,297.60 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2016 | XTO ENERGY INC | Produced Fluid | 15,733.40 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 8,633.16 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 1,054.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 850.46 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2017 | XTO ENERGY INC | Produced Fluid | 429.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XTO ENERGY INC | Produced Fluid | 2,308.44 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 702.69 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 3,518.69 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Other Oil & Gas Wastes | 54.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 383.76 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2018 | XTO ENERGY INC | Produced Fluid | 200.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | XTO ENERGY INC | Other Oil & Gas Wastes | 10.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 11,073.11 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 120.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Produced Fluid | 2,251.79 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 688.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 872.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 1,134.00 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2311233 | Primary Facility | 2014-10-07 | Routine/Partial Inspection | No Violations Noted | |
2316182 | Primary Facility | 2014-10-22 | Routine/Partial Inspection | No Violations Noted | |
2340102 | Primary Facility | 2015-01-28 | Drilling/Alteration | No Violations Noted | |
2343214 | Primary Facility | 2015-02-11 | Routine/Partial Inspection | No Violations Noted | |
2444163 | Primary Facility | 2016-01-26 | Routine/Partial Inspection | No Violations Noted | |
2523289 | Primary Facility | 2016-09-27 | Routine/Partial Inspection | No Violations Noted | |
2698882 | Primary Facility | 2018-02-27 | Routine/Partial Inspection | No Violations Noted | On site for a routine partial inspection.
All wells on site are in production. Well tags in place. Wellheads fenced. Production equipment, tank battery & GPUs, on containment. Combustor on site. Production equipment fenced. Sound wall installed on pad. Gathering pipeline connected to wells, with a pipeline launcher/receiver on pad. All temporary E/S controls removed. PCSM plan implemented & PCSM BMPs installed. Site is 100% vegetated. |
For data sources see[8]