If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-019-22219 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.874158,"lon":-79.761136,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Butler | |
Municipality: Clearfield Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 150937 | |
Farm/Lease Name: BERGBIGLER A UNIT 3H | |
License Status: | |
Spud Date: | |
Permit Date: 2014-03-27 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 40.874158 | |
Longitude: -79.761136 |
Date | Event |
---|---|
2014-03-27 | New Permit Application |
2014-10-04 | Performed Spud Operation |
2015-01-20 | Drilling Completion |
2015-07-14 | Perforation |
2015-11-20 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-07-15 | 2015-08-05 | 5,990 | 9,294,080 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Hydrochloric Acid (15%) | Axiall | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.0019367 | 1682.89 |
Hydrochloric Acid | 7647-01-0 | 15 | 0.00170429 | 1480.94 | ||||
Hydrochloric Acid | 7647-01-0 | 15 | 0.0041058 | 3567.73 | ||||
Other - (non-hazardous) | NA | 85 | 0.0438985 | 38145.5 | ||||
Acid Inhibitor, Unihib G | GeoSafe | Acid Inhibitor | Acetophenone | 98-86-2 | 1 | 0.00000276 | 2.399 | |
Short chained glycol ether | 112-34-5 | 60 | 0.000165676 | 143.964 | ||||
Polyethylene Glycol | 25322-68-3 | 50 | 0.00525794 | 4568.89 | ||||
Thiourea | 62-56-6 | 1 | 0.00000276 | 2.399 | ||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.00210318 | 1827.56 | ||||
Other - (non-hazardous) | NA | 30 | 0.00315477 | 2741.33 | ||||
Methanol | 67-56-1 | 5 | 0.00001381 | 11.997 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00000276 | 2.399 | ||||
Ethoxylated alcohol | 68002-97-1 | 35 | 0.00009664 | 83.979 | ||||
Water | XTO | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 89.2561 | 77,559,100.0 | |
Friction Reducer, Unislick ST-50 | CESI Chemical | Friction Reducer | Other - (non-hazardous) | NA | 70 | 0.0377453 | 32798.8 | |
Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.0161766 | 14056.6 | ||||
Hydrochloric Acid (7.5%) | Axiall | Acidizing | Other - (non-hazardous) | NA | 92.5 | 0.497035 | 431899 | |
Hydrochloric Acid | 7647-01-0 | 7.5 | 0.00886603 | 7704.14 | ||||
Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0213591 | 18560 | ||||
Hydrochloric Acid | 7647-01-0 | 7.5 | 0.010075 | 8754.7 | ||||
Sand (Proppant) | Universal | Proppant | Silica Substrate | NA | 100 | 10.0793 | 8,758,400.0 | |
Scale Inhibitor, ScaleHib A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.0032755 | 2846.24 | |
Other - (non-hazardous) | NA | 70 | 0.00764283 | 6641.24 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | XTO ENERGY INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 50,242.00 | 40 | 0.00 | 0 | 0.00 | 0 |
2016 | XTO ENERGY INC | 605,984.00 | 328 | 0.00 | 0 | 37.91 | 52 |
2017 | XTO ENERGY INC | 136,739.00 | 155 | 0.00 | 0 | 5.88 | 33 |
2018 | XTO ENERGY INC | 119,439.94 | 236 | 0.00 | 0 | 0.00 | 0 |
2019 | XTO ENERGY INC | 186,832.06 | 303 | 0.00 | 0 | 3.76 | 114 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | XTO ENERGY INC | Drill Cuttings | 650.23 Tons | LANDFILL | 100585 |
2015 | XTO ENERGY INC | Produced Fluid | 2,931.50 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2015 | XTO ENERGY INC | Drill Cuttings | 393.97 Tons | LANDFILL | 100585 |
2015 | XTO ENERGY INC | Produced Fluid | 7,493.80 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2015 | XTO ENERGY INC | Produced Fluid | 1,205.10 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2015 | XTO ENERGY INC | Fracing Fluid Waste | 22.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 2,598.70 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2016 | XTO ENERGY INC | Produced Fluid | 1,101.50 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2016 | XTO ENERGY INC | Produced Fluid | 14,107.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 7,538.71 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2016 | XTO ENERGY INC | Produced Fluid | 1,458.50 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 2,523.70 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2017 | XTO ENERGY INC | Produced Fluid | 830.65 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | XTO ENERGY INC | Produced Fluid | 2,198.61 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2017 | XTO ENERGY INC | Produced Fluid | 1,653.65 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2017 | XTO ENERGY INC | Produced Fluid | 4,625.77 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | XTO ENERGY INC | Other Oil & Gas Wastes | 54.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 160.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2018 | XTO ENERGY INC | Produced Fluid | 419.00 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2018 | XTO ENERGY INC | Produced Fluid | 12,553.44 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2018 | XTO ENERGY INC | Produced Fluid | 249.28 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
2019 | XTO ENERGY INC | Produced Fluid | 3,109.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2019 | XTO ENERGY INC | Produced Fluid | 1,326.48 Bbl | INJECTION DISPOSAL WELL | 34-133-24189 |
2019 | XTO ENERGY INC | Produced Fluid | 2,224.86 Bbl | INJECTION DISPOSAL WELL | 34-133-24096 |
2019 | XTO ENERGY INC | Produced Fluid | 858.39 Bbl | INJECTION DISPOSAL WELL | 34-133-21076 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2311236 | Primary Facility | 2014-10-07 | Routine/Partial Inspection | No Violations Noted | |
2313709 | Primary Facility | 2014-10-15 | Routine/Partial Inspection | No Violations Noted | |
2338040 | Primary Facility | 2015-01-21 | Routine/Partial Inspection | No Violations Noted | |
2444161 | Primary Facility | 2016-01-26 | Routine/Partial Inspection | No Violations Noted | |
2523287 | Primary Facility | 2016-09-27 | Routine/Partial Inspection | No Violations Noted | |
2698891 | Primary Facility | 2018-02-27 | Routine/Partial Inspection | No Violations Noted | On site for a routine partial inspection.
All wells on site are in production. Well tags in place. Wellheads fenced. Production equipment, tank battery & GPUs, on containment. Combustor on site. Production equipment fenced. Sound wall installed on pad. Gathering pipeline connected to wells, with a pipeline launcher/receiver on pad. All temporary E/S controls removed. PCSM plan implemented & PCSM BMPs installed. Site is 100% vegetated. |
For data sources see[8]